SettingsSettings for this calculationUS
The length of the garden bed or area.
Measure the area you're filling with topsoil.
Tools needed: Tape measure
The width of the garden bed or area.
Measure perpendicular to the length.
Tools needed: Tape measure
6-12 in (15-30 cm) is typical for a new garden bed; shallower for topping up an existing lawn.
Deeper beds are better for root vegetables and raised beds; shallower fills work for lawn leveling.
Estimated topsoil needed
0.9877 yd³
- Area
- 40 sq ft
They open the calculator with your figures already in it
Topsoil Calculator: 0.9877 yd³ — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Garden beds commonly use 6-12 in of topsoil depth, deeper than typical mulch (2-4 in) or gravel base applications
Inputs used
- Area Length
- 10 ft
- Area Width
- 4 ft
- Fill Depth
- 8 in
Intermediate steps
- Area
- 40 sq ft
What this calculation does not cover
- The answer is a loose volume and nothing turns it into weight, because no bulk density is asked for anywhere in the form — topsoil is very often quoted, delivered and tipped by the ton or tonne, and how much a cubic yard of it weighs moves with how wet it is, how much organic matter it carries and how finely it has been screened.
- No allowance for consolidation is folded in: the number is a bare length x width x depth, so soil tipped to the depth you typed will read shallower once it has been rained on and walked over, and making the level good again is a second, smaller order.
- The footprint is one rectangle carried at a single depth, so a curved border reads as its bounding box, ground that falls away across the bed is not picked up, and the room already filled by shrub root balls, stepping stones or the thickness of edging boards is never deducted.
- Fill depth is capped at 24 in (0.61 m) and each side at 50 m (about 164 ft), which puts berms, deep planting pits and field-scale regrading outside the form, and inside that band the depth entered is simply taken as correct — nothing checks that it gives enough rooting depth for what you intend to grow.
- Only soil going in is counted, with nothing coming out, so where turf has to be stripped or tired ground dug down before filling, neither the spoil to be carted away nor the level already occupied by what is there is netted off the delivery.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Part of a bigger job
This trade is one line of a job takeoff. Run the whole job and every other trade comes back with it, off the same measurements.
also measuresLandscape FabricMulchLawn Edging
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-05 · in the site-wide review of 2026-09-06 · v1.0.1
Regulatory standards & verification citations1
- Garden beds commonly use 6-12 in of topsoil depth, deeper than typical mulch (2-4 in) or gravel base applications
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.
Tools and safety for this job
To excavate by hand and excavate by machine. Generic types, no brands, no prices.
Protection this work requires
- Boards, blocks and bagged material cause most lasting back injuries on small sites: two people or a lifter for full sheets, and never a bag on one shoulder up a ladder.
- Digging blind strikes gas, water and power every day: get the plans, scan with a cable avoidance tool, and hand-dig trial holes over anything you find.
Excavate by machine: Operating an excavator is a trained and, in most markets, formally certified activity, and hiring one does not include that training. Underground services must be traced before any machine dig. This list covers the tools, not the competence.
Show the 6 tools this job needsHide tools
Essential
Cable and pipe detector
Shovel and spade
Tape measure
Wheelbarrow
Recommended
Spirit level
String line and pins
what each groundwork tool is for, and the spec that decides which to buy where one does.