SettingsSettings for this calculationUS
The standard allowance most suppliers and estimating guides assume for ordinary work.
The length of the bed or area to cover.
For an irregular bed, measure its longest straight run, or break it into rectangular sections and calculate each separately.
Tools needed: Tape measure
The width of the bed or area to cover.
Measure perpendicular to the length.
Tools needed: Tape measure
How deep a layer to spread.
2-3 in (5-7.5 cm) is typical for topping up existing mulch. 3-4 in (7.5-10 cm) for a fresh bed. Gravel bases are often 4+ in (10+ cm).
Tools needed: Tape measure or ruler to check depth as you spread
Mulch settles and beds are rarely perfectly level.
5-10% extra accounts for settling over time and an uneven base — better to have a little left over than run short.
Estimated mulch & gravel needed
0.662 yd³
- Area
- 65 sq ft
- Depth
- 3 in
- Volume (no extra)
- 0.6 yd³
They open the calculator with your figures already in it
Mulch & Gravel Calculator: 0.662 yd³ — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Standard landscaping formula: cubic yards = area (sq ft) x depth (inches) / 324
- 1-2 inch depth is typical for fine mulch top-ups; 3-4 inches for coarser new mulch or gravel bases
Inputs used
- Area Length
- 10 ft
- Area Width
- 6.5 ft
- Depth
- 3 in
- Extra for Settling (%)
- 10
Intermediate steps
- Area
- 65 sq ft
- Depth
- 3 in
- Volume (no extra)
- 0.6 yd³
What this calculation does not cover
- The covered area is one rectangle: `areaLength * areaWidth` and nothing else, so a curved border, a kidney-shaped bed, a circular tree ring or a path that turns a corner has to be broken into rectangles and each piece run separately before you add the yardages up. Each of those two fields also stops at 50 m (about 164 ft), and a longer run is clamped back to that bound rather than calculated.
- The depth you enter is spread flat across the whole measured area. Nothing thins the layer back from stems and trunks, dishes it around a drain cover or manhole, crowns a gravel path so it sheds water, or subtracts the mulch already sitting in the bed — the answer is a full new layer at the stated depth over the whole rectangle, and the depth field itself is capped at 12 inches (30.5 cm), so a deeper gravel fill is not what this describes.
- No material is named anywhere in the arithmetic, so shredded bark, wood chip, pea gravel, crushed stone and screened topsoil all come back as exactly the same volume. Bulk aggregate is normally sold and delivered by weight while mulch is sold by volume, and turning this volume into a weight for a gravel order needs a density figure the page never asks for.
- The "Extra for Settling" percentage is a single flat multiplier on the finished volume, capped at 25 per cent, and settling is what it is named for: mulch sinking and an uneven base. It is not a compaction allowance, so gravel that will be raked and plate-compacted to a finished depth needs more loose material delivered than the area-by-depth figure suggests, and nothing in the formula adds it.
- The figure comes back unrounded, at whatever fraction of a bulk unit the geometry gives. Bulk suppliers deliver in whole units of their own measure, by weight or in bulk bags and bagged mulch comes in fixed bag sizes, so this is the amount needed to cover the bed rather than the amount you can actually order — round up to the next unit your yard sells.
- Cost, where you switch it on, is applied through one installed-mulch rate per cubic yard for every result. Gravel, decorative stone and topsoil are priced at that same mulch rate, so the money figure tracks the volume correctly but not the material.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-05 · in the site-wide review of 2026-09-06 · v1.0.2
Regulatory standards & verification citations2
- Standard landscaping formula: cubic yards = area (sq ft) x depth (inches) / 324
- 1-2 inch depth is typical for fine mulch top-ups; 3-4 inches for coarser new mulch or gravel bases
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.