The Box Went Together in an Afternoon. The Filling Arrives on a Lorry
Three courses of 200 by 100 sleepers, sixteen coach screws and a level put the thing in the garden on Saturday. It measures 2.4 metres by 1.2 inside the timber, the top course stands 600 millimetres above the grass, and it is empty. Everything that goes in it now costs more than the timber did, arrives in one movement or not at all, and cannot be adjusted afterwards with a saw.
The asymmetry is worth naming before the yard is phoned. The volume itself is not in doubt — a rectangular void with three known dimensions is the least ambiguous measurement in the trade, with none of the offsetting and averaging that an irregular border demands. All of the uncertainty sits on the other side of the tape: how far a loose blend consolidates once it is watered, how much of it burns off over a growing season, and what fraction of the load should be compost rather than mineral soil. Get those wrong and the bed is still exactly the right size. It is simply half empty by June, or it is a peat bog, or it has to be topped up twice in a year nobody priced for.
One delivery is the goal because most yards apply a minimum bulk order and a delivery charge that does not scale down. Coming up 200 litres short does not save the price of 200 litres; it costs a second drop, or a trip with bags in the back of a car. So the number that goes through on the phone has to carry the settlement inside it, and the compost has to be decided at the same moment, because whether it comes pre-blended or as two separate heaps changes what is actually being ordered.
Measure the Void, Not the Timber
The dimension that matters is the inside face to inside face, and on a bed built from anything substantial the difference is not trivial. A 2.6 by 1.4 metre box built from 100 millimetre sleepers encloses 2.4 by 1.2, which is 2.88 square metres rather than 3.64 — a fifth of the order gone in one careless tape reading. Corner posts, cross-ties and a bracing batten across a long side each take their own slice; on a bed with a central tie the honest thing is to measure the two compartments separately and add them. A liner tacked to the walls takes almost nothing, but it does move the inside face inwards by its own thickness plus the batten holding it.
Depth is where the reading is most often optimistic. Fill depth is not wall height: the medium should finish 25 to 50 millimetres below the top course so that a hose or a heavy shower does not float the surface over the edge and down the timber. On ground that falls — and a lawn that looks flat rarely is — the bed is level and the ground is not, so the fill depth at the downhill end is greater than at the top. Measure both ends from the inside face of the timber down to the soil and work from the average, not from the end you happened to be standing at.
Depth Is a Crop Decision, Then a Structural One, Then a Volume
Salad, herbs and annual bedding are content in 150 millimetres. Most vegetables want 300. Carrots, parsnips, leeks and anything perennial want 450 or more, and the reason is only partly root length. A shallow bed is a container: it holds a small volume of water against a large evaporating surface, and in a dry fortnight the difference between 150 and 300 millimetres is the difference between watering every evening and watering twice a week. Depth buys reserve more than it buys room.
What sits underneath decides whether that is the whole story. Over open ground that has been forked through, the bed is a deep topsoil layer and roots carry on down past the timber, so the fill depth is a head start rather than a hard limit. Over a patio, a deck or compacted hardcore, the bed is a planter in every sense that matters — the entire root zone has to be inside the box, water can only leave through the base or the joints between boards, and both the depth and the coarseness of the medium have to be chosen accordingly.
Depth also loads the timber, and it does so faster than people expect. Retained fill pushes sideways in proportion to depth, and the resultant force on the wall grows with the square of it: a moist blend at roughly 1,100 kilograms per cubic metre, taken at the textbook at-rest condition, puts on the order of 25 kilograms per metre of wall against a 300 millimetre bed and something near 100 against a 600 millimetre one. Doubling the depth quadruples the push. That is why a long, tall bed made from dry-stacked sleepers bows outward at mid-span after its first winter, and why the cross-tie is not decoration.
The table below is the same 2.4 by 1.2 metre bed at each of the usual depths, with the finished volume and the volume actually ordered once a 20 per cent settlement allowance is carried. Read down the last column before choosing: the step from 300 to 450 millimetres adds two thirds of a cubic yard, which on most price lists is the difference between a comfortable order and one that wants thinking about.
| What the bed is for | Fill depth | Finished volume | Ordered at +20% |
|---|---|---|---|
| Salad, herbs, annual bedding | 150 mm (6 in) | 0.43 m³ | 0.52 m³ / 0.68 yd³ |
| Bush beans, brassica transplants | 200 mm (8 in) | 0.58 m³ | 0.69 m³ / 0.90 yd³ |
| Most vegetables, mixed planting | 300 mm (12 in) | 0.86 m³ | 1.04 m³ / 1.36 yd³ |
| Root crops, potatoes, perennials | 450 mm (18 in) | 1.30 m³ | 1.56 m³ / 2.03 yd³ |
| Deep-rooted perennials, shrubs | 600 mm (24 in) | 1.73 m³ | 2.07 m³ / 2.71 yd³ |
What Actually Goes in the Box, Bottom to Top
Turf underneath a bed 300 millimetres deep or more does not need lifting. It dies in the dark, rots in place and leaves the soil beneath it better than it found it, which is more than can be said for the compaction caused by skimming it off with a spade in wet weather. What the base does need is loosening: a fork driven in and rocked, on a grid of a foot or so, over the whole footprint. That single pass is what turns the bed from a container standing on a lid into a deep profile roots and water can both leave through. Where voles or gophers are a known problem, a sheet of galvanised weld mesh goes down before anything else, run up the inside of the timber by 50 millimetres and stapled.
In a deep bed, a coarse core in the bottom third is a legitimate way to spend less on imported medium — logs, prunings, turves stacked grass-side down, the woody half of last year's clearance. It is also the single biggest cause of a bed that sinks alarmingly in year two, because that material loses most of its bulk as it decays. Treat it as a deliberate trade: cheaper now, a substantial top-up later, and never within 300 millimetres of the surface where the seedbed has to be stable. In a 300 millimetre bed there is no room for it at all.
What does not belong at the bottom is a drainage layer of gravel. Water does not cross from a fine-pored medium into a coarse one until the fine material immediately above the interface is close to saturated, so a stone layer under soil does not drain the bed — it holds a wet zone at the base and raises it. That is a capillary break, the same effect deliberately engineered into a landfill capping layer to stop water moving downward, and it works exactly as well in reverse when nobody wants it. If a bed on a hard surface needs to drain, the answer is gaps or holes through the base and a medium coarse enough to shed, not a course of shingle.
The imported material has to be worth importing. Subsoil out of an extension trench is not topsoil, and the distinction has a document behind it in both directions: BS 3882, Specification for topsoil, and BS 8601, Specification for subsoil and requirements for use, describe two different products with different tests, and ASTM D5268, Standard Specification for Topsoil Used for Landscaping Purposes, covers the same ground in North America. Screened is worth paying for on a bed you will hand-weed; unscreened topsoil arrives with couch and bindweed rhizomes in it, and a raised bed is the worst possible place to discover that, since the whole point of the box is that the weed seed bank inside it starts at nothing. Where the garden has an industrial or old-paint history, the reason for importing is the contamination itself, and the guidance to work to is the regulator's — in the United States, the Technical Review Workgroup recommendations issued by the EPA on gardening and reducing exposure to lead-contaminated soils — which turns on a clean imported profile and a barrier, not on a number this page could publish.
The box and its fill, cut through the middle
- Annual compost dressing — 25 to 50 mm laid on the surface each spring and left for the worms, which is what replaces the organic matter the season burned off Mulch Calculator
- Blended growing medium — the bulk of the delivery: screened topsoil with compost mixed through it, bought at the finished depth plus a settlement allowance Garden Soil Calculator
- Coarse bulk core — logs, turves and woody clearance in the bottom third of a deep bed only, bought at nothing and paid for later in a top-up
- Forked native ground — loosened on a grid before a single barrow arrives, because it is the only route by which water and roots leave the box
- Timber frame — measured inside face to inside face, since the internal dimensions and the freeboard below the top course set every quantity on the order
Settlement Is the Whole Distance Between the Order and the Finished Level
A bed filled flush on Sunday reads two fingers down by the end of the month, and nothing has gone wrong. Loose medium arrives with large air-filled pores between the aggregates, and the first heavy watering collapses a good proportion of them; the particles rearrange into a tighter packing and the surface drops. Fifteen to twenty-five per cent is the usual band, twenty is a sound working figure for a topsoil-based blend, and the richer in compost the mix is the further up that band it lands. This is a property the growing-media standards actually measure — BS EN 13041 determines dry bulk density, air volume, water volume and a shrinkage value for exactly this class of material — so it is not folklore, it is a number a producer could quote if asked.
Work it forwards, not backwards. The 2.4 by 1.2 metre bed filled to 450 millimetres has a finished volume of 1.296 cubic metres; carrying twenty per cent puts the order at 1.56 cubic metres, or a shade over two cubic yards, which is a sensible thing to say to a yard. Do not instead order the finished volume and fill deeper to compensate, because that just spends the freeboard: the bed goes in overfull, washes over the timber for a fortnight, and settles to the level it was always going to reach.
There is a second, slower loss underneath the first, and confusing the two leads to the wrong fix. Consolidation is mechanical and it is largely over within a few weeks of watering. Mineralisation is biological: the organic fraction is being eaten, and what leaves is carbon dioxide, so a bed with a lot of compost in it keeps losing volume across the whole first season and into the next. Watering it in cannot prevent that, and the answer is not a bigger first order — it is the annual dressing that every productive bed needs anyway. Fill in lifts of 150 millimetres or so and water each lift before the next goes on, and most of the mechanical share happens while the barrow is still on the drive rather than after the seedlings are in.
Put the internal dimensions and the fill depth in with the settlement allowance you have decided on, and read the ordering volume rather than the finished one — the litres and cubic yards beside it are the units the yard will want to hear.
Length of the bed.
Width of the bed.
Depth of growing medium.
Extra to order because loose medium settles.
Soil required
1.741 yd³
Geometry plus a settlement allowance. Weight assumes a moist topsoil blend at about 1000 kg/m³ (62 pcf).
- Finished volume
- 1.45 yd³
- Litres
- 1,330.89 L
- Cubic yards
- 1.74 yd³
- 60 L bags
- 23 bags
- Approximate weight
- 2,934.11 lb
They open the calculator with your figures already in it
Garden Soil Calculator: 1.74 yd³ — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
What this calculation does not cover
- The settlement allowance is added to the finished volume rather than divided out of it, so a 20% entry buys 1.2 times the bed's measured capacity and not the 1.25 times needed to still sit level with the rim once the medium has consolidated — expect the surface to finish a few percent low, and order at the top of the range where flush matters.
- Nothing in the inputs describes what is being bought, so the weight row applies one density to every medium: the two figures this page cites for bulk density span 550 to 1300 kg/m³ (34 to 81 pcf), which is enough to put a tonne-priced load or a weight-limited vehicle out by a third in either direction.
- Depth is treated as new material from top to bottom, with nothing deducted for the soil already in the bed or for plants and rootballs standing in it, so a top-up should be entered as the thickness of fresh medium rather than the bed's full height.
- Length and width are the space being filled rather than the outside of a frame — measuring across the boards adds two thicknesses on each axis — and a single depth is multiplied over the whole footprint, so a mound with sloping sides, or ground that falls away beneath the bed, holds less than the box these three numbers describe.
- The headline is a raw volume, not a purchase quantity: bulk bags and tipper loads are sold in fixed sizes and only the 60 litre (2 cu ft) bag row is rounded up, so round the bulk volume yourself to whatever increment the yard actually delivers in.
How Much of the Load Should Be Compost
This is not a recipe question, it is a target question, and the target is easy to overshoot because compost behaves so well in the first year. A bed filled with pure compost or with a bagged mix that is mostly compost grows a spectacular first crop, drains beautifully, and then loses a fifth of its depth, because most of what is in it is on its way to becoming carbon dioxide. Mineral soil is what gives a bed its stability, its water-holding at the dry end, and its capacity to hang on to nutrients. Compost is what gives it structure, biology and something to feed on — and it is a consumable, replaced annually, not a substance the bed is built from.
A quarter to a third by volume is the sensible band for a new fill, with the balance a screened topsoil. On the worked example that is roughly 0.39 cubic metres of compost against 1.17 of soil out of the 1.56 ordered — one bulk bag of compost and the rest as topsoil, if the yard sells it that way, or a pre-blended raised bed mix with the ratio stated on the ticket. After the first year the requirement drops sharply: 25 to 50 millimetres spread over the surface each spring, which on a 2.88 square metre bed is only 70 to 145 litres, a couple of bags.
The arithmetic below was built for improving an existing bed — a compost layer spread over an area and dug into a working depth — and it drives a new fill perfectly well if you read the inputs literally. The compost layer is the compost's share of the total lift, the incorporation depth is the mineral share, and the percentage that comes back is the compost's proportion of the two added together. Enter 112 millimetres of compost over 338 of soil and it returns twenty-five per cent, which is the blend, not a soil test. It assumes the mineral fraction brings no organic matter of its own, so read the figure as a ceiling on what you have added rather than as the number a laboratory would report.
Those two ways of stating organic content are genuinely different quantities, and mixing them up is how a bed ends up far richer than intended. A soil laboratory reports organic matter as a percentage of dry mass, by loss on ignition — the method family that ASTM D2974, Standard Test Methods for Determining the Water (Moisture) Content, Ash Content, and Organic Material of Peat and Other Organic Soils, sits in — while everything on a landscaping order is volume. Compost at around 550 kilograms per cubic metre against screened topsoil at about 1,300 means a quarter of the bed by volume is nearer an eighth of it by mass, and only part of that mass is organic matter at all. Quality has its own paperwork worth asking for: PAS 100, Specification for composted materials, in the United Kingdom, and in North America a Seal of Testing Assurance report from the US Composting Council with results run to the TMECC test methods. Both cover the two things that actually bite — maturity, since immature material with a wide carbon-to-nitrogen ratio locks up nitrogen while it finishes, and soluble salts, since fresh manures and some green-waste composts arrive with a conductivity that will scorch seedlings. Raw manure is a separate matter again, and where the produce is for eating, the interval to work to is the one in the USDA National Organic Program rule at 7 CFR 205.203: 120 days between application and harvest of a crop whose edible portion touches the soil, 90 days otherwise.
Set the area to the inside of the timber, the layer to the compost share of the lift and the incorporation depth to the soil share, and the resulting proportion tells you whether the blend is a growing medium or a compost heap with sides on it.
Area of bed or plot.
Depth of compost spread before incorporating.
How deep it is dug or tilled in.
Compost required
1.36 yd³
Volume is exact; the resulting organic percentage assumes even incorporation, which hand digging achieves better than a rotavator on a first pass.
- Litres
- 1,038.28 L
- 50 L bags
- 21 bags
- Cubic yards
- 1.36 yd³
- Resulting organic content by volume
- 25 %
- Approximate weight
- 1,258.96 lb
They open the calculator with your figures already in it
Compost Blend Calculator: 1.36 yd³ — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
What this calculation does not cover
- The resulting organic percentage divides the compost layer by the compost plus the soil beneath it, which counts the compost as entirely organic matter and the ground it goes into as carrying none, so a bed improved in previous seasons finishes above the figure shown and a bagged blend bulked out with sand or loam finishes below it.
- That percentage is a by-volume figure read at the moment of mixing, and a laboratory soil test reports organic matter by weight instead — compost is light enough against mineral soil that the two numbers do not convert into one another.
- Nothing in the volume allows for the material shrinking as it rots down, so an autumn dressing measured again in spring sits thinner than the depth entered and its share of the working layer drifts down with it.
- Approximate weight is the volume multiplied by one fixed density, which does not move with how wet the load arrives or with the difference between a light green-waste compost and a heavier loam-based blend, so treat it as a barrow-and-trailer guide rather than a delivery weight.
- The bag figure assumes a 50 litre (about 1.8 cu ft) sack and rounds up to whole bags, so if your supplier sells another size you need to divide the volume line yourself.
- Area is spread at one uniform depth with nothing deducted for established plants, crowns or the paths you will not be dressing, so enter the ground you actually intend to cover rather than the footprint of the whole plot.
The Bag Count Is the Argument for Bulk
Run the same bed as bags and the answer stops being abstract. At the finished volume of 1.296 cubic metres, that is 26 bags of 50 litres in a metric market or 31 bags of one and a half cubic feet in North America — and those two counts are reached separately on purpose, because a bag is a product and not a unit of measurement. Nobody converts a 50 litre bag into 1.5 cubic feet at the checkout. Either way it is most of a pallet, a car boot filled four or five times, and thirty pieces of plastic to dispose of, for material that costs several times what the same volume costs loose. The bag at least is an honest measure — BS EN 12580, Soil improvers and growing media — Determination of a quantity, is the method behind the litres printed on it — which is more than can be said for a heaped barrow or a bay that has been rained on.
The crossover sits somewhere around a single cubic yard, and it moves with access rather than with price. Bags win where there is no vehicle access, where the work has to be split across weekends, or where a heap on a newly cleaned drive is not acceptable. Bulk wins on anything bed-sized, provided there is somewhere to put it. And the year-two top-up is firmly a bag job: 100 litres is two bags and no delivery charge at all, which is worth remembering when the temptation is to over-order now to avoid ordering again later.
Count the bags before dismissing them — the number this returns is either a manageable trip to the garden centre or the clearest possible case for phoning the yard instead.
The length of the raised bed.
The width of the raised bed.
The depth of soil you're filling, which may be less than the full bed wall height.
Soil bags needed
11 x 1.5 cu ft bags
- Soil volume
- 15.67 ft³
They open the calculator with your figures already in it
Raised Garden Bed Soil Calculator: 11 x 1.5 cu ft bags — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
What this calculation does not cover
- The count is locked to one bag size — 1.5 cu ft on the imperial view, 50 L on the metric one. Other stocked sizes (1 cu ft, 2 cu ft, 40 L, 60 L) and bulk-by-the-yard or by-the-tonne deliveries are outside it, and a printed bag volume is loose product that occupies less once it is wetted and settled in the bed.
- The figure is a straight length x width x depth with no allowance for settling, for the top-up most beds need after the first season, or for spillage and part-bags. The only slack in the number is the fraction of a bag rounded up at the end.
- It assumes a rectangular bed with vertical sides and one uniform fill depth. Tapered, circular, keyhole and L-shaped beds, beds stepped down a slope, and any bottom layer — drainage gravel, a hugelkultur wood core, landscape fabric or gopher wire — are not modelled; split those into layers or rectangular sections and add them up.
- This is a volume, not a growing-medium specification. It says nothing about what to fill with — a raised bed is normally filled with a blend rather than straight topsoil — and it does not check drainage, pH, nutrients, or whether the mix, the ground beneath it, or the bed material itself is suitable for food crops.
- A volume figure is not a load check. Filled and watered, a bed this size is heavy enough to matter on a balcony, roof terrace, timber deck or paved podium, and nothing here confirms that structure will carry it or that the bed walls can resist the outward pressure of the fill — the reason tall, thin sides bow and split.
Getting a Loose Heap Through a Side Gate
The delivery is one drop in one place, and every metre between that place and the bed is barrow work. Two cubic yards of moist blend is somewhere between one and a half and one and three-quarter tonnes depending on how much of it is compost and how wet the yard's bay was, which is the better part of twenty loads in an 85 litre builder's barrow. Decide before the lorry arrives where the heap can stand, put boards down if that place is block paving or a lawn, and have a tarpaulin ready — a heap left uncovered through a wet night gains weight, sheds fines into the gully, and becomes markedly less pleasant to shovel.
Filling is not tipping. Barrow in, spread with a rake rather than the barrow, and resist walking on the surface: the entire point of a raised bed is that its medium never gets compacted, and a boot print in the first lift is still there in three years. Work in lifts, water each one, and leave the freeboard deliberately short at the top rather than filling to the timber and hoping. If the load runs out slightly high, that is what the last lift is for; if it runs out slightly low, the settlement allowance has already done its job and the bed is at the level it was designed for.
- Fork the base on a grid across the whole footprint, and lay weld mesh first if burrowing animals are a known problem.
- Stack any coarse core in the bottom third only, packed rather than piled, and keep it 300 millimetres clear of the finished surface.
- Barrow in a lift of roughly 150 millimetres, forking the compost share through it if the load did not arrive pre-mixed, and rake it level — taking the barrow no further than the edge of the timber and turning the blend with a fork rather than a rotavator.
- Water that lift until it is damp through, then leave it while the next barrows are loaded.
- Repeat until the surface sits 25 to 50 millimetres below the top course, checking the depth against a marked stick rather than by eye.
- Water the whole bed heavily once more and leave it a week before planting, so the mechanical settlement happens before anything is in it.
- Cover the heap or clear the drop point the same day, because bulk material left on a hard surface stains it and washes into drains.
What the Bed Tells You in March
A drop of 40 or 50 millimetres over the first winter is consolidation and organic matter doing what they do, and it is corrected with a dressing. A drop of 100 or more, with a surface that has gone dark, fluffy and quick to dry out, is a diagnosis: the compost fraction was too high, and the bed is losing its bulk because there was never enough mineral soil in it to hold a level. The fix is counter-intuitive to anyone who associates compost with generosity — it is a screened topsoil top-up, not more compost, and the following year's dressing should go back to 25 millimetres.
Beyond that the bed only needs the annual layer, laid on the surface and left for the worms rather than dug in. Over several seasons the level creeps back up towards the rim, which is the sign the system is working, and the freeboard quietly comes back as something to manage rather than something to chase. The one number worth writing on the underside of the timber before the first planting is the ordered volume, because in five years' time, when the bed is rebuilt or a second one is added alongside it, that figure is the only part of this afternoon anyone will need again.
Settle these before the yard is phoned
One void, one delivery and two separate shrinkage mechanisms. Everything below is decided before the order goes through, because a bed is the one job where coming up short costs a second delivery charge rather than a second trip to the van.
- Internal dimensions, taken inside face to inside face — Sleeper thickness, corner posts and any cross-tie all come off the volume. On a 1.2 m wide bed, measuring the outside of 100 mm timber puts a quarter more material on the order than the box can hold.
- Fill depth chosen against the crop and against what is underneath — 150 mm for salad, 300 for most vegetables, 450 for roots and perennials — and the whole root zone inside the box if the bed stands on a patio or a deck.
- Freeboard held back at the top — Finish 25 to 50 mm below the top course. Filling flush and hoping means a fortnight of medium washing over the timber every time it rains.
- Settlement allowance carried on the order, never on the depth — Twenty per cent on a topsoil-based blend, nearer twenty-five if it is compost-rich. Order deeper, not fill deeper.
- Compost share fixed by volume, with the paperwork requested — A quarter to a third for a new fill and 25 to 50 mm a year after that. Ask for the PAS 100 conformance or the STA report, and treat maturity and conductivity as the two figures that matter.
- Where the heap stands, and how far the barrow runs from it — Two cubic yards is the better part of twenty loads in an 85 litre barrow. Boards down on paving, a tarpaulin ready, and the drop point cleared the same day.
Opens the calculators above on one screen with the dimensions from this article already filled in. Quantities only — this site publishes no price list, because local prices vary too much to publish honestly.
