Roofing calculators

Every roofing quantity starts with an area that is not on the plan. A 30° roof covers about 1.155 times the footprint beneath it, a 45° roof 1.414 times, and an estimate built on the plan area is short by that factor before a single tile is counted.

  • 48Calculators
  • 4Parts of the site

Roofing has a material hub: the Roofing hub adds how its quantities are worked out, the documents each market cites, the guides and any takeoffs and worked examples.

How roofing is measured

Square metres on the slope for coverings and underlay, linear metres for every edge — ridge, hip, valley, verge, eaves and abutment — and counts for fixings at a schedule set by the exposure. Slates and tiles are then ordered by the course, which is a function of the lap rather than of the area.

Where roofing sits on this site48 across 4
48

Renovation & Construction12

Insulation & Efficiency1

Materials & Quantities34

Sustainability & Compliance1

What gets left off a roofing order

  • Double courses at the eaves and the cut course at the ridge, both of which use more material per metre than the field.
  • Valleys and hips: the cutting waste along a diagonal is material bought and thrown away, and it grows with the tile format.
  • Fixings to the exposure zone rather than to the manufacturer's minimum — a perimeter and a corner zone take more than the middle of the roof.
  • Everything that penetrates: vents, boots, soil pipes and rooflights each take a flashing, a cut and a labour item the area never shows.

Job takeoffs12

Where roofers meet the rest of the job: each runs one of these calculators, with every other trade in the same job beside it.

Worked examples2

A real job estimated step by step, with this trade's steps counted.

Calculator examples5

One job through one of this trade's calculators, with the calculator's own working shown step by step.

Comparisons16

Two ways of doing the same work, weighed against each other.

Planners5

Work this trade out from a space rather than from a job.