By trade
Cladding calculators
Cladding is bought by the square metre and fitted by the piece, and the gap between those two is trim. What decides a cladding order is the reveal or the cover width, which turns an area into a number of boards, and then the corners, starters and edges that are all linear.
- 23Calculators
- 2Parts of the site

How cladding is measured
Square metres of face for panels and coats, linear metres for every trim and furring run, and counts for fixings at the schedule the system specifies — which for a rainscreen is a density per square metre and for lap siding a rule per board per stud.
Renovation & Construction3
Materials & Quantities20
- Corrugated Metal Panel Side Lap Overlap Calculator
- EIFS Base Coat Reinforcing Mesh Consumption Calculator
- EIFS Finish and Primer Pail Count Calculator
- EIFS Foam Board Adhesive Coverage Calculator
- EIFS Impact-Resistant Mesh Reinforcement Zone Calculator
- EIFS Insulation Board Thickness Calculator
- EIFS Reinforcing Mesh Roll Count Calculator
- Fiber-Cement Siding Caulk Joint Volume Calculator
- Fiber-Cement Siding Corner Post Calculator
- Fiber-Cement Siding Cutting Waste Factor Calculator
- Fiber-Cement Siding Plank Reveal & Course Calculator
- Hat Channel (Metal Furring) Anchor Spacing Calculator
- Lap Siding Fastener Schedule Calculator
- Rain-Screen Cladding Furring Strip Calculator
- Rain-Screen Cladding Panel Fastener Calculator
- Rain-Screen Cladding Ventilation Net Free Area Calculator
- Vinyl Siding Fastener Count Calculator
- Vinyl Siding Starter Strip Linear Footage Calculator
- Vinyl Siding Undersill/Utility Trim Calculator
- Vinyl/Fiber-Cement Siding J-Channel Trim Calculator
What gets left off a cladding order
- The cover width versus the board width. A 150 mm board with a 25 mm lap covers 125 mm, and that difference is a fifth of the order.
- Corner posts, starter strips, J-channel and undersill trim — the linear items that cost more per metre than the panels they finish.
- Ventilation and drainage behind a rainscreen: the cavity has to breathe, and the openings and insect mesh are part of the system.
- Cutting waste around openings, which on a façade with many windows is material rather than a rounding error.
Job takeoffs6
Where cladders meet the rest of the job: each runs one of these calculators, with every other trade in the same job beside it.
Comparisons9
Two ways of doing the same work, weighed against each other.
Planners1
Work this trade out from a space rather than from a job.