A surface is the visible tenth of a paving order. What is under it — the sub-base, the bedding, the edge restraint holding it all in — is most of the material and all of the difference between a drive that lasts and one that ruts in a winter.

  • 40Calculators
  • 5Parts of the site

How paving and surfacing is measured

Compacted cubic metres or tonnes for the sub-base and bedding, tonnes for asphalt at a laid density, units per square metre for blocks at a pattern, and linear metres for edgings and kerbs. Compacted depth is not delivered depth, and the difference is ordered.

Where paving and surfacing sits on this site40 across 5
40

Materials & Quantities22

Auto/Utility9

Landscaping & Outdoor4

Sustainability & Compliance2

Heavy Civil & Infrastructure3

What gets left off a paving and surfacing order

  • Edge restraint and its haunching, without which block paving spreads — a linear concrete order inside a square-metre job.
  • Cutting waste on a pattern. Herringbone at 45° cuts every perimeter block and wastes noticeably more than a stretcher bond.
  • Jointing sand or mortar, and the topping-up it needs after the first rain.
  • Falls and where the water goes, which cannot be corrected afterwards without lifting the surface.

Job takeoffs3

Where surfacing gangs meet the rest of the job: each runs one of these calculators, with every other trade in the same job beside it.

Worked examples3

A real job estimated step by step, with this trade's steps counted.

Calculator examples1

One job through one of this trade's calculators, with the calculator's own working shown step by step.

Comparisons11

Two ways of doing the same work, weighed against each other.

Planners3

Work this trade out from a space rather than from a job.