By trade

Plastering calculators

Plaster is bought by the bag and used by the coat, and the same area takes a different quantity on every background. A suction-hungry block wall, a skimmed board and a lathed elevation are three different orders for one square metre.

  • 12Calculators
  • 2Parts of the site

How plastering is measured

Square metres per coat at a thickness, converted to bags by the coverage the product quotes for that thickness — which is a quantity per coat, not per wall. Render is mixed by proportion, so the cement, lime and sand are three orders from one volume.

What gets left off a plastering order

  • The background. Coverage figures are quoted on a flat, low-suction surface, and very little of a real building is one.
  • Beads and stops: angle, stop and movement beads are linear items whose quantity comes from the elevation's edges rather than its area.
  • Scaffolding and access for external render, which is usually a larger line than the render.
  • Drying time between coats, which is programme rather than material and is the constraint that actually decides the finish date.

Job takeoffs17

Where plasterers meet the rest of the job: each runs one of these calculators, with every other trade in the same job beside it.

Worked examples2

A real job estimated step by step, with this trade's steps counted.

Calculator examples1

One job through one of this trade's calculators, with the calculator's own working shown step by step.

Comparisons3

Two ways of doing the same work, weighed against each other.

Planners2

Work this trade out from a space rather than from a job.