Drywall is the clearest example of a quantity that produces other quantities. The boards come from the area; the tape, the compound and the screws come from the number of boards and how they meet each other — which is why boarding a ceiling as well as the walls changes the tape figure by less than doubling it.

  • 40Calculators
  • 2Parts of the site

Drywall has a material hub: the Drywall hub adds how its quantities are worked out, the documents each market cites, the guides and any takeoffs and worked examples.

How drywall is measured

Sheets for the boards, linear metres for the joints, kilograms or buckets for the compound, and counts for screws at a spacing set by the framing. A finish level changes the compound figure more than the board format does.

Where drywall sits on this site40 across 2
40

Renovation & Construction7

Materials & Quantities33

What gets left off a drywall order

  • The angle where the wall meets the ceiling: one internal joint, taped once, however much of it is new board.
  • Corner bead and edge trim, which are linear and are ordered separately from the tape.
  • Second and third coats. Compound quantities are quoted per coat, and a level 4 or 5 finish is several of them plus sanding.
  • Access panels, service penetrations and the framing around them, none of which appear in a wall area.

Job takeoffs15

Where dry liners meet the rest of the job: each runs one of these calculators, with every other trade in the same job beside it.

Worked examples4

A real job estimated step by step, with this trade's steps counted.

Calculator examples2

One job through one of this trade's calculators, with the calculator's own working shown step by step.

Comparisons9

Two ways of doing the same work, weighed against each other.

Planners4

Work this trade out from a space rather than from a job.