Ice & Water Shield Calculator

Estimate how many rolls of self-adhered ice & water shield membrane you need for your roof eaves.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
The total length of eave needing protection.

Measure along each eave that needs ice & water shield and add them together.

Tools needed: Tape measure or measuring wheel, Ladder

How far up the roof slope the membrane needs to extend from the eave.

Many codes require coverage extending at least 24 in inside the exterior wall line — on a sloped roof this often means 2 or more roll-widths, so this can exceed a single 36 in roll's width.

Ice & water shield rolls needed

1 roll

Medium confidence

Required coverage width and whether ice & water shield is code-mandated in your area both depend on local climate zone rules — check your local building code before finalizing coverage width.

Coverage area needed
161.7 sq ft
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • A standard self-adhered ice & water shield roll (36 in wide) covers approximately 200 sq ft; area = eave length x membrane width

Inputs used

Total Eave Length
49 ft
Coverage Width From Eave
36 in

Intermediate steps

Coverage area needed
161.7 sq ft
Final result1 roll

Confidence note: Required coverage width and whether ice & water shield is code-mandated in your area both depend on local climate zone rules — check your local building code before finalizing coverage width.

What this calculation does not cover

  • The 10% uplift is spent on laps before it ever reaches waste. Self-adhered membrane laps at the manufacturer's figure — commonly 3 to 4 in (75 to 100 mm) on a side lap and 6 in (150 mm) on an end lap — so a 36 in (915 mm) roll nets about 33 in of covered deck, roughly 9% gone before a knife touches it, and a long eave loses more again at each end joint. Everything cut off at a hip, a rake or a corner comes out of what is left.
  • Only an eave strip is ever returned. Where a roof falls below its covering's minimum slope — many asphalt shingle systems stop at 2:12 — the remedy is usually not a wider eave course but membrane or doubled underlayment over the entire deck, and low-pitched porch roofs, shed extensions and dormer tops are exactly where that comes up. A whole-deck area is a different sum from an eave length times a width.

Estimated cost — your price

This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.

49 ft3 ft
Schematic, drawn to the proportions you entered — not to scale on screen.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-06 · in the site-wide review of 2026-09-06 · v1.0.1

Regulatory standards & verification citations1
  1. A standard self-adhered ice & water shield roll (36 in wide) covers approximately 200 sq ft; area = eave length x membrane width
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Tools and safety for this job

To lay the roof underlay. Generic types, no brands, no prices.

Protection this work requires

  • Most fatal falls on small jobs are from under three metres: use a tower or a ladder tied at the top, and never work off the top two rungs.
  • Knives cause more site injuries than any power tool: cut away from your body, change blades often, and wear cut-resistant gloves to EN 388 level C for repeated cutting.
Show the 3 tools this job needs

Essential

  • Tape measure

  • Utility knife

Recommended

  • Staple gun

Also needed as materials: replacement blades, staples.

what each roofing tool is for, and the spec that decides which to buy where one does.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

  • Shingling a Roofuses this calculator

    Shingling judged the way water judges it: every lap, nail and flashing traced from the ridge slot down to the gutter line.

Called something else where you work? Ice dam — the term in each market, how close the equivalence really is, and the standard that governs it.

Already have some? How much eave will my rolls of ice and water shield cover?

Worked example: Shingle roof replacement — step 5 of 11

How to calculate ice & water shield in 3 steps

  1. Total Eave LengthThe total length of eave needing protection.
  2. Coverage Width From EaveHow far up the roof slope the membrane needs to extend from the eave.
  3. Ice & water shield rolls neededThe tool computes the ice & water shield rolls needed from those figures and shows the formula, its sources, and a confidence rating alongside it.

Ice & water shield rolls needed by total eave length

Page defaults, not your figures above.

Total Eave LengthIce & water shield rolls needed (rolls)
20 ft1
40 ft1
60 ft1
80 ft2

Frequently asked questions

Do all climates require ice & water shield?
It's most commonly required by code in colder climates prone to ice dams, where meltwater can back up under shingles at the eave — check your local building code, since requirements (and required coverage width) vary by climate zone.
Does this cover valleys too?
No — this estimates eave coverage only. Roof valleys are also commonly required to have ice & water shield and should be measured and estimated separately by valley length.
Can I skip this if I already have gutters and good insulation?
Gutters and attic insulation/ventilation help prevent ice dams but don't eliminate the code requirement in many jurisdictions — check local code rather than assuming it's optional.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.