The width of the shed, across which skids are spaced.
Measure the shed's floor width.
The length of the shed, which sets each skid's length.
Each skid runs the full length of the shed floor.
Skids needed
6 skids
This assumes a standard 2 ft (0.61 m) skid spacing suitable for typical small-to-mid-size sheds — larger sheds or heavier floor loads may need closer spacing or a different foundation type (concrete piers or a full slab) per your local code.
- Length of each skid
- 12 ft
They open the calculator with your figures already in it
Shed Foundation Skid Calculator: 6 skids — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Skid count = (shed width / skid spacing) + 1; each skid runs the full length of the shed, spaced at a standard 2 ft interval across the width
Inputs used
- Shed Width
- 10 ft
- Shed Length
- 12 ft
Intermediate steps
- Length of each skid
- 12 ft
Confidence note: This assumes a standard 2 ft (0.61 m) skid spacing suitable for typical small-to-mid-size sheds — larger sheds or heavier floor loads may need closer spacing or a different foundation type (concrete piers or a full slab) per your local code.
What this calculation does not cover
- The count comes from the Shed Width field alone — width decides how many runners, while length only sets how long each one is — so typing the two dimensions the other way round returns a different number of skids, and the layout takes it for granted that the floor joists cross the runners rather than sitting parallel to them.
- Skid size is never chosen here: there is no entry for a 4x4 against a 4x6, or for species and grade, so the beam depth carrying the floor between its bearing points, and the joist span across the gap between runners, still have to be sized on their own.
- Ground preparation sits outside the answer entirely — the gravel bed beneath the runners, its depth and footprint, the levelling work, and any blocks or pads the skids rest on are none of them counted, and the result behaves as though the ground is already flat and draining.
- Each skid is reported at exactly the shed's length, with no overhang past the floor frame for skidding or blocking, no cutting allowance, and no rounding to a stock beam length, so a runner that lands between sizes is still bought at the next length up and a shed longer than the longest beam available needs a splice this figure does not reveal.
- Nothing in the result holds the building down: the fasteners between the floor frame and the runners, and any tie-down against wind uplift or sliding, are separate from how many skids lie underneath, and a shed on skids rests on the ground rather than being fixed into it.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-05 · in the site-wide review of 2026-09-06 · v1.0.1
Regulatory standards & verification citations1
- Skid count = (shed width / skid spacing) + 1; each skid runs the full length of the shed, spaced at a standard 2 ft interval across the width