Labor Cost Calculator

Estimate total labor cost from hours, hourly rate, and crew size.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
The total hours the job is expected to take, per worker.

Get this from a contractor's quote or your own experience with similar jobs.

The rate charged (or paid) per worker, per hour.

Rates vary widely by trade, licensing, and region — get a local quote for an accurate figure.

The number of workers billed at this hourly rate.

If different crew members bill at different rates, run this calculator once per rate and add the totals.

Total crew-hours

40 hours

Medium confidence

Figures that depend on a rate wait for yours — this page does not assume one.

Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Total labor cost = estimated hours x hourly rate x crew size

Inputs used

Estimated Hours
40
Hourly Rate
Crew Size
1
Final result40 hours

What this calculation does not cover

  • One rate is multiplied across every hour and every worker, so there is no tier for overtime or holiday premiums, night and weekend differentials, or a crew that pairs a licensed lead with an apprentice — a mixed-rate job has to be totalled in separate runs and added by hand.
  • Crew size acts as a straight multiplier on the hours you entered, which assumes each additional worker stays productive for the full duration: the tasks that will not split across two pairs of hands, the time a crew loses coordinating, and the helper who is only on site for part of the week all leave the total untouched.
  • Nothing distinguishes a wage you pay from a rate you are charged, because the same multiplication runs on either. A figure built from raw wages carries no payroll taxes, workers' compensation, insurance or benefits on top of it, while a contractor's quoted rate may already have overhead and profit buried inside — the answer looks identical in both cases.
  • Only worked hours are priced. Travel and mobilization, setup and clean-up, tool or equipment hire, disposal, permits and materials all sit outside the figure, and no minimum charge is imposed either — an entry of half an hour returns half an hour of money on a job many trades would bill as a minimum visit.
  • The hours you type are taken exactly as they stand, with no contingency for rework, weather, waiting on an inspection or scope that grows once the walls are open, and the rate is held flat for the whole span — a long program approaching the 2,000-hour entry ceiling is still priced at today's number, with no escalation partway through.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-05 · in the site-wide review of 2026-09-06 · v1.0.1

Regulatory standards & verification citations1
  1. Total labor cost = estimated hours x hourly rate x crew size
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

  • Application nine went in five weeks ago and nothing has come back. Whether a valid pay less notice ever existed, and what falls due if it did not.

  • Building Up a Unit Rateuses this calculator

    A rate is a quotient, and the quantity underneath it was measured by somebody else to rules you have not read. Everything else is the easy half.

  • A fortnight lost to weather and a late instruction. Which of them buys time, which also buys money, and the notice that has to go before either does.

How to calculate labor cost in 4 steps

  1. Estimated HoursThe total hours the job is expected to take, per worker.
  2. Hourly RateThe rate charged (or paid) per worker, per hour.
  3. Crew SizeThe number of workers billed at this hourly rate.
  4. Estimated labor costThe tool computes the estimated labor cost from those figures and shows the formula, its sources, and a confidence rating alongside it.

Frequently asked questions

Does this include materials cost?
No — this is labor only. Use the Renovation Budget Calculator or Cost Per Square Foot Calculator alongside this one to build a fuller project estimate, or add material line items in the Project Builder.
Should I use my own hours or the total crew-hours?
Enter the hours the job takes per worker (i.e. the job's duration), not the total crew-hours — this calculator multiplies by crew size for you.
How do I account for overtime rates?
Run this calculator twice — once for regular hours at the standard rate, once for overtime hours at the overtime rate — and add the two totals together.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.