SettingsSettings for this calculationUS
The total hours the job is expected to take, per worker.
Get this from a contractor's quote or your own experience with similar jobs.
The rate charged (or paid) per worker, per hour.
Rates vary widely by trade, licensing, and region — get a local quote for an accurate figure.
The number of workers billed at this hourly rate.
If different crew members bill at different rates, run this calculator once per rate and add the totals.
Total crew-hours
40 hours
Figures that depend on a rate wait for yours — this page does not assume one.
They open the calculator with your figures already in it
Labor Cost Calculator: 40 hours — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Total labor cost = estimated hours x hourly rate x crew size
Inputs used
- Estimated Hours
- 40
- Hourly Rate
- Crew Size
- 1
What this calculation does not cover
- One rate is multiplied across every hour and every worker, so there is no tier for overtime or holiday premiums, night and weekend differentials, or a crew that pairs a licensed lead with an apprentice — a mixed-rate job has to be totalled in separate runs and added by hand.
- Crew size acts as a straight multiplier on the hours you entered, which assumes each additional worker stays productive for the full duration: the tasks that will not split across two pairs of hands, the time a crew loses coordinating, and the helper who is only on site for part of the week all leave the total untouched.
- Nothing distinguishes a wage you pay from a rate you are charged, because the same multiplication runs on either. A figure built from raw wages carries no payroll taxes, workers' compensation, insurance or benefits on top of it, while a contractor's quoted rate may already have overhead and profit buried inside — the answer looks identical in both cases.
- Only worked hours are priced. Travel and mobilization, setup and clean-up, tool or equipment hire, disposal, permits and materials all sit outside the figure, and no minimum charge is imposed either — an entry of half an hour returns half an hour of money on a job many trades would bill as a minimum visit.
- The hours you type are taken exactly as they stand, with no contingency for rework, weather, waiting on an inspection or scope that grows once the walls are open, and the rate is held flat for the whole span — a long program approaching the 2,000-hour entry ceiling is still priced at today's number, with no escalation partway through.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-05 · in the site-wide review of 2026-09-06 · v1.0.1
Regulatory standards & verification citations1
- Total labor cost = estimated hours x hourly rate x crew size
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.