Build a deck budget from its actual parts — surface, railing, footings and stairs — rather than one rate per square metre.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
Plan area of the deck surface.

The area you walk on, in plan, measured to the outside of the deck boards. Not the area of ground underneath, which on a sloping site is larger, and not the board area including waste — the rate below is per square metre of finished deck and the waste belongs inside that rate. An L-shaped deck is two rectangles; measuring the bounding box adds a corner nobody is building.

Your rate for boards, joists and fixing.

Take it from a quote, a supplier, or a comparable job you have priced. Composite decking typically runs two to three times the material cost of treated softwood, and the substructure is the same either way.

Total length of railing.

Only the open edges. A deck against two walls needs railing on two sides, not four — and railing is often the most expensive length on the whole job.

Your rate per linear metre.

Your own supplied-and-fitted rate for the railing you are actually using, per metre run. Railing is the widest-ranging line on a deck: a simple timber balustrade and a glass-and-post system differ several-fold, and the fixings and posts are usually where the difference lives rather than the infill. Measure the railing length separately from the deck perimeter — a deck against a wall does not railing that side.

Post footings below the deck.

How many footings the frame needs, which comes from the joist and beam layout rather than from the deck's size — a deck with a longer beam span needs fewer, deeper footings, not more shallow ones. Count the ledger side too if the deck is freestanding. This is the line most often under-counted on a sloping site, where the low end needs taller posts and often larger pads.

Excavation, concrete and post base.

Everything one footing costs in the ground: digging it, the concrete, the post base or anchor, and the labour to set it. Include the spoil — a footing produces more spoil than it takes concrete, and on a site with no access for a barrow that removal is a real cost. Frost depth decides the volume in cold climates and can double this rate against a mild-climate figure.

Number of steps down to ground.

Count the RISERS, not the treads — a flight from deck to ground has one more riser than it has treads, and pricing by treads undercounts every flight by one. The number comes from the total drop divided by the riser height you can use, rounded so every riser is equal: unequal risers at the bottom of a flight are the commonest cause of a trip, and most codes limit how much they may vary.

Stringer, tread and fixing per step.

One riser's share of the whole flight: stringer, tread, riser board if you are using one, and the fixings. Wide flights need more stringers, so a 1.5 m wide stair is not twice a 750 mm one in stringers alone. Handrails and the landing at the bottom are not in this rate and are frequently the difference between the estimate and the invoice.

Allowance for what you have not found yet.

Ten percent on a straightforward deck on level ground. Fifteen or more where the ground slopes, drains are in the way, or the substructure is unknown until you dig.

Total deck cost

Needs your rates

This page does not assume a price. Enter yours and the answer appears here.

Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Element-based estimating. Rates are user-supplied; no market data is embedded.
  • Railing and stairs are priced per linear metre and per riser because their cost does not scale with deck area

Inputs used

Deck area
320 sq ft
Surface rate (per m², materials + labour)
Railing length
66 ft
Railing rate (per m)
Number of footings
12
Rate per footing
Stair risers
4
Rate per riser
Contingency (%)
10
Final resultNaN

What this calculation does not cover

  • Excludes permits, site access, demolition of an existing deck, and any electrical or lighting work.
  • A deck over about 750 mm (30 in) above ground usually requires guarding to a specified height and may need structural sign-off; that is a code question, not a cost one.
66 ft
Schematic, drawn to the proportions you entered — not to scale on screen.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-08-27 · in the site-wide review of 2026-09-06 · v1.0.0

Regulatory standards & verification citations2
  1. Element-based estimating. Rates are user-supplied; no market data is embedded.
  2. Railing and stairs are priced per linear metre and per riser because their cost does not scale with deck area
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

How to calculate deck cost in 10 steps

  1. Deck areaPlan area of the deck surface.
  2. Surface rate (per m², materials + labour)Your rate for boards, joists and fixing.
  3. Railing lengthTotal length of railing.
  4. Railing rate (per m)Your rate per linear metre.
  5. Number of footingsPost footings below the deck.
  6. Rate per footingExcavation, concrete and post base.
  7. Stair risersNumber of steps down to ground.
  8. Rate per riserStringer, tread and fixing per step.
  9. Contingency (%)Allowance for what you have not found yet.
  10. Total deck costThe tool computes the total deck cost from those figures and shows the formula, its sources, and a confidence rating alongside it.

Frequently asked questions

Why not just use a cost per square metre?
Because two of the four biggest costs on a deck do not scale with area. Railing is priced per linear metre and a long thin deck has far more of it than a square one of the same area. Stairs are priced per riser and depend on how high the deck sits. A per-square-metre figure taken from someone else's deck silently imports their railing ratio and their ground level.
Which part usually costs the most?
Railing surprises people most often — on a small deck with open sides it can approach the cost of the surface itself. The breakdown shows railing as a percentage of the total for exactly this reason: if it is over about a third, the deck shape is driving the budget and a different plan may cost materially less for the same usable area.
Is composite worth the extra?
That is a maintenance-cost question over the deck's life, not a build-cost one. Composite boards cost substantially more up front and the substructure underneath is identical. Price both surface rates here and then weigh the difference against the staining and board replacement a timber deck needs over fifteen years.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.