Insulation & Efficiency

R-Value Calculator

Add up the R-values of layered materials in a wall, floor, or ceiling assembly to get the total insulating value.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
The R-value of your main insulation layer, printed on the product.

This is usually your batt, blown-in, or rigid foam insulation — the biggest contributor to total R-value.

The R-value of a second layer, like exterior sheathing.

Set to 0 if this layer doesn't apply to your assembly.

The R-value of interior finish material, like drywall (typically about R-0.45 for 1/2 in).

Set to 0 if this layer doesn't apply to your assembly.

Total assembly R-value

15.8 R-value

High confidence
Sum of material layers
14.95 R
Air film allowance
0.85 R
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Thermal resistances (R-values) in a layered assembly add directly: total R = sum of each layer's R-value
  • A combined interior + exterior air film allowance of approximately R-0.85 is commonly included in total assembly R-value calculations

Inputs used

Layer 1 R-Value (e.g. batt insulation)
13
Layer 2 R-Value (e.g. sheathing)
1.5
Layer 3 R-Value (e.g. drywall)
0.45

Intermediate steps

Sum of material layers
14.95 R
Air film allowance
0.85 R
Final result15.8 R-value

What this calculation does not cover

  • Layers are summed straight through the insulated cavity. Studs, joists, plates, headers and rim areas conduct several times faster than the insulation between them and are not deducted here, so the real whole-wall or whole-ceiling figure is lower than this total. Run the Thermal Bridging Effective R-Value Calculator on the same wall to see by how much.
  • The figures are imperial R-values in hr·ft²·°F/BTU, and so is the fixed R-0.85 air film allowance. Metric RSI values in m²K/W are about 5.68 times smaller, so entering those makes the film allowance alone roughly six times too generous. Convert before you type.
  • The air film allowance is one fixed number written for a wall: still indoor air with sideways heat flow, and an outside face exposed to wind. It does not change for heat flowing up or down, for a surface facing a vented attic or an enclosed crawl space, or for a reflective low-emissivity face, all of which shift the film values.
  • Product R-values are lab ratings for material at full thickness with no gaps. Batts compressed under wiring, voids at plates and corners, and loose fill that has settled all deliver less than the printed number, and nothing here downgrades the total for installation quality.
  • R-value covers conduction only. It says nothing about air leakage, wind washing through the insulation, or moisture in the assembly, and this total is not a code compliance check: the required figure depends on climate zone and on which element you are building, and codes are frequently verified against a whole-assembly U-factor that includes the framing this sum leaves out.

Add the equipment this sizes

This result is a specification — 15.8 R-value — not a quantity. Put the thing it sizes into your project: how many, what you call it, and your supplier’s price.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-02 · in the site-wide review of 2026-09-06 · v1.0.1

Regulatory standards & verification citations2
  1. Thermal resistances (R-values) in a layered assembly add directly: total R = sum of each layer's R-value
  2. A combined interior + exterior air film allowance of approximately R-0.85 is commonly included in total assembly R-value calculations
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

Still deciding? More Insulation vs Fixing Thermal Bridges — the factors that actually differ, with no invented prices.

How to calculate R-value in 4 steps

  1. Layer 1 R-Value (e.g. batt insulation)The R-value of your main insulation layer, printed on the product.
  2. Layer 2 R-Value (e.g. sheathing)The R-value of a second layer, like exterior sheathing.
  3. Layer 3 R-Value (e.g. drywall)The R-value of interior finish material, like drywall (typically about R-0.45 for 1/2 in).
  4. Total assembly R-valueThe tool computes the total assembly R-value from those figures and shows the formula, its sources, and a confidence rating alongside it.

Total assembly R-value by layer 1 R-value (e.g. batt insulation)

Page defaults, not your figures above.

Layer 1 R-Value (e.g. batt insulation)Total assembly R-value (R-value)
24.8
57.8
1012.8
2022.8
5052.8

Frequently asked questions

What R-value do I need for my climate?
It varies by climate zone and which part of the house (attic, wall, floor) — check your local building code or the U.S. Department of Energy's climate zone R-value recommendations for a specific target.
Does an air gap have an R-value?
A still air gap does add some resistance, but it's small and inconsistent (affected by air movement) — this calculator doesn't include a separate air-gap layer; add it to a material layer's value if you want to account for it roughly.
Why do R-values simply add together?
Thermal resistance in materials stacked in the direction of heat flow behaves like electrical resistors in series — the resistances (R-values) sum directly, unlike some other physical properties.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.