SettingsSettings for this calculationUS
The undisturbed, in-situ soil volume.
This is the volume measured before any excavation disturbs the soil.
How much the soil expands once excavated and loosened, as a positive percentage.
Common earth swells roughly 20-30%; rock can swell 40-70% or more.
How much smaller the soil ends up once recompacted, as a negative percentage.
Common earth typically shrinks 10-15% when recompacted relative to its original bank volume.
Loose (haul) volume
163 yd³
Swell and shrinkage factors vary significantly by soil type and moisture content — use site-specific values from a geotechnical report or local hauling experience where available, rather than generic averages.
- Bank (in-situ) volume
- 130.75 yd³
- Compacted (recompacted) volume
- 117.68 yd³
They open the calculator with your figures already in it
Soil Swell & Shrinkage Haul Volume Calculator: 163 yd³ — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Standard earthwork volume states: loose (haul) volume = bank volume x (1 + swell%); compacted volume = bank volume x (1 + shrinkage%), where shrinkage is typically expressed as a negative percentage
Inputs used
- Bank (In-Situ) Volume
- 130.75 yd³
- Swell Factor (%)
- 25
- Shrinkage Factor (%)
- -10
Intermediate steps
- Bank (in-situ) volume
- 130.75 yd³
- Compacted (recompacted) volume
- 117.68 yd³
Confidence note: Swell and shrinkage factors vary significantly by soil type and moisture content — use site-specific values from a geotechnical report or local hauling experience where available, rather than generic averages.
What this calculation does not cover
- The swell and shrinkage percentages are figures you supply, not properties this page derives. Moisture content, fines content, how the material is dug and the compactive effort actually applied all move the real factors, and the same soil at a different moisture will not behave like the number you typed. Take the factors from the site investigation or measured local experience, not from a general table.
- This is a volume conversion, not a haulage calculation. It does not size trucks, count loads, or apply payload limits — wet or dense spoil often reaches a lorry's weight limit before it fills the body, and heap, tailgate profile and further bulking during loading all sit between this loose figure and a load count.
- The compacted figure is not a compaction specification. It assumes the placed fill achieves exactly the shrinkage percentage entered, and says nothing about the density the fill must be tested to, layer thickness, the plant used, or material rejected and reworked. It does not replace field density testing.
- One bank volume with one pair of factors. A mixed excavation — topsoil over clay over rock, or a trench through made ground — has different swell and shrinkage per stratum, and running the whole quantity at a single figure misstates both the haul and the fill. Topsoil stripping and unsuitable or contaminated material that leaves site instead of returning to fill are outside the model entirely.
- The loose volume describes material immediately after excavation. A stockpile consolidates under its own weight and with rain, so a survey of a pile that has stood for weeks comes back below this figure. Nothing here addresses waste classification, tipping, or duty-of-care disposal requirements for spoil going off site.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-06 · in the site-wide review of 2026-09-06 · v1.0.1
Regulatory standards & verification citations1
- Standard earthwork volume states: loose (haul) volume = bank volume x (1 + swell%); compacted volume = bank volume x (1 + shrinkage%), where shrinkage is typically expressed as a negative percentage
Cite this page