What it is called, by market
One concept, four markets. Where a name means something else locally, the card says so rather than leaving you to find out on site.
United Kingdom
Same word, different thingbulking
also bulking factor, bulkage, loose volume, bank volume, compacted volume
BULKING of SAND is a different phenomenon with the same word — damp sand expanding because of surface moisture, which matters when batching concrete by volume rather than when digging.
Australia
Close, not identicalbulking
also swell, bulking factor, loose cubic metres, compacted cubic metres
Both terms in use, with quantities commonly qualified as LOOSE or COMPACTED cubic metres so the state is stated rather than assumed.
United Statesyours
Same word, different thingswell
also swell factor, bank cubic yards, BCY, loose cubic yards, LCY, compacted cubic yards, CCY, shrinkage
Three separate units — BANK, LOOSE and COMPACTED cubic yards — and a quantity without one of those three letters is ambiguous. SHRINKAGE names the compaction factor, not a loss of material.
Canada
Close, not identicalswell
also bank cubic metres, loose cubic metres, shrinkage factor, compaction factor
As the United States with metric units, so BCM and LCM replace BCY and LCY and the same three-state distinction applies.
The governing standard, by market
United Kingdom
CIRIA C750 / BS 6031
Groundwater control and earthworks guidance including volume change on excavation, and the code of practice for earthworks covering fill and compaction.
United States
AASHTO T 180 / Caterpillar Performance Handbook
Moisture-density relations of soils used to define compacted density, and the industry reference tables for swell and shrinkage by material type.
Calculators for this
Each works in either measurement system, and the terminology on the page follows whichever market you have selected.
Frequently asked questions
- Why is there more spoil than hole?
- Because undisturbed ground is a settled structure and a heap is not. In the bank, particles have been packed by centuries of overburden and water into an arrangement with comparatively few voids. Digging breaks that arrangement apart: the same solids are now loosely piled with air between them, so the volume goes up — modestly for sand, which was already loose, and substantially for stiff clay or rock, which was tightly bound and breaks into lumps that cannot repack themselves. Typical figures run from a small percentage for sand up to half as much again for clay and more for blasted rock. The consequence for a job is entirely practical: excavation is measured in the BANK, because that is the hole being dug, but everything that leaves site — lorry loads, skip counts, tip charges — is measured LOOSE. Ordering disposal from the excavation quantity under-orders it by the bulking factor every time.
- If it bulks when dug, why does backfill run short?
- Because two different changes happen in sequence and only the first is an expansion. Digging loosens the material, and compacting it puts it back into a dense arrangement — but the machine and the layer thickness do a better job than the original geology did in some soils and a worse one in others, so the compacted volume can be less than the bank volume it came from. That second change is what American usage calls SHRINKAGE, and it is measured from bank to compacted while swell is measured from bank to loose. Nothing has been lost: the same solids occupy less space because there is less air between them. This is the arithmetic behind the routine surprise on a cut-and-fill exercise, where a balanced cut and fill on the drawing needs imported material on site. Anyone reconciling earthworks has to carry three volumes rather than one, and to say which of the three any figure is.
- Is bulking of sand the same thing?
- No, and the shared word causes real errors in concrete. BULKING OF SAND is a surface-tension effect: a film of moisture on damp sand grains holds them apart, and sand at a few percent moisture can occupy a quarter more volume than the same dry sand — with the expansion peaking at a moderate moisture content and collapsing again once the sand is saturated, because water then fills the voids instead of separating the grains. It has nothing to do with excavation and everything to do with batching. Measuring aggregate by VOLUME from a damp stockpile therefore puts materially less sand into a mix than the proportion intended, which weakens it, and the effect is largest exactly where site sand is normally kept: damp, uncovered, part-used. It is the main reason concrete specifications are written by mass rather than by volume, and why a site-batched mix from a shovel count is not the mix on the drawing.