Example house

A small mountain cabin with a steep roof: every material listed

One room and a loft's worth of roof, built to shed snow and keep the wind out.
  • One storeyLevels
  • 30Rows to buy
  • Openings deductedWall by wall

Building where the road closes in winter

A cabin above the snow line is built in the short season between thaw and the first storm, often with every material trucked up in one or two loads. That is the reason to count everything first: a forgotten box of fasteners is a day's drive. This one is a single room with a bathroom partition, one outside door and five modest windows facing the view.

Frost runs deep at altitude, so the trench goes to 1.5 m (about 5 ft) here; your building official will name the depth for the site, and the backfill row follows it.

Foam in a 2×6 frame

Closed-cell spray foam fills the full 5 1/2 in (140 mm) cavity of 2×6 studs. It insulates, seals against the wind that finds every gap in a timber cabin, and slows vapour by itself, so the page will not add a polyethylene sheet over it: two vapour-closed layers can trap water between them. The foam row is an area at the cavity depth; get the yield from your installer.

Board-and-batten siding suits the setting and is counted across the whole outside face: boards around a door or window are cut from full-height boards, so the count does not deduct the openings, and the row says so.

A 12 in 12 roof

A 45° roof sheds a heavy snow load instead of holding it, and its slope factor of about 1.41 means the shingles cover far more than the plan. Generous 600 mm (2 ft) overhangs on every side protect the siding from drip and drift. The ice-dam strip runs up both eaves, which on a roof this steep is a narrow band of the slope.

Before the truck goes up

The slab is 125 mm (5 in) here rather than the usual 100: thicken it only on an engineer's word, because a slab under a snow-loaded roof is a structural question this page does not answer. And count a few spare sheets of plywood for the loft deck, which no row here includes.

Ask, too, how the materials get up the last stretch of track. A full pallet of shingles can weigh more than a light pickup should carry on a washboard road, and foam is sprayed by a rig that needs power and a dry day; book the sprayer before the windows go in, so the cavities are open and warm enough to take it.

Plan of a one-storey house 26 ft by 19.5 ft outside, with 5 windows and 3 doors in all. Ground floor.26 ft7.93 m19.5 ft5.94 m
Ground floor, to scale.
Plan of a one-storey house 8 m by 6 m outside, with 5 windows and 3 doors in all. Ground floor.26.25 ft8 m19.69 ft6 m
Ground floor, to scale.

Everything to buy

Quantities to order, with each calculator’s own waste. Your own rates go on the lines in My Project.

Foundation and floor
Material, and whereQuantity
Continuous Footing / Grade Beam VolumeFT-1, Ground floor5.07 yd³
Trench Excavation & Backfill VolumeFT-1, Ground floor15.26 yd³
RebarFT-1, Ground floor11 x 20 ft sticks
ConcreteSL-1, Ground floor8.61 yd³
RebarSL-1, Ground floor42 x 20 ft sticks
Concrete FormworkSL-1, Ground floor13 x 8 ft boards
Walls
Material, and whereQuantity
Studs, 2×6 (38 × 140 mm) at 16 in (400 mm) centresEW-1, Ground floor, 4 walls98 studs
Plates, headers, sills, cripples, corner and junction studsEW-1, Ground floor, 4 walls372.65 ft
Closed-cell spray foam, full 2×6 cavity (5 1/2 in, 140 mm)EW-1, Ground floor, 4 walls6 x 600 bd-ft kits
Wall sheathing, plywood 1/2 in (12 mm)EW-1, Ground floor, 4 walls23 sheets (4x8 ft)
House WrapEW-1, Ground floor, 4 walls1 roll
Timber boards and battensEW-1, Ground floor, 4 walls110 boards
Framing StudIW-1, Ground floor24 studs
Outlet SpacingIW-1, Ground floor2 outlets (minimum)
Drywall Joint CompoundIW-1, Ground floor1 x 4.5 gal box
Doors and windows
Material, and whereQuantity
Flashing tape round the opening, for a timber-framed wallDR-1, Ground floor28.6 ft
Architrave (casing) inside, two legs and a headDR-1, Ground floor18.7 linear ft
Mastic (caulk) round the frame, outside and insideDR-1, Ground floor2 tubes
Paint for the door and frame, both faces: undercoat and glossDR-1, Ground floor0.2635 gal
Window Opening Flashing MembraneWN-1, Ground floor, 5 openings111.81 ft
Door & Window CasingWN-1, Ground floor, 5 openings76.98 linear ft
Interior doors, 800 × 2000 mm (31 1/2 × 78 3/4 in)counted on the drawing2 each
Outside doors, 914 × 2134 mm (36 × 84 in)counted on the drawing1 each
Windows, 914 × 1219 mm (36 × 48 in)counted on the drawing5 each
Roof
Material, and whereQuantity
Roofing ShingleRF-1, Ground floor10.97 squares
Roofing UnderlaymentRF-1, Ground floor1 roll
Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining)RF-1, Ground floor381.88 sq ft
Roof Ridge CapRF-1, Ground floor2 bundles
Ridge Vent Linear FootageRF-1, Ground floor31.5 ft
Roof trussesRF-1, Ground floor15 trusses
Foundation and floor
Material, and whereQuantity
Continuous Footing / Grade Beam VolumeFT-1, Ground floor4.31 m³
Trench Excavation & Backfill VolumeFT-1, Ground floor13.15 m³ (loose)
RebarFT-1, Ground floor9 x 12 m sticks
ConcreteSL-1, Ground floor6.6 m³
RebarSL-1, Ground floor22 x 12 m sticks
Concrete FormworkSL-1, Ground floor13 x 2.4 m boards
Walls
Material, and whereQuantity
Studs, 2×6 (38 × 140 mm) at 16 in (400 mm) centresEW-1, Ground floor, 4 walls98 studs
Plates, headers, sills, cripples, corner and junction studsEW-1, Ground floor, 4 walls114.61 m
Closed-cell spray foam, full 2×6 cavity (5 1/2 in, 140 mm)EW-1, Ground floor, 4 walls8.03 m³
Wall sheathing, plywood 1/2 in (12 mm)EW-1, Ground floor, 4 walls23 sheets (2440x1220 mm)
House WrapEW-1, Ground floor, 4 walls1 roll
Timber boards and battensEW-1, Ground floor, 4 walls111 boards
Framing StudIW-1, Ground floor24 studs
Outlet SpacingIW-1, Ground floor2 outlets (minimum)
Drywall Joint CompoundIW-1, Ground floor14.18 kg
Doors and windows
Material, and whereQuantity
Flashing tape round the opening, for a timber-framed wallDR-1, Ground floor8.62 m
Architrave (casing) inside, two legs and a headDR-1, Ground floor5.63 m
Mastic (caulk) round the frame, outside and insideDR-1, Ground floor2 tubes
Paint for the door and frame, both faces: undercoat and glossDR-1, Ground floor0.9641 L
Window Opening Flashing MembraneWN-1, Ground floor, 5 openings33.55 m
Door & Window CasingWN-1, Ground floor, 5 openings23.1 m
Interior doors, 800 × 2000 mm (31 1/2 × 78 3/4 in)counted on the drawing2 each
Outside doors, 920 × 2100 mm (36 1/4 × 82 3/4 in)counted on the drawing1 each
Windows, 900 × 1200 mm (35 1/2 × 47 1/4 in)counted on the drawing5 each
Roof
Material, and whereQuantity
Roofing ShingleRF-1, Ground floor103.05 m²
Roofing UnderlaymentRF-1, Ground floor1 roll
Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining)RF-1, Ground floor35.43 m²
Roof Ridge CapRF-1, Ground floor2 bundles
Ridge Vent Linear FootageRF-1, Ground floor9.66 m
Roof trussesRF-1, Ground floor15 trusses

What changes if

With mineral wool batts instead of foam

  • Closed-cell spray foam, full 2×6 cavity (5 1/2 in, 140 mm): 6 x 600 bd-ft kits → none
  • Mineral wool batts, 5 1/2 in (140 mm), for 2×6 cavities: none → 13 packages

With vinyl siding instead of board and batten

  • Timber boards and battens: 110 boards → none
  • Vinyl siding: none → 7.12 squares

With mineral wool batts instead of foam

  • Closed-cell spray foam, full 2×6 cavity (5 1/2 in, 140 mm): 8.03 m³ → none
  • Mineral wool batts, 5 1/2 in (140 mm), for 2×6 cavities: none → 14 packages

With vinyl siding instead of board and batten

  • Timber boards and battens: 111 boards → none
  • Vinyl siding: none → 67.09 m²

This page counts materials and does not check strength. Every figure nobody typed is listed on the House Estimator, where this house can be changed.