Example house

A one-storey ranch for a cold winter, every material counted

Long, low and simple to frame: the plan most first houses on a rural lot still start from.
  • One storeyLevels
  • 30Rows to buy
  • Openings deductedWall by wall

The site and the winter

Picture a lot at the edge of a town on the northern plains, where January nights sit well below freezing for weeks and snow lies on the roof from December to March. The house is a single storey, long side to the road, with a gable roof whose ridge runs the length of the plan, so the two long eaves shed snow front and back rather than onto the doors.

Frost decides the foundation before anything else does. The trench here is taken to 1.2 m (4 ft), the depth a cold northern county commonly asks a footing to reach; your building department names the real figure, and the footing and backfill rows follow whatever depth you type.

Why these walls

Two-by-four studs at 16 inch centres are the wall most framers can put up from memory, and on one storey they carry a light roof without any special detailing. Fibreglass batts fill the 3 1/2 in (89 mm) cavity; OSB sheathing braces the frame and takes the house wrap; vinyl siding goes over the wrap because it needs no paint and forgives a frame that is not perfectly flat.

The list leaves the vapour retarder off because this page cannot know your code: in most of the cold north one is expected on the warm side of the batts, and choosing the polyethylene membrane adds its row at the inside face area with the openings taken off.

The roof over it

A 6 in 12 pitch is steep enough for shingles to shed meltwater and shallow enough to walk. The ice-dam membrane runs along both eaves, from the drip edge to 24 in (610 mm) inside the warm wall, and the underlayment starts where it stops, so nothing is bought twice. The eaves overhang 450 mm (about 18 in), which keeps the siding dry and adds plan area the shingle row counts.

Before you order

Check the stud count against your framing plan: this page counts the studs along each wall and the extra ones each opening takes, not the plates, headers or corner blocking. Walk the window schedule too. Nine windows of 1.2 m (4 ft) square are spaced evenly here; real bedrooms need egress sizes your code sets, and a larger window takes more casing, flashing and less siding.

Plan of a one-storey house 46 ft by 28 ft outside, with 9 windows and 8 doors in all. Ground floor.46 ft14.02 m28 ft8.53 m
Ground floor, to scale.
Plan of a one-storey house 14 m by 8.5 m outside, with 9 windows and 8 doors in all. Ground floor.45.93 ft14 m27.89 ft8.5 m
Ground floor, to scale.

Everything to buy

Quantities to order, with each calculator’s own waste. Your own rates go on the lines in My Project.

Foundation and floor
Material, and whereQuantity
Continuous Footing / Grade Beam VolumeFT-1, Ground floor11.16 yd³
Trench Excavation & Backfill VolumeFT-1, Ground floor31.59 yd³
RebarFT-1, Ground floor29 x 20 ft sticks
ConcreteSL-1, Ground floor17.56 yd³
RebarSL-1, Ground floor101 x 20 ft sticks
Concrete FormworkSL-1, Ground floor21 x 8 ft boards
Walls
Material, and whereQuantity
Studs, 2×4 (38 × 89 mm) at 16 in (400 mm) centresEW-1, Ground floor, 4 walls160 studs
Plates, headers, sills, cripples, corner and junction studsEW-1, Ground floor, 4 walls677.5 ft
Fibreglass batts, 3 1/2 in (89 mm), for 2×4 cavitiesEW-1, Ground floor, 4 walls11 packages
Wall sheathing, OSB 7/16 in (11 mm)EW-1, Ground floor, 4 walls35 sheets (4x8 ft)
House WrapEW-1, Ground floor, 4 walls1 roll
Vinyl sidingEW-1, Ground floor, 4 walls10.98 squares
Framing StudIW-1, Ground floor, 3 walls90 studs
Outlet SpacingIW-1, Ground floor, 3 walls9 outlets (minimum)
Drywall Joint CompoundIW-1, Ground floor, 3 walls3 x 4.5 gal boxes
Doors and windows
Material, and whereQuantity
Flashing tape round the opening, for a timber-framed wallDR-1, Ground floor, 2 openings57.2 ft
Architrave (casing) inside, two legs and a headDR-1, Ground floor, 2 openings37.4 linear ft
Mastic (caulk) round the frame, outside and insideDR-1, Ground floor, 2 openings4 tubes
Paint for the door and frame, both faces: undercoat and glossDR-1, Ground floor, 2 openings0.5269 gal
Window Opening Flashing MembraneWN-1, Ground floor, 9 openings221.07 ft
Door & Window CasingWN-1, Ground floor, 9 openings158.37 linear ft
Interior doors, 800 × 2000 mm (31 1/2 × 78 3/4 in)counted on the drawing6 each
Outside doors, 914 × 2134 mm (36 × 84 in)counted on the drawing2 each
Windows, 1219 × 1219 mm (48 × 48 in)counted on the drawing9 each
Roof
Material, and whereQuantity
Roofing ShingleRF-1, Ground floor18.28 squares
Roofing UnderlaymentRF-1, Ground floor2 rolls
Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining)RF-1, Ground floor410.43 sq ft
Roof Ridge CapRF-1, Ground floor2 bundles
Ridge Vent Linear FootageRF-1, Ground floor50.35 ft
Roof trussesRF-1, Ground floor25 trusses
Foundation and floor
Material, and whereQuantity
Continuous Footing / Grade Beam VolumeFT-1, Ground floor8.43 m³
Trench Excavation & Backfill VolumeFT-1, Ground floor23.08 m³ (loose)
RebarFT-1, Ground floor15 x 12 m sticks
ConcreteSL-1, Ground floor13.09 m³
RebarSL-1, Ground floor51 x 12 m sticks
Concrete FormworkSL-1, Ground floor21 x 2.4 m boards
Walls
Material, and whereQuantity
Studs, 2×4 (38 × 89 mm) at 16 in (400 mm) centresEW-1, Ground floor, 4 walls160 studs
Plates, headers, sills, cripples, corner and junction studsEW-1, Ground floor, 4 walls206.77 m
Fibreglass batts, 3 1/2 in (89 mm), for 2×4 cavitiesEW-1, Ground floor, 4 walls11 packages
Wall sheathing, OSB 7/16 in (11 mm)EW-1, Ground floor, 4 walls35 sheets (2440x1220 mm)
House WrapEW-1, Ground floor, 4 walls1 roll
Vinyl sidingEW-1, Ground floor, 4 walls102.27 m²
Framing StudIW-1, Ground floor, 3 walls90 studs
Outlet SpacingIW-1, Ground floor, 3 walls9 outlets (minimum)
Drywall Joint CompoundIW-1, Ground floor, 3 walls67.81 kg
Doors and windows
Material, and whereQuantity
Flashing tape round the opening, for a timber-framed wallDR-1, Ground floor, 2 openings17.25 m
Architrave (casing) inside, two legs and a headDR-1, Ground floor, 2 openings11.26 m
Mastic (caulk) round the frame, outside and insideDR-1, Ground floor, 2 openings4 tubes
Paint for the door and frame, both faces: undercoat and glossDR-1, Ground floor, 2 openings1.93 L
Window Opening Flashing MembraneWN-1, Ground floor, 9 openings66.33 m
Door & Window CasingWN-1, Ground floor, 9 openings47.52 m
Interior doors, 800 × 2000 mm (31 1/2 × 78 3/4 in)counted on the drawing6 each
Outside doors, 920 × 2100 mm (36 1/4 × 82 3/4 in)counted on the drawing2 each
Windows, 1200 × 1200 mm (47 1/4 × 47 1/4 in)counted on the drawing9 each
Roof
Material, and whereQuantity
Roofing ShingleRF-1, Ground floor168.78 m²
Roofing UnderlaymentRF-1, Ground floor2 rolls
Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining)RF-1, Ground floor37.86 m²
Roof Ridge CapRF-1, Ground floor2 bundles
Ridge Vent Linear FootageRF-1, Ground floor15.33 m
Roof trussesRF-1, Ground floor24 trusses

What changes if

With the walls framed in 2×6 at 16 in instead

  • Continuous Footing / Grade Beam Volume: 11.16 yd³ → 11.11 yd³
  • Trench Excavation & Backfill Volume: 31.59 yd³ → 28.3 yd³
  • Studs, 2×4 (38 × 89 mm) at 16 in (400 mm) centres, now Studs, 2×6 (38 × 140 mm) at 16 in (400 mm) centres: 160 studs → 160 studs
  • Plates, headers, sills, cripples, corner and junction studs: 677.5 ft → 675.45 ft
  • Fibreglass batts, 3 1/2 in (89 mm), for 2×4 cavities, now Fibreglass batts, 5 1/2 in (140 mm), for 2×6 cavities: 11 packages → 11 packages
  • Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining): 410.43 sq ft → 428.37 sq ft

With fibre-cement lap siding instead of vinyl

  • Vinyl siding: 10.98 squares → none
  • Fibre-cement lap siding: none → 1,117.6 sq ft

With the walls framed in 2×6 at 16 in instead

  • Continuous Footing / Grade Beam Volume: 8.43 m³ → 8.39 m³
  • Trench Excavation & Backfill Volume: 23.08 m³ (loose) → 20.63 m³ (loose)
  • Studs, 2×4 (38 × 89 mm) at 16 in (400 mm) centres, now Studs, 2×6 (38 × 140 mm) at 16 in (400 mm) centres: 160 studs → 160 studs
  • Plates, headers, sills, cripples, corner and junction studs: 206.77 m → 206.15 m
  • Fibreglass batts, 3 1/2 in (89 mm), for 2×4 cavities, now Fibreglass batts, 5 1/2 in (140 mm), for 2×6 cavities: 11 packages → 11 packages
  • Vinyl siding: 102.27 m² → 102.26 m²
  • Drywall Joint Compound: 67.81 kg → 66.81 kg
  • Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining): 37.86 m² → 39.52 m²

With fibre-cement lap siding instead of vinyl

  • Vinyl siding: 102.27 m² → none
  • Fibre-cement lap siding: none → 104.13 m²

This page counts materials and does not check strength. Every figure nobody typed is listed on the House Estimator, where this house can be changed.