SettingsSettings for this calculationUS
The total length of the foundation perimeter to be insulated.
Measure the full run of slab edge or foundation perimeter where the rigid foam strip will be installed.
The length of a single rigid foam board as sold.
Common rigid foam boards are sold in 8 ft (2.4 m) lengths; check your specific product's dimensions.
Foam boards needed
17 boards
They open the calculator with your figures already in it
Under-Slab Perimeter Rigid Foam Board Calculator: 17 boards — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Board count = ceil(perimeter length ÷ standard board length), since slab-edge insulation is installed as a continuous vertical/under-slab strip around the foundation perimeter rather than covering a full area
Inputs used
- Foundation Perimeter Length
- 130 ft
- Standard board length
- 8 ft
What this calculation does not cover
- The count divides perimeter by board length and nothing else. There is no upstand depth and no board width input, so it assumes one board covers one board length of run at the full depth required: a 2400 x 1200 mm (47 in) sheet ripped into four 300 mm (12 in) slab-edge strips actually covers 9.6 m (31 ft) of run, while a skirt deeper than the board width needs a second course and doubles the figure.
- There is no waste allowance and no corner allowance in this number. It assumes every offcut is carried onto the next run, which a plan with re-entrant corners, steps and door thresholds does not allow; the related area-based foam board calculator adds 10 per cent for exactly this reason.
- Where boards sit under a thickened slab edge they are a load-bearing layer, and this is a piece count that says nothing about compressive strength grade or long-term creep under sustained load. A board specified for a vertical face is not necessarily graded to bear beneath an edge beam.
- Nothing here covers protecting the foam once it is in. Exterior perimeter foam is a concealed route for termites, and jurisdictions differ on whether an inspection gap or termite shield is required and whether exterior below-grade foam is permitted at all; the above-grade portion also needs render or a protection board against UV and impact, which is a separate material line.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Part of a bigger job
Or plan the space itself: measure it once, doors and windows included, and this figure comes back worked out on that space, with what goes with it.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-02 · in the site-wide review of 2026-09-06 · v1.0.1
Regulatory standards & verification citations1
- Board count = ceil(perimeter length ÷ standard board length), since slab-edge insulation is installed as a continuous vertical/under-slab strip around the foundation perimeter rather than covering a full area
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.
Tools and safety for this job
To cut and fit rigid insulation board. Generic types, no brands, no prices.
Protection this work requires
- Mineral and glass wool irritate skin, eyes and airways: cover your arms, wear a P2/N95 respirator while cutting, and rinse in cold water — hot water drives fibres in.
- Knives cause more site injuries than any power tool: cut away from your body, change blades often, and wear cut-resistant gloves to EN 388 level C for repeated cutting.
Show the 4 tools this job needsHide tools
Essential
Tape measure
Utility knife
Recommended
Hand saw
Optional
Caulking gun
Also needed as materials: caulk and sealant cartridges, replacement blades.
what each insulation tool is for, and the spec that decides which to buy where one does.