Materials & Quantities

Skylight Curb Timber Calculator

The four cut pieces of a skylight curb from the rough opening, and how far the chosen board stands above the finished roof once the covering is on.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
Who is doing the work?

The standard allowance most suppliers and estimating guides assume for ordinary work.

The long dimension of the framed hole, measured up the slope.

This is the opening in the deck after the trimmers are in, not the glass size and not the unit's outside frame. The default is 1,400 mm by 780 mm, a size sold worldwide, which is why it reads as a round figure in millimetres and an awkward one in inches — take your own numbers off the unit's instructions rather than off the frame.

The dimension across the slope, between the trimmed rafters.

Measured between the cut rafters or between the trimmers, whichever bounds the hole. It is the pair of pieces cut to this dimension that get shortened by the stock thickness, because they fit between the two long ones rather than running past them.

The actual thickness of the board, not its nominal name.

38 mm covers both common cases: it is the dressed thickness of nominal 2x lumber (1½ in) and of UK CLS. Use the figure a tape gives you on the actual board — the gap between a nominal size and a dressed one is exactly the sort of error that shows up as a curb that will not close on its last corner.

How far the board stands off the deck — this is what sets the curb height.

The curb is boards stood on edge, so the board's WIDTH becomes the curb's height above the deck. 184 mm is nominal 2x8; 140 mm is 2x6 and is where most curbs that turn out too short began. Pick the board first and let this page tell you what height it actually buys, rather than choosing a height and hunting for a board.

Everything between the deck and the weather surface at the curb.

Underlayment plus the covering itself, measured where it dies into the curb rather than at its thinnest point. Asphalt shingles with an ice-and-water membrane under them are about 30 mm; a batten-and-tile roof can be four or five times that, and it is the single figure that turns a curb that looked generous on the deck into one that is nearly buried.

The clearance your unit's instructions call for, measured from the weather surface.

It is asked rather than assumed because the markets differ and so do the coverings. North American instructions commonly call for at least 4 in (100 mm) above the finished roof; 150 mm is the usual upstand in UK and European practice. Both are minimums for an ordinary pitch — a shallow roof, a long run of tile above the skylight, or a site that holds snow all wants more, and the instructions for your unit are what govern.

How many curbs of this size are being built.

Only useful where the openings are identical. A run of different sizes is worth running one at a time, because the cut list is the part you take to the saw and a merged total hides which piece belongs to which hole.

The margin for saw kerfs, a split end and one piece cut the wrong way.

A curb is short pieces cut from long stock, so the real waste is the offcut left when a length will not yield another piece. Ten per cent covers an ordinary job; push it up if the opening dimension divides badly into the stock lengths your merchant actually sells.

Curb stock needed

15.22 ft

High confidence

The cut list is exact arithmetic on the dimensions you entered. The height is only as good as the covering thickness you gave it, which is the figure most often taken at the roof's thinnest point rather than where it meets the curb.

Two long pieces per curb, cut to
55 in
Two short pieces per curb, cut to
28 in
Stock per curb before waste
13.83 ft
Height this board stands above the finished roof
6 in
Clear of the height you asked for by
0 in
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • A curb is built to the rough opening's outside dimensions and stood on the deck, so two pieces run the full opening and two fit between them: stock length per curb = 2 × opening length + 2 × (opening width − 2 × stock thickness)
  • The height that matters is measured from the FINISHED roof surface, not the deck — height above the roof = board depth − the thickness of the covering build-up running up to the curb
  • Curb height is set by the skylight manufacturer's installation instructions and by the covering. North American instructions commonly call for at least 4 in (100 mm) above the finished roof; 150 mm is the usual upstand in UK and European practice, and a low pitch or a snow site wants more than either

Inputs used

Rough Opening Length
55 in
Rough Opening Width
31 in
Curb Stock Thickness
1.5 in
Curb Stock Depth (Board Width, On Edge)
7.25 in
Thickness of the Covering Running Up to the Curb
1.25 in
Height Wanted Above the Finished Roof
6 in
Number of Skylights
1
Waste Allowance (%)
10

Intermediate steps

Two long pieces per curb, cut to
55 in
Two short pieces per curb, cut to
28 in
Stock per curb before waste
13.83 ft
Height this board stands above the finished roof
6 in
Clear of the height you asked for by
0 in
Safety / waste buffer appliedCutting allowance (+10%)
Final result15.22 ft

Confidence note: The cut list is exact arithmetic on the dimensions you entered. The height is only as good as the covering thickness you gave it, which is the figure most often taken at the roof's thinnest point rather than where it meets the curb.

What this calculation does not cover

  • It does not decide whether your skylight needs a curb at all. Deck-mounted units are flashed straight to the roof plane and have no curb; curb-mounted units need one, and which you have is on the unit's own instructions.
  • It does not size the framing around the opening. The trimmers and headers that carry the cut rafters are a structural question and a different page.
  • The height check compares your board against a target YOU enter. It is arithmetic, not approval — the number that governs is in the manufacturer's instructions for your unit and your covering, and a shortfall reported here is a prompt to read them rather than a verdict.

Estimated cost — your price

This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.

4.58 ft2.58 ft1.5 in
Schematic, drawn to the proportions you entered — not to scale on screen.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-20 · v1.0.0

Regulatory standards & verification citations3
  1. A curb is built to the rough opening's outside dimensions and stood on the deck, so two pieces run the full opening and two fit between them: stock length per curb = 2 × opening length + 2 × (opening width − 2 × stock thickness)
  2. The height that matters is measured from the FINISHED roof surface, not the deck — height above the roof = board depth − the thickness of the covering build-up running up to the curb
  3. Curb height is set by the skylight manufacturer's installation instructions and by the covering. North American instructions commonly call for at least 4 in (100 mm) above the finished roof; 150 mm is the usual upstand in UK and European practice, and a low pitch or a snow site wants more than either
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Tools and safety for this job

To cut framing lumber and fit a rooflight or roof window. Generic types, no brands, no prices.

Protection this work requires

  • Hardwood dust is a recognised carcinogen: extract at the tool and wear a P2/N95 respirator when cutting or sanding indoors.
  • Saws, grinders and breakers run above 85 dB, where hearing damage accumulates and does not recover: defenders or plugs for every cut, not just the long ones.
  • Boards, blocks and bagged material cause most lasting back injuries on small sites: two people or a lifter for full sheets, and never a bag on one shoulder up a ladder.
  • Most fatal falls on small jobs are from under three metres: use a tower or a ladder tied at the top, and never work off the top two rungs.
  • Knives cause more site injuries than any power tool: cut away from your body, change blades often, and wear cut-resistant gloves to EN 388 level C for repeated cutting.

Fit a rooflight or roof window: Fitting a rooflight between rafters, or on a kerb on a flat roof, is carpentry and roofing to its maker's instructions. Where a rafter or joist has to be cut to make an opening wider than one bay, the trimming that carries the cut ends is sized by an engineer or from accepted tables, never by this site.

Show the 8 tools this job needs

Essential

  • Circular saw

  • Combination or framing square

  • Cordless drill/driver

  • Hand saw

  • Spirit level

  • Tape measure

Recommended

  • Mitre saw

  • Utility knife

Also needed as materials: circular saw blades, drill and driver bits, mitre saw blades, replacement blades.

what each carpentry tool is for and what each roofing tool is for, and the spec that decides which to buy where one does.

Now that you have the number

These guides cover the work this quantity is for.

How to calculate skylight curb timber in 9 steps

  1. Rough Opening LengthThe long dimension of the framed hole, measured up the slope.
  2. Rough Opening WidthThe dimension across the slope, between the trimmed rafters.
  3. Curb Stock ThicknessThe actual thickness of the board, not its nominal name.
  4. Curb Stock Depth (Board Width, On Edge)How far the board stands off the deck — this is what sets the curb height.
  5. Thickness of the Covering Running Up to the CurbEverything between the deck and the weather surface at the curb.
  6. Height Wanted Above the Finished RoofThe clearance your unit's instructions call for, measured from the weather surface.
  7. Number of SkylightsHow many curbs of this size are being built.
  8. Waste Allowance (%)The margin for saw kerfs, a split end and one piece cut the wrong way.
  9. Curb stock neededThe tool computes the curb stock needed from those figures and shows the formula, its sources, and a confidence rating alongside it.

Curb stock needed by rough opening length

Page defaults, not your figures above.

Rough Opening LengthCurb stock needed (ft)
40 in12.4
60 in16.1
80 in19.7
100 in23.4

Frequently asked questions

Why does the board depth decide the height instead of me entering a height?
Because a curb is boards on edge, and you buy boards in the widths a merchant stocks. Entering a height would let you specify 165 mm and then discover that nothing between 140 and 184 exists. Choosing the board and reading off what height it buys is the order the job actually happens in, and it is why this page reports a shortfall rather than a size.
Does the covering thickness really matter that much?
It is usually the difference between a curb that works and one that does not. A 2x6 curb stands 140 mm off the deck, which is comfortably above a 4 in minimum — until 30 mm of shingle and membrane runs up to it and leaves 110, or until battens and tiles take 90 mm and leave 50. Nothing about the curb changed; the roof grew underneath it.
Should the curb be built to the outside or the inside of the rough opening?
This page assumes outside, which is the common instruction: the curb's outer faces sit flush with the framed hole, so it lands on the trimmers and the deck rather than overhanging the void. If your unit's instructions size the curb to the inside instead, add twice the stock thickness to both opening dimensions before entering them, and the cut list comes out right.
Why is there no fixing or fastener count?
Because how a curb is fixed depends on what it lands on and how the roof is framed, and a count of screws would be the least useful thing on the page. The one thing worth saying is that a curb is squared and fixed before any flashing arrives — a curb racked out of square cannot be corrected once the step flashing is woven into the covering.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.