Sump Pit & Catch Basin Concrete Calculator
Estimate the concrete volume needed to pour an open-top sump pit or catch basin, accounting for the hollow interior.
Computed in your browser — nothing you enter is uploaded. Figures are presented for United States against IRC 2024, and every formula is cited under regulatory standards below.
Last verified 2026-08-26 · v1.0.0
Waste is set to 5% by hand. Pick a tier above to replace it, or keep your own figure.
Concrete volume needed
1.03 yd³
Assumes a simple open-top rectangular box with uniform wall and base thickness — real sump designs often have a sloped or stepped base for pump clearance.
- Outer block volume
- 1.88 yd³
- Interior void volume
- 0.9 yd³
- Base volume (no waste)
- 0.98 yd³
With the figures above, the concrete volume needed comes to 0.79 m³. Behind that figure, outer block volume is the biggest single quantity at 1.44 m³; start there if the total looks wrong. The method behind this is well established, though site conditions and material batches will move it somewhat. This is calculated for United States and cites IRC 2024. Building in another market? Change the selector above so the units and code reference follow.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
[Schema Verified] Computed in alignment with American Concrete Institute (ACI 318-19) formulas and International Residential Code (IRC 2024) spatial boundaries.
Regulatory standards & verification citations
- Concrete volume = outer block volume minus the hollow interior void (an open-top box with walls and a base of uniform thickness)