Materials & Quantities

Sump Pit & Catch Basin Concrete Calculator

Estimate the concrete volume needed to pour an open-top sump pit or catch basin, accounting for the hollow interior.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
Who is doing the work?

Waste is set to 5% by hand. Pick a tier above to replace it, or keep your own figure.

The overall outside length of the pit or basin.

Measure the full outer footprint, including walls.

The overall outside width of the pit or basin.

Measure perpendicular to the length.

The overall outside height (depth) of the pit or basin.

Includes the base slab thickness.

The thickness of the concrete walls and base.

Assumed uniform on all sides and the base.

Extra concrete for spillage.

5% is standard for this kind of pour.

Concrete volume needed

1.13 yd³

Medium confidence

Assumes a simple open-top rectangular box with uniform wall and base thickness — real sump designs often have a sloped or stepped base for pump clearance.

Outer block volume
2.07 yd³
Interior void volume
1 yd³
Base volume (no waste)
1.07 yd³
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Concrete volume = outer block volume minus the hollow interior void (an open-top box with walls and a base of uniform thickness)

Inputs used

Outer Length
4 ft
Outer Width
4 ft
Outer Height
3.5 ft
Wall & Base Thickness
6 in
Waste Factor (%)
5

Intermediate steps

Outer block volume
2.07 yd³
Interior void volume
1 yd³
Base volume (no waste)
1.07 yd³
Final result1.13 yd³

Confidence note: Assumes a simple open-top rectangular box with uniform wall and base thickness — real sump designs often have a sloped or stepped base for pump clearance.

What this calculation does not cover

  • The shape is a plain rectangular box with one thickness for the walls and the base. It adds nothing for a sloped or stepped base under the pump, benching or a flow channel through a catch basin, a haunch at the wall-to-base joint, or walls that thicken toward the bottom.
  • No openings are deducted and no cover is added. Pipe penetrations, inlet and outlet knockouts and a grate or frame recess all come off the real pour, while a lid, cover slab or ladder rebate all go on it — neither adjustment is in this number.
  • Reinforcement, formwork and waterproofing sit outside the estimate. No rebar, mesh, dowels or lifting anchors are counted, their displaced volume is not taken off the concrete, and there is no allowance for blinding under the base, tanking, or concrete lost into over-break where a wall is poured against soil instead of a form.
  • This is a quantity, not a structural design. It does not check the thickness you entered against soil and groundwater pressure on the walls, against wheel or buffer loads on the base, or against uplift on an empty pit in a high water table. Those calls set the thickness; this only prices the thickness you were given.
  • It does not size the pit. The interior void it reports is raw geometry, not usable storage between pump float levels, and it takes no view on how much sump depth to leave below the outlet for sediment in a catch basin.

Estimated cost — your price

This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.

6 in15.24 cm4 ft1.22 m4 ft1.22 m3.5 ft1.07 m3 ft1 m

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-02 · in the site-wide review of 2026-09-06 · v1.0.1

Regulatory standards & verification citations1
  1. Concrete volume = outer block volume minus the hollow interior void (an open-top box with walls and a base of uniform thickness)
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

  • Ground gas protection is one-shot work: the venting blanket, the welded laps, the top hats and the perimeter tuck are all buried the day the slab goes down.

  • A hoistway is four separate reservations rather than one rectangle, and a wellway is a hole whose length the rise settles long before the truss exists.

  • Sizing a Water Feature's Pumpuses this calculator

    A fountain pump gets sized twice — once for turnover, once for the plume — and the mains top-up brings a relief discharge the courtyard has to swallow.

Called something else where you work? Gullies and surface water inlets — the term in each market, how close the equivalence really is, and the standard that governs it.

How to calculate sump pit & catch basin concrete in 6 steps

  1. Outer LengthThe overall outside length of the pit or basin.
  2. Outer WidthThe overall outside width of the pit or basin.
  3. Outer HeightThe overall outside height (depth) of the pit or basin.
  4. Wall & Base ThicknessThe thickness of the concrete walls and base.
  5. Waste Factor (%)Extra concrete for spillage.
  6. Concrete volume neededThe tool computes the concrete volume needed from those figures and shows the formula, its sources, and a confidence rating alongside it.

Concrete volume needed by outer length

Page defaults, not your figures above.

Outer LengthConcrete volume needed (yd³)
2 ft0.679
3 ft0.861
4 ft1.04
5 ft1.23
6 ft1.41
7 ft1.59

Frequently asked questions

Why is the interior void height different from the outer height?
The base slab needs its own thickness, so the hollow interior only starts above the base — it doesn't extend the full outer height.
Does this include a lid or cover?
No — this is an open-top pit. Add a separate slab volume if you're pouring a cover in place.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.