SettingsSettings for this calculationUS
Floor Screed tonnage as delivered.
About 1.9 short tons per cubic yard for traditional sand-cement screed.
Approximate volume
5.263 yd³
About 1.9 short tons per cubic yard for traditional sand-cement screed. Floor Screed heaps; allow room beyond this figure.
- Conversion factor applied
- 0.53 yd³ per short ton
They open the calculator with your figures already in it
Floor Screed Tons to Cubic Yards Calculator: 5.26 yd³ — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Inverse of approximately 1.9 short tons per cubic yard
- 1 short ton = 2,000 lb; a metric tonne is about 10% heavier
Inputs used
- Floor Screed weight (short tons)
- 10
Intermediate steps
- Conversion factor applied
- 0.53 yd³ per short ton
Confidence note: About 1.9 short tons per cubic yard for traditional sand-cement screed. Floor Screed heaps; allow room beyond this figure.
What this calculation does not cover
- A stated depth is not always the bed depth. A cover over underfloor heating pipes sits on a pipe zone that is mostly screed as well, and a floor laid to falls runs deeper than its stated minimum everywhere but the gully, so divide the volume by the average depth.
- Order bay by bay rather than to the total area. A bay that runs out part-laid carries a joint nobody designed, and the losses that cause it sit outside the arithmetic: material left in the drum and the barrow, and edges and thresholds taking more than plan area allows.
- If the tonnage is covering more floor than this predicts, look at the compaction before the arithmetic. Semi-dry screed is placed loose and beaten down to the finished level, and a bed that was not worked hard enough reaches that level on less material and is weak and hollow-sounding for it.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-08-26 · in the site-wide review of 2026-09-06 · v1.0.0
Regulatory standards & verification citations2
- Inverse of approximately 1.9 short tons per cubic yard
- 1 short ton = 2,000 lb; a metric tonne is about 10% heavier
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.
Converting a screed tonnage into volume tells you what floor area it will cover at the specified thickness. Screed is unforgiving of being laid thin — below its minimum thickness it cracks and debonds — so stretching a load across more area than it properly covers is a false economy that shows up within months. Drying time is the other constraint worth planning around: traditional screed needs a long period before floorcoverings can go down, and rushing it traps moisture under the finish.