Fiber-Reinforced Concrete (FRC) Dosage Calculator

Estimate the mass of synthetic (polypropylene) micro-fiber needed for a fiber-reinforced concrete pour.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
The total volume of concrete being placed, in the unit shown.

Use the volume from the Concrete Calculator for your pour.

The fibre dosage rate, as mass per unit volume of concrete.

0.9-1.5 kg/m³ is typical for shrinkage/temperature crack control; structural (macro) fiber applications use much higher dosages (up to 9 kg/m³) — check your specific product's data sheet.

Fiber needed

26.3 lb

Medium confidence

Fiber dosage varies significantly by product and intended use (shrinkage control vs. structural reinforcement) — always follow the specific fiber manufacturer's technical data sheet for your project.

Equivalent in pounds
26.29 lb
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Typical polypropylene micro-synthetic fiber dosage for shrinkage/temperature crack control is 0.9-1.5 kg per m³ (1.5-2.5 lb per yd³), per common manufacturer technical data sheets (ASTM C1116 Type III fibers)

Inputs used

Concrete Volume
13 yd³
Fiber Dosage Rate
2.02 lb/yd³

Intermediate steps

Equivalent in pounds
26.29 lb
Final result26.29 lb

Confidence note: Fiber dosage varies significantly by product and intended use (shrinkage control vs. structural reinforcement) — always follow the specific fiber manufacturer's technical data sheet for your project.

What this calculation does not cover

  • Only the dosage rate carries any information about the fiber itself. Length, denier, geometry and whether the product is monofilament, fibrillated or macro all change what a given kg/m³ actually delivers, and none of them are inputs. The rate has to come from the data sheet for the fiber being supplied.
  • This is a purchase quantity, not a reinforcement design. It does not look at residual flexural strength, joint spacing, slab thickness or subgrade, and it cannot tell you whether fiber substitutes for bar. A jointless or structural fiber slab is designed against a residual-strength requirement measured on notched beams, and the dose falls out of that design rather than out of a volume multiplied by a rate.
  • The answer is an exact mass for the exact volume typed: no waste allowance, no over-batching margin, and no rounding to whole bags. Fiber ships in pre-weighed bags sized to a batch, so what you actually order is bags per truck — round the mass up yourself against the bag size.
  • The dosage rate is capped at 9 kg/m³ (0.56 pcf). That range covers micro-synthetic and structural synthetic macro fiber, but steel fiber doses used in jointless industrial floors sit well above it, and a rate typed above the cap is clamped down to 9 rather than refused.
  • Nothing here covers what the fiber does to the pour. Mixing time and drum speed decide whether the fibers disperse or ball up, higher doses cut slump and can bring fiber to the surface, and the power-float window moves with them. Those sit with the ready-mix supplier and the finishing crew, not with this number.

Estimated cost — your price

This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-02 · in the site-wide review of 2026-09-06 · v1.2.1

Regulatory standards & verification citations1
  1. Typical polypropylene micro-synthetic fiber dosage for shrinkage/temperature crack control is 0.9-1.5 kg per m³ (1.5-2.5 lb per yd³), per common manufacturer technical data sheets (ASTM C1116 Type III fibers)

Which documents these citations point at

Standards referenced: ASTM C1116 (ASTM International, United States).

Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

Called something else where you work? Placing and compaction — the term in each market, how close the equivalence really is, and the standard that governs it.

Still deciding? Rebar vs Fiber Mesh in a Concrete Slab — the factors that actually differ, with no invented prices.

How to calculate fiber-reinforced concrete (FRC) dosage in 3 steps

  1. Concrete VolumeThe total volume of concrete being placed, in the unit shown.
  2. Fiber Dosage RateThe fibre dosage rate, as mass per unit volume of concrete.
  3. Fiber neededThe tool computes the fiber needed from those figures and shows the formula, its sources, and a confidence rating alongside it.

Fiber needed by concrete volume

Page defaults, not your figures above.

Concrete VolumeFiber needed (lb)
10 yd³20.2
15 yd³30.3
20 yd³40.5
25 yd³50.6

Frequently asked questions

Do synthetic fibers replace rebar?
No — micro-synthetic fibers (this calculator) primarily control plastic shrinkage cracking, not structural load. Structural fiber reinforcement uses a different class of macro-fibers (steel or structural synthetic) at much higher dosages and doesn't substitute for rebar in most applications without an engineer's specific design.
How are fibers added to the mix?
Typically added directly to the ready-mix truck drum and mixed for several minutes at full drum speed before discharge — follow the manufacturer's mixing time recommendation.
Does fiber dosage affect workability?
Yes — higher dosages can reduce slump and workability, sometimes requiring a water-reducing admixture adjustment; discuss with your ready-mix supplier before specifying a high dosage.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.