Cavity Barrier Run and Crossing Count Calculator
How much cavity barrier a facade takes, and how many carrier crossings must be cut and sealed on the way, the labour item bills most often miss.
Materials & Quantities
Compartmentation, and the arithmetic of holding a fire where it started.

Rated board by layer and by face, shaftwall liner panels, intumescent coating to a target dry film thickness, firestop sealant at penetrations and at head-of-wall joints, the aggregate opening cap on electrical boxes in a rated partition, cavity barrier runs and the carrier crossings along them, char depth on exposed mass timber, and the listed edge clearance for rated glazing.
Whether the thing you are quantifying is on a tested line or merely near one. A rated assembly is tested whole — the board, the fixings, the joint treatment and whatever passes through it — so a substitution that looks equivalent sits outside the test that earned the rating. Every page here asks what the tested detail actually is instead of averaging across products, and several hand back a figure whose job is to be taken to the listing rather than acted on.
Active systems — detection, alarm, suppression and smoke control — which are designed by a different discipline and sized to a different question; and means of escape, which is about people moving rather than about a line holding.
12 calculators
How much cavity barrier a facade takes, and how many carrier crossings must be cut and sealed on the way, the labour item bills most often miss.
How many people a floor holds, and how wide each way out must be once the largest is discounted, since a fire may block the exit someone would use.
How many extinguishers a floor takes by the area rule and by the travel rule — and which of the two governs, because it is usually the one people skip.
How far a head-of-wall joint opens and closes at its listed movement class, and how much backing and sealant the run consumes at the listed fill depth.
Look up a typical listed edge clearance (bite) range for common fire-rated glazing and frame type combinations.
Calculate total Type X gypsum board sheets needed for a multi-layer, both-sides fire-rated wall assembly.
Calculate the firestop sealant volume needed to seal the annular gap around wall/floor penetrations.
Calculate the intumescent fireproofing material needed to achieve a target dry film thickness on structural steel.
Check the electrical boxes in a fire-rated wall against the opening-area cap for that wall area and the separation between boxes on opposite faces.
Calculate how many shaftwall liner panels are needed to fill the stud cavities of a shaft wall assembly.
Type X gypsum boards for a fire-rated wall boarded on one face only, a shaft or corridor face, without the both-sides doubling that over-orders it.
What a fire period takes off an exposed timber member, notional char plus the zero-strength layer, and the residual section and sanding margin it leaves.