SettingsSettings for this calculationUS
The volume of clay soil in cubic yards.
About 1.5 short tons per cubic yard for clay; heavier than loam and highly sensitive to moisture.
Approximate weight
15 short tons
About 1.5 short tons per cubic yard for clay; heavier than loam and highly sensitive to moisture. A planning figure, not a specification. Confirm the density with your supplier before ordering by weight.
- Conversion factor applied
- 1.5 short tons per yd³
They open the calculator with your figures already in it
Clay Soil Cubic Yards to Tons Calculator: 15 short tons — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Typical bulk density used here: approximately 1.5 short tons per cubic yard
- Density varies with moisture, grading and composition — the supplier's ticket weight governs
Inputs used
- Clay Soil volume (yd³)
- 10
Intermediate steps
- Conversion factor applied
- 1.5 short tons per yd³
Confidence note: About 1.5 short tons per cubic yard for clay; heavier than loam and highly sensitive to moisture. A planning figure, not a specification. Confirm the density with your supplier before ordering by weight.
What this calculation does not cover
- Say which volume you measured. Clay in the ground and the same clay loose in a spoil heap are two different volumes of one material, and this page applies a single planning density to whichever number it is given — so the hole and the heap return different tonnages for the same dig. Settle which of the two you are working from before a load or a charge is planned on the answer.
- An excavation is rarely all clay. Topsoil at the surface, a stone band, old fill or a softer horizon at the base each carry their own weight per cubic yard, and putting the whole excavation volume through one clay density weighs all of it as clay. Split the volume by layer where the difference is large enough to change a load count.
- Treat this as a planning tonnage, not the figure a charge is settled on. Where haulage or disposal is priced by weight the weighbridge ticket governs; where it is sold as a fixed weight allowance per load, this is the number to test that allowance against. For excavated clay the rate per ton also turns on how the material is classified, which no density conversion can tell you.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-08-26 · in the site-wide review of 2026-09-06 · v1.0.0
Regulatory standards & verification citations2
- Typical bulk density used here: approximately 1.5 short tons per cubic yard
- Density varies with moisture, grading and composition — the supplier's ticket weight governs
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.
Clay is the excavated material most likely to complicate a job, and its weight per cubic yard is high enough to matter for haulage. What makes clay difficult is not density but behaviour: it holds water, shrinks and swells with the seasons, and becomes unworkable when wet. Excavated clay also bulks substantially, so the spoil from a trench occupies noticeably more space than the hole it came from — which is why disposal volumes routinely exceed the excavation figure.