SettingsSettings for this calculationUS
The volume of wet plaster in cubic yards.
About 1.6 short tons per cubic yard for mixed gypsum plaster; the dry powder is considerably lighter.
Approximate weight
16 short tons
About 1.6 short tons per cubic yard for mixed gypsum plaster; the dry powder is considerably lighter. A planning figure, not a specification. Confirm the figure with your supplier or waste contractor before relying on it.
- Conversion factor applied
- 1.6 short tons per yd³
They open the calculator with your figures already in it
Wet Plaster Cubic Yards to Tons Calculator: 16 short tons — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Typical bulk density used here: approximately 1.6 short tons per cubic yard
- Density varies with moisture, grading and how the material was processed
Inputs used
- Wet Plaster volume (yd³)
- 10
Intermediate steps
- Conversion factor applied
- 1.6 short tons per yd³
Confidence note: About 1.6 short tons per cubic yard for mixed gypsum plaster; the dry powder is considerably lighter. A planning figure, not a specification. Confirm the figure with your supplier or waste contractor before relying on it.
What this calculation does not cover
- Mixed plaster only travels between the mixer and the wall. With the mixer on the working floor, what climbs the stair is bags and a hose; with it at ground level, the wet weight goes up as well.
- Scaffolds and old suspended floors care what stands in one place, not what a day totals. Plastering concentrates it — bagged stock, filled baths, water and the plasterer at the same end of the platform. What that will take comes from whoever designed, hired or owns it.
- A background takes its coat at the coat's heaviest. The board or lath and its fixings carry the wet weight, and drying sheds only the surplus water — the rest is chemically combined into the set and stays in the wall.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-08-26 · in the site-wide review of 2026-09-06 · v1.0.0
Regulatory standards & verification citations2
- Typical bulk density used here: approximately 1.6 short tons per cubic yard
- Density varies with moisture, grading and how the material was processed
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.
Plaster volume follows from wall area and coat thickness, and the weight matters mainly for handling and for loading on suspended work. Mixed plaster is far heavier than the powder it came from, since the mix water is a substantial part of it, and that difference catches people out when estimating what has to be carried upstairs. Coverage is normally quoted by the manufacturer per bag at a stated thickness, which is a more reliable basis for ordering than a volume calculation.