SettingsSettings for this calculationUS
Waste is set to 5% by hand. Pick a tier above to replace it, or keep your own figure.
The total gym or athletic court floor area to underlay.
Use the full court or activity area, including any surrounding safety/apron zone that will also receive shock-absorbing pad.
Extra pad material for trim waste at the perimeter and around fixed equipment anchors.
5% is typical for a rectangular court; increase it for floors with many equipment anchor cutouts or irregular boundaries.
Underlayment pad needed
3,392 sq ft
They open the calculator with your figures already in it
Sports/Athletic Floor Underlayment Pad Calculator: 3,392 sq ft — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Pad area = court/floor area × (1 + waste allowance), accounting for trim waste at the perimeter and around fixed equipment anchors
Inputs used
- Court/Floor Area
- 3230 sq ft
- Waste Allowance (%)
- 5
What this calculation does not cover
- Assumes the pad covers the floor, and plenty of systems do not. Point-elastic and combined builds sit on discrete pads at set centres beneath a plywood subfloor, so the material is a COUNT of pads on a grid, not square metres of sheet — a 300 m² (3,230 sq ft) court can take several thousand of them. Establish which of the two the specified system is before this area becomes a purchase order.
- The slab underneath decides whether any of it performs. Flatness governs the result — sports systems are commonly specified to something like 3 mm (0.12 in) under a 3 m (10 ft) straightedge — and a hollow beneath the pad is a dead spot on the court that the correct material cannot fix. Slab moisture governs whether it can be laid at all: a timber floor over a damp slab cups within a season.
- A sports floor has to be free to move. The expansion void around the whole perimeter, and the vented base that covers it, are part of the system rather than trim, and that is a perimeter length nowhere in an area figure. Fill the gap or run the floor tight to the wall and it lifts in the middle on the first humid week.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-06 · in the site-wide review of 2026-09-06 · v1.0.1
Regulatory standards & verification citations1
- Pad area = court/floor area × (1 + waste allowance), accounting for trim waste at the perimeter and around fixed equipment anchors