Floor Drain Slope Screed Volume Calculator

Calculate the screed/mortar volume needed to slope a floor toward a central drain.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
How the floor falls, which is what sets the average depth.

This is the whole difference between the two answers and it is a 33% one. A one-way fall is a plane: depth runs from the maximum at the high edge to zero at the channel, and the average across it is exactly half. A fall to a central point is not a plane but a set of triangular facets meeting at the drain, and the deep material at the perimeter covers far more plan area than the shallow material near the middle — the average works out at two thirds of the maximum. Sizing a point-drain floor at half under-orders the screed by a quarter.

The floor area that slopes down toward the drain.

Measure the full area draining to this point, such as a shower pan, wet room floor, or mechanical room floor with a central drain.

The screed thickness at the perimeter, where it is deepest, tapering to zero at the drain.

This is set by the required slope (commonly around 2%, i.e. 1:50) times the distance from the drain to the farthest perimeter point.

Screed volume needed

13.4 gal

Medium confidence

Assumes a simple linear slope from the perimeter down to a single central drain — a floor with multiple drains or a non-uniform slope will need a more detailed volume takeoff.

Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Screed volume = area × maximum depth × the average-depth factor for the fall geometry. A ONE-WAY fall, from a high edge down to a linear channel or a threshold, averages HALF the maximum depth. A fall to a CENTRAL POINT drain averages TWO THIRDS of it: the shallow ground near the drain occupies far less plan area than the deep ground out at the perimeter, so the mean is pulled up. Integrating a linear fall over a plane triangle from an edge to a central apex gives exactly 2/3, whatever the room's plan shape

Inputs used

Fall Geometry
Falls to a central point drain (average depth = 2/3 of maximum)
Floor Area Sloping to Drain
43 sq ft
Maximum Screed Depth at Perimeter
0.75 in
Final result13.4 gal

Confidence note: Assumes a simple linear slope from the perimeter down to a single central drain — a floor with multiple drains or a non-uniform slope will need a more detailed volume takeoff.

What this calculation does not cover

  • The wedge tapers to nothing at the drain, and no screed can. A bonded sand-cement screed wants roughly 25 mm (1 in) at its thinnest and an unbonded or floating one 50 mm (2 in) or more, so the real pour is this wedge PLUS that minimum carried across the whole area — which on a small wet room is usually more material than the wedge itself. Feather it out below that instead and the thin ring around the drain debonds and cracks under the tile.
  • Depth here is measured from a substrate assumed flat and level, which a deck rarely is. If the slab already falls the wrong way, or the drain body and its clamping flange sit proud of it, the maximum depth entered above stops describing the pour. Take levels off the drain flange and off the highest point of the slab before ordering — on a dished floor the make-up can be more material than the fall itself.

Estimated cost — your price

This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-06 · in the site-wide review of 2026-09-06 · v1.0.1

Regulatory standards & verification citations1
  1. Screed volume = area × maximum depth × the average-depth factor for the fall geometry. A ONE-WAY fall, from a high edge down to a linear channel or a threshold, averages HALF the maximum depth. A fall to a CENTRAL POINT drain averages TWO THIRDS of it: the shallow ground near the drain occupies far less plan area than the deep ground out at the perimeter, so the mean is pulled up. Integrating a linear fall over a plane triangle from an edge to a central apex gives exactly 2/3, whatever the room's plan shape
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Tools and safety for this job

To lay a floor screed. Generic types, no brands, no prices.

Protection this work requires

  • Cutting or grinding concrete, masonry, screed, tile or fibre-cement board releases respirable silica: cut wet or extract at the tool, and wear a P2/N95 respirator at minimum — a nuisance dust mask does not filter it.
  • Wet cement and lime burn skin and eyes painlessly until the damage is done: waterproof gloves to EN 374, safety glasses whenever the mix can splash, and never kneel in wet mix in permeable trousers.
  • Boards, blocks and bagged material cause most lasting back injuries on small sites: two people or a lifter for full sheets, and never a bag on one shoulder up a ladder.
Show the 6 tools this job needs

Essential

  • Mixing bucket or tub

  • Screed bar or rail

  • Shovel and spade

  • Spirit level

Recommended

  • Moisture meter

  • Paddle mixer

what each flooring tool is for, and the spec that decides which to buy where one does.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

  • The doorway is the one junction on a building where a wet outdoor floor meets a dry indoor one at the same level. Detail it outward from there.

  • Plumbing a Bathroomuses this calculator

    A bathroom is decided in the floor void and the stud cavity, months before anyone sees a tap, and depth is the currency every decision spends.

  • Quarry tile priced the way a kitchen fails it: falls to the gullies, ten-millimetre joints in chemical-resistant grout, a trim on every edge that stops.

Called something else where you work? Self-levelling compound · Wet room and curbless shower — the term in each market, how close the equivalence really is, and the standard that governs it.

The data behind it: Production rates by operation

How to calculate floor drain slope screed volume in 4 steps

  1. Fall GeometryHow the floor falls, which is what sets the average depth.
  2. Floor Area Sloping to DrainThe floor area that slopes down toward the drain.
  3. Maximum Screed Depth at PerimeterThe screed thickness at the perimeter, where it is deepest, tapering to zero at the drain.
  4. Screed volume neededThe tool computes the screed volume needed from those figures and shows the formula, its sources, and a confidence rating alongside it.

Screed volume needed by floor area sloping to drain

Page defaults, not your figures above.

Floor Area Sloping to DrainScreed volume needed (gal)
20 sq ft6.54
30 sq ft9.82
40 sq ft13.1
50 sq ft16.4
60 sq ft19.6
70 sq ft22.9
80 sq ft26.2

Frequently asked questions

Why is the average depth two-thirds of the maximum for a point drain, but half for a channel?
A one-way fall to a channel or a threshold is a single plane, so its depth runs evenly from the maximum at the high edge to nothing at the channel and averages half. A fall to a point drain is four faces meeting at the drain — a shallow upside-down pyramid — and a pyramid holds a third of its box, so the average is two-thirds of the maximum whatever the room's shape: most of the floor lies out towards the deep edges, not near the shallow middle. Pricing a point-drain floor at half under-orders the wedge by a quarter.
How is the maximum depth determined?
By your required slope, commonly about 2% (1:50), over the distance from the drain to the farthest point on the perimeter: a longer run to the drain at the same slope needs a greater maximum depth.
Does this work for a floor with more than one drain?
No — this assumes a single central drain with a uniform linear slope from the perimeter. A floor with multiple drains or an irregular slope pattern needs a more detailed, section-by-section volume takeoff.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.