Materials & Quantities

Brick Rubble Cubic Yards to Tons Calculator

Convert a brick rubble volume into short tons for weight limits, haulage and disposal pricing.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
The volume of brick rubble in cubic yards.

About 1.2 short tons per cubic yard for broken brick and mortar; lighter than concrete rubble but still heavy waste.

Approximate weight

12 short tons

High confidence

About 1.2 short tons per cubic yard for broken brick and mortar; lighter than concrete rubble but still heavy waste. A planning figure, not a specification. Check the figure against the container's or vehicle's weight limit before booking.

Conversion factor applied
1.2 short tons per yd³
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Typical bulk density used here: approximately 1.2 short tons per cubic yard
  • Density varies with moisture, composition and how the material was broken or processed

Inputs used

Brick Rubble volume (yd³)
10

Intermediate steps

Conversion factor applied
1.2 short tons per yd³
Final result12 short tons

Confidence note: About 1.2 short tons per cubic yard for broken brick and mortar; lighter than concrete rubble but still heavy waste. A planning figure, not a specification. Check the figure against the container's or vehicle's weight limit before booking.

What this calculation does not cover

  • A wall's outside dimensions are not its brick volume. Measuring length by height by full thickness on a cavity wall counts the cavity and the blockwork inner leaf as brick. Take those off, and convert concrete lintels, sills and footings at their own density rather than this one.
  • How the container is filled changes the tons per cubic yard. Rubble dropped in by grab or bucket and pushed down as the machine works sits tighter than the same material barrowed in, so a machine-loaded container reaches its weight limit before it reaches this yardage.
  • This factor is for broken material, not for the wall. Brickwork bulks by roughly half again as it comes down, so a volume measured off intact masonry — which is what the first note above walks you through — converts at a solid-brickwork density nearer 1.6 short tons per cubic yard rather than the 1.2 used here for loose arisings. Either bulk the measured wall volume by about 1.5 before entering it, or measure the heap.
  • The tonnage says nothing about where it can stand. A loaded skip puts its whole weight through a few small bearing points, and arisings heaped on a suspended floor, a basement vault or a block-paved drive concentrate it further. Check what the ground or structure underneath will carry before the container is sited or the pile is built.

Estimated cost — your price

This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-08-26 · in the site-wide review of 2026-09-06 · v1.0.0

Regulatory standards & verification citations2
  1. Typical bulk density used here: approximately 1.2 short tons per cubic yard
  2. Density varies with moisture, composition and how the material was broken or processed
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Brick arisings sit between clean aggregate and concrete rubble in density, and the mortar content is what moves the figure. Old lime-mortared brickwork breaks apart cleanly and produces relatively light, sortable arisings; cement-mortared work comes away in lumps that carry more mortar per brick and weigh more. That distinction matters for reclaim as much as for disposal, since bricks that separate cleanly are worth salvaging and those bonded in cement generally are not. Estimate the volume from the wall being taken down, convert, and check it against the container's weight limit.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

How to calculate brick rubble cubic yards to tons in 2 steps

  1. Brick Rubble volume (yd³)The volume of brick rubble in cubic yards.
  2. Approximate weightThe tool computes the approximate weight from those figures and shows the formula, its sources, and a confidence rating alongside it.

Brick Rubble Cubic Yards to Tons at common values

Page defaults, not your figures above.

Brick Rubble volume (yd³)Approximate weight (short tons)
11.2
22.4
56
1012
2024
5060
100120

Frequently asked questions

Does mortar type change the weight?
It changes both weight and workability. Cement mortar clings to the brick and adds weight per unit; lime mortar releases cleanly, leaving lighter arisings and salvageable brick. Older buildings are far more likely to be lime-bonded.
Is brick rubble good hardcore?
It is commonly used as fill and sub-base where crushed, though it is softer than crushed stone and less suitable under heavy loading. Check what the specification permits rather than assuming it is interchangeable.
Should I sort brick for reclaim?
If the mortar releases cleanly, usually yes. Reclaimed brick has real value and sorting reduces the weight going to disposal, so the labour is paid for twice. Cement-mortared brick rarely justifies the effort.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.