Materials & Quantities

Dumpster/Skip Container Size Selector

Determine the smallest standard dumpster/skip size that fits your estimated debris volume, accounting for irregular packing.

Recommended dumpster size: 20 yd³ for Estimated Debris Volume 15 yd³, the page's opening figures; on the metric page, 11.47 m³ gives 15.3 m³. Sources are cited below.

  • Answers as you type
  • 1 source cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
The estimated loose volume of debris you need to haul away.

Use the loose (bulked/swelled) volume, not the compact in-place volume — demolished material takes up more room once broken up. See the Demolition Bulk Volume Swell calculator if you're starting from an intact structure's volume.

How solidly the debris packs into the container — irregular debris leaves air gaps.

Irregular demolition/construction debris does not pack solidly; a packing efficiency of roughly 70-80% is a common construction-industry estimating rule of thumb. Bulkier, more irregular material (e.g. broken drywall, framing lumber) sits toward the lower end; denser, more uniform material sits toward the higher end.

Recommended dumpster size

20 yd³

Medium confidence

Standard sizes and availability vary by hauler and region — confirm exact dimensions and weight limits with your specific waste hauler, since some materials (e.g. concrete, dirt, roofing) have separate weight-based limits regardless of the container's volume.

Required capacity accounting for packing
20 yd³

Formula with your numbers

  1. Divide by the packing efficiency ÷ % = 20 yd³
  2. Take the next standard size up20 yd³ → the smallest of 10, 15, 20, 30 and 40 yd³ (7.6 to 30.6 m³) that holds it = 20 yd³
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Required capacity = Estimated debris volume ÷ Packing Efficiency (irregular demolition/construction debris does not pack solidly, leaving air gaps — a packing efficiency of roughly 70-80% is a common construction-industry estimating rule of thumb). The calculator then selects the smallest standard US dumpster/skip size (10, 15, 20, 30, or 40 cubic yards — the standard sizes offered by nearly all US roll-off haulers) that meets or exceeds that required capacity.

Inputs used

Estimated Debris Volume
15 yd³
Packing Efficiency (%, Irregular Debris ~70-80%)
75

Intermediate steps

Required capacity accounting for packing
20 yd³
Final result20 yd³

Confidence note: Standard sizes and availability vary by hauler and region — confirm exact dimensions and weight limits with your specific waste hauler, since some materials (e.g. concrete, dirt, roofing) have separate weight-based limits regardless of the container's volume.

What this calculation does not cover

  • The smallest box that holds the debris is not always the box the site can take. A 40-yard roll-off is around 22 ft (6.5 m) long and wants roughly 60 ft (18 m) of straight, level approach for the truck to winch it off, plus about 23 ft (7 m) of overhead clear of wires and branches; a 10 or a 15 will sit in a driveway where a 40 cannot even turn around. Check the drop before ordering the size the volume asked for.
  • Volume here means level-full. Roll-offs are hauled with nothing above the top rail, because the load has to be sheeted and it has to be legal down the road, so a container heaped over the sides is either re-worked on site before it leaves or left behind. The packing efficiency you entered describes air trapped between the pieces, not the freeboard the driver needs above them.
  • One box means one mixed load, and mixed is the expensive way to get rid of material. Clean concrete, clean fill, scrap metal and cardboard each go out at their own rate, sometimes at no charge or a rebate, and dropping any of them into the general box carries them all at the mixed construction-and-demolition rate. A diversion target usually means a second, smaller container rather than a single larger one.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-06 · 2 test vectors · in the site-wide review of 2026-09-06 · v1.1.1

Regulatory standards & verification citations1
  1. Required capacity = Estimated debris volume ÷ Packing Efficiency (irregular demolition/construction debris does not pack solidly, leaving air gaps — a packing efficiency of roughly 70-80% is a common construction-industry estimating rule of thumb). The calculator then selects the smallest standard US dumpster/skip size (10, 15, 20, 30, or 40 cubic yards — the standard sizes offered by nearly all US roll-off haulers) that meets or exceeds that required capacity.
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Tools and safety for this job

To segregate and remove waste. Generic types, no brands, no prices.

Protection this work requires

  • Boards, blocks and bagged material cause most lasting back injuries on small sites: two people or a lifter for full sheets, and never a bag on one shoulder up a ladder.
  • Knives cause more site injuries than any power tool: cut away from your body, change blades often, and wear cut-resistant gloves to EN 388 level C for repeated cutting.
Show the 2 tools this job needs

Essential

  • Shovel and spade

  • Wheelbarrow

what each site-management tool is for, and the spec that decides which to buy where one does.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

Called something else where you work? Skip / dumpster — the term in each market, how close the equivalence really is, and the standard that governs it.

Still deciding? Bigger Skip vs Longer Hire — the factors that actually differ, with no invented prices.

How to calculate Dumpster/Skip container size selector in 2 steps

  1. Divide by the packing efficiencyDivide the loose debris volume by the packing efficiency for the container capacity it really takes, air gaps included.
  2. Take the next standard size upPick the smallest standard US roll-off size, 10, 15, 20, 30 or 40 cubic yards, that meets or exceeds the required capacity.

Recommended dumpster size by estimated debris volume

Page defaults, not your figures above.

Estimated Debris VolumeRecommended dumpster size (yd³)
10 yd³15
15 yd³20
20 yd³30
25 yd³40
30 yd³40

Key facts

  • Standard US roll-off dumpsters come in 10, 15, 20, 30 and 40 cubic yard sizes (about 7.6, 11.5, 15.3, 22.9 and 30.6 m³), offered by nearly all US haulers. (Standard US roll-off sizes)
  • One cubic yard is 0.7646 m³, so a 20-yard dumpster holds about 15.3 m³ and a 40-yard dumpster about 30.6 m³. (NIST SI Guide, App. B.9)
  • Irregular construction and demolition debris packs at roughly 70 to 80% of a container's volume, so the capacity needed is the loose debris volume divided by that packing efficiency. (Debris packing rule of thumb)
  • The US EPA's 2016 volume-to-weight factors weigh concrete debris at about 860 lb per cubic yard (510 kg/m³) and dirt and sand at 929 lb per cubic yard (551 kg/m³). (EPA volume-to-weight factors, 2016)

Frequently asked questions

Why does the required capacity exceed my actual debris volume?
Irregular demolition/construction debris does not pack solidly into a container — it leaves air gaps between pieces. Dividing by a packing efficiency of roughly 70-80% accounts for that wasted space so the container you order actually has enough real capacity.
Why are only certain sizes offered?
This calculator selects from the standard US roll-off sizes — 10, 15, 20, 30, or 40 cubic yards — since these are the sizes offered by nearly all US waste haulers, picking the smallest one that meets or exceeds your required capacity.
Is volume the only limit I need to worry about?
No — always confirm weight limits with your specific hauler as well. Materials like concrete, dirt, or roofing shingles are dense enough to hit a container's weight limit long before it's visually full, regardless of its cubic-yard rating.
What size dumpster holds 15 cubic yards of debris?
A 20-yard dumpster: 15 yd³ (11.5 m³) of loose debris at the default 75% packing efficiency needs 20 yd³ of capacity, which is exactly a stock size, so the page does not step up to the 30. Pack it worse than 75% and the same debris needs the 30-yard box; check the drop space and the weight limit before ordering either.
How big is a 20-yard dumpster in cubic metres?
About 15.3 m³: a cubic yard is 0.7646 m³, so the five standard US sizes of 10, 15, 20, 30 and 40 yd³ hold about 7.6, 11.5, 15.3, 22.9 and 30.6 m³. On a metric page the answer is the same box, given in cubic metres; container sizes outside the US are set by each hire company's own list.
What packing efficiency should I use?
Roughly 70 to 80% for irregular demolition and construction debris, the rule of thumb the page cites, and the choice can move the box a size: 15 yd³ of debris needs 21.4 yd³ of capacity at 70%, a 30-yard dumpster, but only 18.75 yd³ at 80%, a 20-yard. Bulky broken drywall and framing lumber sit toward the low end; denser, more uniform material toward the high end.
Can the dumpster be filled above the top?
No: roll-offs are hauled with nothing above the top rail, because the load has to be sheeted and legal on the road, so a heaped container is re-worked on site or left behind. The capacity the page works out is level-full, and the packing efficiency is the air between the pieces, not the space the driver needs above them.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.