The volume in cubic yards.

A cubic yard is about 0.765 cubic metres, so a yardage figure always converts to a smaller metric number.

Volume

7.646 m³

High confidence

1 yd³ = 0.764554857984 m³ exactly, from 1 yd = 0.9144 m. The same volume carries a smaller number in cubic metres — a cubic metre is the larger unit.

Conversion factor applied
0.76 m³ per yd³
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • 1 yd = 0.9144 m exactly, so 1 yd³ = 0.9144³ = 0.764554857984 m³

Inputs used

Volume (yd³)
10

Intermediate steps

Conversion factor applied
0.76 m³ per yd³
Final result7.65 m³

Confidence note: 1 yd³ = 0.764554857984 m³ exactly, from 1 yd = 0.9144 m. The same volume carries a smaller number in cubic metres — a cubic metre is the larger unit.

Estimated cost — your price

This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-08-26 · in the site-wide review of 2026-09-06 · v1.0.0

Regulatory standards & verification citations1
  1. 1 yd = 0.9144 m exactly, so 1 yd³ = 0.9144³ = 0.764554857984 m³
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

An American take-off being priced by a metric supplier needs this direction, and the conversion is exact because the yard is defined as precisely 0.9144 metres. The point that catches people is that the metric figure is smaller for the same physical volume, since a cubic metre is the larger unit — the instinct that metric numbers are bigger runs the wrong way here. Practically, converting before contacting a supplier lets you check the requirement against their minimum load, which is stated in cubic metres and frequently carries a part-load surcharge below it that can exceed the value of the material saved by ordering short.

Now that you have the number

These guides cover the work this quantity is for.

How to calculate cubic yards to cubic metres in 2 steps

  1. Volume (yd³)The volume in cubic yards.
  2. VolumeThe tool computes the volume from those figures and shows the formula, its sources, and a confidence rating alongside it.

Cubic Yards to Cubic Metres at common values

Page defaults, not your figures above.

Volume (yd³)Volume (m³)
10.765
21.53
53.82
107.65
2015.3
5038.2
10076.5

Frequently asked questions

Is the conversion exact?
Yes. The yard is defined as exactly 0.9144 metres, so the cubic conversion is that figure cubed. No measurement uncertainty is involved.
Why is the metric number smaller?
Because a cubic metre is larger than a cubic yard. The same physical volume therefore carries a smaller number in metric, which is the opposite of what people often expect.
Do metric suppliers have minimum loads?
Generally yes, expressed in cubic metres. Converting your requirement first lets you see whether it clears the minimum or whether a part-load charge applies.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.