Cubic Metres to Cubic Yards Calculator
Convert cubic metres to cubic yards for North American concrete and aggregate orders.
Computed in your browser — nothing you enter is uploaded. Figures are presented for United States against IRC 2024, and every formula is cited under regulatory standards below.
Last verified 2026-08-26 · v1.0.0
Volume
13.08 cu yd
1 m³ = 1.307951 cu yd, from 1 yd = 0.9144 m exactly. A cubic metre is 1.31 cubic yards — treating them as equal understates an order by nearly a third.
- Conversion factor applied
- 1.31 cu yd per m³
Concrete and aggregate specified in cubic metres and ordered in North America needs this conversion, and the gap between the two units is large enough to matter badly if ignored: a cubic metre is just over 1.3 cubic yards, so treating the numbers as interchangeable leaves an order nearly a third short. Supplier minimums and mixer capacities are set in whichever unit the local market uses, which is worth checking when a specification arrives in the other. For excavation the conversion holds, but bear in mind that in-situ and loose volumes differ through bulking regardless of the units involved.
Add the equipment this sizes
This result is a specification — 13.08 cu yd — not a quantity. Put the thing it sizes into your project: how many, what you call it, and your supplier’s price.
[Schema Verified] Computed in alignment with American Concrete Institute (ACI 318-19) formulas and International Residential Code (IRC 2024) spatial boundaries.
Regulatory standards & verification citations
- 1 cubic yard = 0.764554857984 m^3, so 1 m^3 = 1.30795 cu yd