Materials & Quantities

Temporary Access Ramp Slope Compliance Calculator

Check a temporary construction access ramp's slope against the standard 1:12 maximum accessibility ratio.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
The total vertical height the ramp climbs, from bottom to top.

Measure the full vertical rise the ramp needs to overcome, such as the height difference between a site entrance and grade level.

The total horizontal length the ramp covers.

Measure the horizontal distance from the base of the ramp to where it reaches full rise — not the sloped length along the ramp surface.

Ramp slope percentage

7.692 %

High confidence

This checks against the widely-referenced 1:12 (≈8.33%) maximum slope benchmark from ADA/ANSI A117.1 accessible-route standards. A temporary construction ramp's actual required slope depends on its specific use (pedestrian-only vs. equipment/wheelbarrow access, which may have different practical limits) and any project-specific accessibility requirements — confirm the applicable standard for your specific ramp's purpose.

Run-to-rise ratio
13 :1 (target ≥12:1)
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Slope percentage = (Rise ÷ Horizontal Run) × 100; run:rise ratio = Run ÷ Rise. The widely-referenced maximum ramp slope for accessible routes (per ADA Standards for Accessible Design / ANSI A117.1) is 1:12 (a rise of 1 inch for every 12 inches of run, ≈8.33%) — commonly used as a practical benchmark for temporary construction site ramps even when full ADA compliance isn't the specific driver, since it represents a widely-recognized safe/walkable maximum grade.

Inputs used

Ramp Total Rise (Vertical)
1.5 ft
Ramp Horizontal Run
19.5 ft

Intermediate steps

Run-to-rise ratio
13 :1 (target ≥12:1)
Final result7.69 %

Confidence note: This checks against the widely-referenced 1:12 (≈8.33%) maximum slope benchmark from ADA/ANSI A117.1 accessible-route standards. A temporary construction ramp's actual required slope depends on its specific use (pedestrian-only vs. equipment/wheelbarrow access, which may have different practical limits) and any project-specific accessibility requirements — confirm the applicable standard for your specific ramp's purpose.

What this calculation does not cover

  • Only looks at the slope along the ramp. CROSS slope — the fall across its width — is held far tighter, to 1:48 (2%), and a temporary ramp bedded on site fill or bridging a kerb picks that up without anyone measuring it. A chair on a compliant running slope with a 4% cross fall steers itself toward the edge.
4.4°19.5 ft5.94 m1.5 ft0.457 m7.69 % · 13:1 run to risevertical scale ×25 ft2 m

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-06 · in the site-wide review of 2026-09-06 · v1.0.1

Regulatory standards & verification citations1
  1. Slope percentage = (Rise ÷ Horizontal Run) × 100; run:rise ratio = Run ÷ Rise. The widely-referenced maximum ramp slope for accessible routes (per ADA Standards for Accessible Design / ANSI A117.1) is 1:12 (a rise of 1 inch for every 12 inches of run, ≈8.33%) — commonly used as a practical benchmark for temporary construction site ramps even when full ADA compliance isn't the specific driver, since it represents a widely-recognized safe/walkable maximum grade.
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Now that you have the number

These guides cover the work this quantity is for.

How to calculate temporary access ramp slope compliance in 3 steps

  1. Ramp Total Rise (Vertical)The total vertical height the ramp climbs, from bottom to top.
  2. Ramp Horizontal RunThe total horizontal length the ramp covers.
  3. Ramp slope percentageThe tool computes the ramp slope percentage from those figures and shows the formula, its sources, and a confidence rating alongside it.

Ramp slope percentage by ramp total rise (Vertical)

Page defaults, not your figures above.

Ramp Total Rise (Vertical)Ramp slope percentage (%)
1 ft5.08
1.5 ft7.62
2 ft10.2
2.5 ft12.7
3 ft15.2

Frequently asked questions

What is the maximum allowable ramp slope this checks against?
This checks against the widely-referenced 1:12 (approximately 8.33%) maximum slope benchmark from ADA Standards for Accessible Design / ANSI A117.1, a rise of 1 inch for every 12 inches of run.
Does 1:12 apply to every temporary construction ramp?
Not necessarily — a temporary construction ramp's actual required slope depends on its specific use (pedestrian-only vs. equipment/wheelbarrow access, which may have different practical limits) and any project-specific accessibility requirements. Confirm the applicable standard for your specific ramp's purpose before relying on this benchmark alone.
What does the run-to-rise ratio tell me?
The same slope as a ratio (run:rise) rather than a percentage: a 1:12 target means at least 12 units of horizontal run for every 1 unit of vertical rise. A lower ratio than 12:1 means the ramp is steeper than the 1:12 benchmark.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.