Pedestrian Covered Walkway Support Bay Spacing Calculator
Calculate the number of structural support bays needed for a pedestrian covered walkway/canopy at its maximum allowable bay spacing.
Materials & Quantities
Keeping people safe while the building goes up: scaffolds, open edges, ladders and the site's temporary barriers.

Scaffold ties under OSHA's height-to-base rule, the load on a bay against light, medium and heavy duty and the load classes of BS EN 12811-1, plank spans, face area and hire weeks, and the bearing under a base plate; guardrail and toe-board dimensions, roof anchor spacing, debris nets, ladder setup angles, covered walkways, temporary access ramps and temporary fencing with its wind ballast.
Which rule the scaffold or barrier was put up to, and what it is carrying. A scaffold is tied, planked and loaded to a duty chosen before it went up — light for inspection, heavier where materials are stacked on it — and the arithmetic here only means something against that duty, the manufacturer's instructions or the design it was erected to. The pages count and compare; none of them signs a scaffold off.
Scaffold design itself — tie forces, anchor capacity in the wall, bracing, wind on a sheeted scaffold — and the permanent ramps, stairs and guarding of the finished building, which have a family of their own.
14 calculators
Calculate the number of structural support bays needed for a pedestrian covered walkway/canopy at its maximum allowable bay spacing.
Check a guardrail system's top rail height and rated load capacities against the fixed requirements of OSHA 29 CFR 1926.502(b).
Check a non-self-supporting portable ladder's setup angle and landing extension against OSHA's 4:1 placement rule.
Calculate the number of fall protection anchor points needed along a rooftop walk path.
Calculate the total netting area needed to enclose a building perimeter or scaffold with debris/safety netting.
Check a scaffold leg's bearing pressure on its base plate or sole board against the ground's allowable bearing capacity.
Work out the face area a scaffold is quoted on, with the lifts, bays and standards that go with it — and what the weekly hire adds while it stands.
Set a scaffold's support spacing beside the longest span OSHA's Appendix A gives a wood plank at light, medium or heavy duty, and count the planks.
Spread the people and materials on one scaffold bay over its platform, and set the load beside OSHA's duty ratings and BS EN 12811-1's six load classes.
Count the ties, guys or braces OSHA requires on a supported scaffold taller than four times its base width, by tie level and position along the face.
Calculate the number of standard temporary fence panels needed to enclose a site perimeter.
Calculate the ballast mass needed to resist wind-induced overturning of a free-standing temporary fence panel.
Check a temporary construction access ramp's slope against the standard 1:12 maximum accessibility ratio.
Check a platform toe board's height and gap against OSHA's fixed requirements, and calculate the linear board stock needed.