Materials & Quantities

Handrail Gooseneck and Easing Calculator (Rail Heights, Gooseneck Rise and Mitre Cuts)

From your stair and two rail heights: whether the top takes a gooseneck or an easing, its rise, each mitre cut off square, and the rail along the flight.

Gooseneck rise: 4 in for Total Rise 9 ft, Riser You Are Aiming For 7.25 in and Going 10.25 in, the page's opening figures; on the metric page, 2.7 m, 185 mm and 260 mm give 100 mm. Sources are cited below.

  • Answers as you type
  • 2 sources cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
Finished floor below to finished floor above.

Measured on site with the finishes each floor will carry; the risers share it equally.

The rise per step you want.

Rounded up into whole risers, so the pitch is the stair's own.

Nosing to nosing.

With the riser, it sets the pitch.

Top of the rail, plumb above the nosing line.

The IRC reads 34–38 in, Approved Document K 900–1000 mm.

The landing's rail or guard.

Higher than the rake: a gooseneck; the same: an easing; lower: a ramp.

The code the rail heights are read against.

Figures compared with the code's own, never compliance: the building official or building control body decides. Where this page does not read a code's figures it says so rather than guessing them.

Gooseneck rise

4 in

High confidence

A gooseneck: the rake turns up into a vertical, then level. WITHIN THE LIMITS CHECKED — rail 889 mm (35.00 in) above the nosings, level rail 991 mm (39.00 in), inside the figures this page reads for IRC R311.7.8.1 and R312.1.2. Limits checked, not an approval.

Pitch
35.09 °
Cut, rake to vertical (each piece, saw setting from square)
27.46 °
Cut, vertical to level (saw setting from square)
45 °
Cut, rake to level (an easing, saw setting from square)
17.54 °
Rail along the flight
14.61 ft · 14 ft 7 3/8 in
Post height at the foot
35 in
Post height at the top
39 in
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Two straight members meeting with a change of direction d are each cut d / 2 from square (the saw setting; 90° less it from the member's axis): rake to level d = pitch, rake to vertical d = 90° - pitch (up, a gooseneck) or 90° + pitch (down, a ramp), vertical to level d = 90°; pitch = atan(riser / going)
  • US: IRC R311.7.8.1 (handrail 34–38 in measured vertically from the sloped plane of the nosings) and R312.1.2 (guards at least 36 in); UK: Approved Document K 1.34 (handrails 900–1000 mm above the pitch line); the NCC's and the NBC's rail heights are not read here

Inputs used

Total Rise (floor to floor)
9 ft
Riser You Are Aiming For
7.25 in
Going
10.25 in
Rail height over the nosings
35 in
Level rail height at the landing
39 in
Code for the readout
US — IRC

Intermediate steps

Pitch
35.09 °
Cut, rake to vertical (each piece, saw setting from square)
27.46 °
Cut, vertical to level (saw setting from square)
45 °
Cut, rake to level (an easing, saw setting from square)
17.54 °
Rail along the flight
14.61 ft
Post height at the foot
35 in
Post height at the top
39 in
Final result4 in

Confidence note: A gooseneck: the rake turns up into a vertical, then level. WITHIN THE LIMITS CHECKED — rail 889 mm (35.00 in) above the nosings, level rail 991 mm (39.00 in), inside the figures this page reads for IRC R311.7.8.1 and R312.1.2. Limits checked, not an approval.

What this calculation does not cover

  • This works out a rail's turn and cuts; it does not approve the rail or the guard. Heights are read against the IRC's and Approved Document K's figures; graspability, returns, extensions and the guard's strength are your building official's.
  • The cuts are for straight pieces meeting at a point; a bent or laminated easing, a volute or a turnout at the foot are the rail maker's fittings.
  • The rail is measured plumb above the nosings, as the codes measure it; the posts' own caps and the rail's profile height are added by the maker.

Add the equipment this sizes

This result is a specification — 4 in — not a quantity. Put the thing it sizes into your project: how many, what you call it, and your supplier’s price.

9 ft
Schematic, drawn to the proportions you entered — not to scale on screen.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-11-14 · 5 test vectors · v1.0.1

Regulatory standards & verification citations2
  1. Two straight members meeting with a change of direction d are each cut d / 2 from square (the saw setting; 90° less it from the member's axis): rake to level d = pitch, rake to vertical d = 90° - pitch (up, a gooseneck) or 90° + pitch (down, a ramp), vertical to level d = 90°; pitch = atan(riser / going)
  2. US: IRC R311.7.8.1 (handrail 34–38 in measured vertically from the sloped plane of the nosings) and R312.1.2 (guards at least 36 in); UK: Approved Document K 1.34 (handrails 900–1000 mm above the pitch line); the NCC's and the NBC's rail heights are not read here

Which documents these citations point at

  • International Residential Code — R311.7.8.1 (United States)One- and two-family dwellings and townhouses up to three storeys — structure, fire safety, energy, plumbing, mechanical and electrical in a single document.
  • Approved Documents to the Building Regulations (England) — K (United Kingdom)Practical guidance on meeting the Building Regulations, one lettered part per subject — Part A structure, Part B fire, Part K protection from falling, Part L conservation of fuel and power, and the rest.

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments. This site holds no adoption data for any authority, so check what is in force with the authority where you build. Any section cited above without an edition should be checked against the edition in force where you build. What it would take to know.

Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

The rail drawn and its joints

A scaled elevation of the flight and its rail, the gooseneck or easing at the top with its rise and every mitre cut, the posts, and the rail heights read against the codes.

Full-size handrail turn template

Print the rail's turn at the top at full size, in elevation with every mitre line, the joint points, level and plumb, or each piece laid out with its cuts, at your rail's depth, tiled over A4 or Letter with a calibration square and cross-hairs to line the sheets up.

Every stair type, the planner and the templates: the Stairs hub

How to calculate handrail gooseneck and easing (rail heights, gooseneck rise and mitre cuts) in 7 steps

  1. Total Rise (floor to floor)Finished floor below to finished floor above.
  2. Riser You Are Aiming ForThe rise per step you want.
  3. GoingNosing to nosing.
  4. Rail height over the nosingsTop of the rail, plumb above the nosing line.
  5. Level rail height at the landingThe landing's rail or guard.
  6. Code for the readoutThe code the rail heights are read against.
  7. Gooseneck riseThe tool computes the gooseneck rise from those figures and shows the formula, its sources, and a confidence rating alongside it.

Frequently asked questions

When does a handrail need a gooseneck?
When the level rail at the landing stands higher than the rail on the rake: the rake turns up into a short vertical and then level. If both heights are the same, an easing turns it straight into the level rail.
What angle do I cut a gooseneck?
Half the change of direction off square on each piece. On a stair pitched 34.7°, the rake meets the vertical at 55.3°, so each is cut 27.65°; the vertical meets the level at 90°, so each is cut 45°.
How high should a stair handrail be?
The IRC asks 34–38 in above the nosings and Approved Document K 900–1000 mm above the pitch line; a guard at an open landing edge is at least 36 in under the IRC.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.