SettingsSettings for this calculationUS
The volume of concrete rubble in cubic yards.
About 1.5 short tons per cubic yard for broken concrete; solid concrete is denser, but rubble carries large voids.
Approximate weight
15 short tons
About 1.5 short tons per cubic yard for broken concrete; solid concrete is denser, but rubble carries large voids. A planning figure, not a specification. Check the figure against the container's or vehicle's weight limit before booking.
- Conversion factor applied
- 1.5 short tons per yd³
They open the calculator with your figures already in it
Concrete Rubble Cubic Yards to Tons Calculator: 15 short tons — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Typical bulk density used here: approximately 1.5 short tons per cubic yard
- Density varies with moisture, composition and how the material was broken or processed
Inputs used
- Concrete Rubble volume (yd³)
- 10
Intermediate steps
- Conversion factor applied
- 1.5 short tons per yd³
Confidence note: About 1.5 short tons per cubic yard for broken concrete; solid concrete is denser, but rubble carries large voids. A planning figure, not a specification. Check the figure against the container's or vehicle's weight limit before booking.
What this calculation does not cover
- What leaves site is more than the element on the drawing. A ground-bearing slab lifts with blinding, hardcore or screed still attached and a grubbed-up foundation comes away with soil on it, while a suspended slab, a wall or a column carries none of that. Those extras add to the load, but they are not broken concrete and do not convert at the density used here, so work them out separately instead of folding them into this volume.
- This factor is for broken material, not for the structure. Breaking a slab out bulks it up, so the heap takes appreciably more room than the element did, and a volume measured off an intact slab or wall converts at a solid-concrete density nearer two short tons per cubic yard rather than the 1.5 used here.
- The tonnage has to stand somewhere before it is collected. A few cubic yards of arisings is a modest-looking heap and several tons pressing on whatever is beneath it — a suspended slab, a basement lid, a drain run, a paved surface. The conversion gives you that load; it says nothing about whether the standing will carry it.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-08-26 · in the site-wide review of 2026-09-06 · v1.0.0
Regulatory standards & verification citations2
- Typical bulk density used here: approximately 1.5 short tons per cubic yard
- Density varies with moisture, composition and how the material was broken or processed
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.
Demolition arisings are the material most likely to catch out a skip booking, because broken concrete is heavy and containers are usually weight-limited long before they are full. The density here is for broken material with the voids that breaking creates — solid concrete is considerably denser per cubic yard, which is why an intact slab converts differently from the rubble it becomes. Estimating the volume from the structure being removed and converting to weight is the way to find out whether a container will be refused, and it is a far cheaper discovery than making it on collection day.