The tonnage quoted, permitted or delivered.
About 1.6 short tons per cubic yard for loose asphalt millings; compacted millings are considerably denser.
Approximate volume
6.25 yd³
About 1.6 short tons per cubic yard for loose asphalt millings; compacted millings are considerably denser. Loose material occupies more space than stacked or compacted material.
- Conversion factor applied
- 0.63 yd³ per short ton
They open the calculator with your figures already in it
Asphalt Millings Tons to Cubic Yards Calculator: 6.25 yd³ — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Inverse of approximately 1.6 short tons per cubic yard
- 1 short ton = 2,000 lb; a metric tonne is about 10% heavier
Inputs used
- Asphalt Millings weight (short tons)
- 10
Intermediate steps
- Conversion factor applied
- 0.63 yd³ per short ton
Confidence note: About 1.6 short tons per cubic yard for loose asphalt millings; compacted millings are considerably denser. Loose material occupies more space than stacked or compacted material.
What this calculation does not cover
- Unscreened planings come with bound lumps well above the size of any aggregate in the mix that was cut, which is why millings bought for reuse are usually screened or crushed first. A layer only a particle or two deep cannot lock together and ravels under wheels. Take the area down rather than the depth.
- Some of the tonnage never becomes depth. On a rutted or soft base the millings key into the low spots before thickness starts building, usually the larger of the two losses; at an unrestrained edge the roller has nothing to compact against, so the perimeter stays loose and sheds under traffic. Grade the base and edge the run rather than stacking two more allowances on the consolidation one.
- Traffic finishes whatever compaction the roller did not. Left to it, the wheel paths consolidate and the rest does not, so within weeks the run carries two firm tracks with looser material between and beside them. That is a rolling failure rather than a shortfall in tonnage, and the answer is passes across the full width, not more material.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-08-26 · in the site-wide review of 2026-09-06 · v1.0.0
Regulatory standards & verification citations2
- Inverse of approximately 1.6 short tons per cubic yard
- 1 short ton = 2,000 lb; a metric tonne is about 10% heavier
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.
Converting a millings tonnage to volume is how you check whether a load will surface the area you have. The behaviour that distinguishes millings from ordinary aggregate is that they partially re-bind: the old bitumen still present softens in the sun and, under compaction, knits the surface together into something firmer than loose stone. That means a millings surface laid in cold weather stays loose and one laid in heat sets up well, which affects both how much material beds down and how the finished surface performs.