Financial-Adjacent

Bathroom Remodel Cost Calculator

Price a bathroom by fixture count and waterproofed area, with the labour weighting a small wet room really carries.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
Bath, shower, basin, WC, bidet — each counts as one.

A fixture is a supply point plus a waste plus fitting labour. Moving one to a new position costs far more than replacing it in place, because the waste has to be re-run at a fall.

Item, pipework and fitting labour per fixture.

One fixture's whole cost — the item, the pipework to reach it, and the labour to fit it — averaged across the fixtures you are installing. A basin and a WC are cheap to move; a bath and a shower are not, and a fixture that moves more than a metre from its existing waste is a different job from one that stays put. If the layout is changing, this rate should reflect the moved fixtures rather than the ones that stay.

Walls plus floor.

A small bathroom has a high ratio of wall area to floor area, which is why the cost per unit of floor area looks alarming compared with any other room.

Tile, adhesive, grout and labour.

Tile, adhesive, grout, setting out and fixing labour, priced against the tiled area above. THIS FIELD DOES NOT FOLLOW THE UNIT TOGGLE. The tiled area does — it is held in square metres and redisplayed in sq ft for an imperial visitor — but there is no dimension for a price per unit area, so this number is used exactly as typed, against an area in square metres. One square metre is 10.7639 sq ft, so a rate from a US or Canadian price book has to be MULTIPLIED by 10.7639 before it goes in this box: the 130 per m² in this page's worked figures is the same price as 12.08 per sq ft. Typing 12.08 here is accepted in silence — it is well inside the 0 to 100,000 this field allows, so nothing is clamped and no notice appears — and on the 22 m² default the tiling line comes out at 265.70 instead of 2,860. That is about 2,594 missing before contingency and about 2,983 after the 15% is added to it. The mistake only ever runs one way: an unconverted per-sq-ft rate under-states tiling to 9.29% of the real cost.

Wet zone requiring a membrane.

The shower enclosure and its surroundings at minimum; the whole room in a wet room. This is not optional and it is not what backer board does — it is a separate membrane or liquid system, and skipping it is the single most expensive mistake in bathroom work.

Membrane or liquid system, applied.

Price the sheet or the coating plus the labour to apply it, and include the corner tapes, the floor-to-wall bands and the pipe collars — joints and penetrations are where a tanking failure almost always starts, and they are the first thing a cheap price leaves out. This field is PER SQUARE METRE and does not follow the metric/imperial switch, although the tanked-area field above it does, so on an imperial page you are reading an area in one system beside a rate in the other. A per-square-foot rate is 10.7639 times smaller than the same rate per square metre: the 55 per m² used in the example here is 5.11 per-square-foot. Typing the per-square-foot figure is not refused and raises no notice, because it sits well inside the 0 to 100,000 this field accepts — it simply prices the waterproofing at 9.3% of what you meant, which on the example values takes 6.4% off the total, and 14.5% off a wet room tanked throughout. Multiply a per-square-foot rate by 10.7639 before entering it.

Fan, ducting and its electrical supply.

Ducted to outside, not into a loft. Terminating an extract in a roof space moves the moisture rather than removing it, and it is a recognised cause of condensation damage.

Lighting, shaver point, heated rail, paint.

The items that are individually small and collectively a fifth of a bathroom: lighting and its zones, an extractor, a shaver socket, a heated towel rail and its circuit, mirrors, and the decorating. They are grouped because each one alone is not worth its own field and because leaving them out is the standard way a bathroom budget comes up short.

Higher where the existing floor is unknown.

Twenty-five percent in an older property. Lifting a bathroom floor is how you find out the joists have been notched for the old waste run, and that is a structural repair discovered mid-job.

Total bathroom cost

Needs your rates

This page does not assume a price. Enter yours and the answer appears here.

Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Element-based estimating; rates are user-supplied. No market data is embedded.
  • Fixtures are priced per point (supply, waste and fitting); waterproofing and tiling per square metre

Inputs used

Number of fixtures
4
Rate per fixture (supplied and fitted)
Tiled area
240 sq ft
Tiling rate (per m², supplied and fitted)
Waterproofed (tanked) area
86 sq ft
Waterproofing rate (per m²)
Extract ventilation
0
Electrics, decorating, sundries
0
Contingency (%)
15
Final resultNaN

What this calculation does not cover

  • Excludes moving the soil stack or the WC to a materially different position, which changes the drainage design rather than the fit-out.
  • Excludes structural repair to a floor found to be inadequate once lifted — a common discovery and the main reason the contingency here is set higher than for other rooms.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-05 · in the site-wide review of 2026-09-06 · v1.0.1

Regulatory standards & verification citations2
  1. Element-based estimating; rates are user-supplied. No market data is embedded.
  2. Fixtures are priced per point (supply, waste and fitting); waterproofing and tiling per square metre
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

How to calculate bathroom remodel cost in 10 steps

  1. Number of fixturesBath, shower, basin, WC, bidet — each counts as one.
  2. Rate per fixture (supplied and fitted)Item, pipework and fitting labour per fixture.
  3. Tiled areaWalls plus floor.
  4. Tiling rate (per m², supplied and fitted)Tile, adhesive, grout and labour.
  5. Waterproofed (tanked) areaWet zone requiring a membrane.
  6. Waterproofing rate (per m²)Membrane or liquid system, applied.
  7. Extract ventilationFan, ducting and its electrical supply.
  8. Electrics, decorating, sundriesLighting, shaver point, heated rail, paint.
  9. Contingency (%)Higher where the existing floor is unknown.
  10. Total bathroom costThe tool computes the total bathroom cost from those figures and shows the formula, its sources, and a confidence rating alongside it.

Frequently asked questions

Why does a tiny bathroom cost nearly as much as a big one?
Because almost nothing about a bathroom scales with floor area. The fixture count is the same, the waterproofing covers the same shower, the extract fan is one fan, and the labour to cut tiles around four fixtures in a small room is greater per square metre, not less. Halving the floor area of a bathroom rarely takes more than about a fifth off the cost.
Is waterproofing really a separate cost from tiling?
Yes, and conflating them is the most expensive misunderstanding in this trade. Tile and grout are not waterproof — water passes through grout routinely. Backer board is water-resistant, not waterproof. A tanking membrane or liquid-applied system underneath is what keeps water out of the structure, and a shower built without one will damage the floor beneath it, typically within a few years and invisibly until it is serious.
Should I move the WC?
Only with a good reason. A WC waste needs a specific fall to the stack, and moving it more than a short distance means either lifting the floor to re-run it or accepting a boxed-in run at high level. It changes the job from a fit-out into a drainage alteration, and it is the single most common cause of a bathroom budget doubling.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.