Learning path · Taking a room from bare boards to paint

Finishing a room

A room is finished from the top down and from the rough to the fine. Boarding before the floor, the floor before the skirting, the skirting before the last coat of paint: change the order and something gets scuffed, cut short or painted twice.

Each step here is a guide you can read in one sitting, and most carry an animated demonstration of the quantity they buy, so the sheet count or the litres of paint are worked on your own room's figures as you read.

  • 7Steps in order
  • 1 h 29 minReading and trying
  • 6Guides with an animated demo

The path, in order

0 of 7 done

  1. Guide · 12 min · animated demo

    Hanging Drywall

    The ceiling and walls go up first; everything after is fixed to them.

  2. Guide · 9 min · animated demo

    Taping and Finishing to a Level

    Taping and coats of compound, and how flat a wall has to be for the paint you chose.

  3. Guide · 11 min · animated demo

    Floating Floor Installation

    The floor goes down before the trim so the skirting can hide its edge gap.

  4. Guide · 20 min · animated demo

    Fitting Skirting and Architrave

    Trim closes the joints between wall, floor and frame; its demo cuts a casing set from stock lengths.

  5. Calculator · 4 min

    Baseboard & Trim Calculator

    Your room's own lengths, with the corners and the waste counted.

  6. Guide · 11 min · animated demo

    Painting Interior Walls

    Walls and ceilings, coat by coat, once the dust has stopped.

  7. Guide · 22 min · animated demo

    Painting Woodwork and Trim

    Woodwork last, so a brush on the skirting never meets a roller on the wall.

Your ticks stay in this browser and nowhere else. The printed sheet is a personal record of what you read, not a certificate or a qualification.