Learning path · First pours, from a shed base to a garage slab

Concrete basics

Most concrete that fails on a small job was ordered short, placed too wet or left to dry in the sun. None of those are mysteries; they are steps taken out of order. This path puts them back in order.

It starts with the shape the concrete will take, moves to the volume and the delivery, and ends with the week after the pour, when the strength is actually made.

  • 8Steps in order
  • 1 h 40 minReading and trying
  • 6Guides with an animated demo

The path, in order

0 of 8 done

  1. Guide · 12 min · animated demo

    Building and Bracing Formwork

    The forms decide the level, the edge and the thickness, so they come before any arithmetic.

  2. Guide · 11 min · animated demo

    Footings, Piers and Frost Depth

    Footings are the smallest pours and the most forgiving place to learn the sequence.

  3. Guide · 17 min · animated demo

    The Master Guide to Pouring a Professional Concrete Slab

    The full slab job: sub-base, mesh or bar, pour, screed and finish.

  4. Calculator · 4 min

    Concrete Calculator

    Run your own slab through it and keep the figure for the order.

  5. Guide · 16 min · animated demo

    Pouring a Slab From Bagged Mix

    Where the volume is small enough that bags beat a truck, and how to keep the batches the same.

  6. Guide · 16 min

    Checking a Ready-Mix Truck at the Gate

    What to read on the ticket before the chute swings over your forms.

  7. Guide · 13 min · animated demo

    Jointing Concrete Flatwork

    Cracks are planned on paper or they choose their own line.

  8. Guide · 11 min · animated demo

    Curing Concrete in Heat and Cold

    The last step and the one most often skipped: strength is gained in the days after the pour.

Your ticks stay in this browser and nowhere else. The printed sheet is a personal record of what you read, not a certificate or a qualification.