Learning path · First pours, from a shed base to a garage slab
Concrete basics
Most concrete that fails on a small job was ordered short, placed too wet or left to dry in the sun. None of those are mysteries; they are steps taken out of order. This path puts them back in order.
It starts with the shape the concrete will take, moves to the volume and the delivery, and ends with the week after the pour, when the strength is actually made.
- 8Steps in order
- 1 h 40 minReading and trying
- 6Guides with an animated demo
The path, in order
0 of 8 done
Guide · 12 min · animated demo
Building and Bracing Formwork
The forms decide the level, the edge and the thickness, so they come before any arithmetic.
Guide · 11 min · animated demo
Footings, Piers and Frost Depth
Footings are the smallest pours and the most forgiving place to learn the sequence.
Guide · 17 min · animated demo
The Master Guide to Pouring a Professional Concrete Slab
The full slab job: sub-base, mesh or bar, pour, screed and finish.
Calculator · 4 min
Concrete Calculator
Run your own slab through it and keep the figure for the order.
Guide · 16 min · animated demo
Pouring a Slab From Bagged Mix
Where the volume is small enough that bags beat a truck, and how to keep the batches the same.
Guide · 16 min
Checking a Ready-Mix Truck at the Gate
What to read on the ticket before the chute swings over your forms.
Guide · 13 min · animated demo
Jointing Concrete Flatwork
Cracks are planned on paper or they choose their own line.
Guide · 11 min · animated demo
Curing Concrete in Heat and Cold
The last step and the one most often skipped: strength is gained in the days after the pour.
Your ticks stay in this browser and nowhere else. The printed sheet is a personal record of what you read, not a certificate or a qualification.