Materials & Quantities

Screened Topsoil Tons to Cubic Yards Calculator

Convert a screened topsoil tonnage into cubic yards to check capacity, coverage and storage.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
The tonnage quoted, permitted or delivered.

About 1.15 short tons per cubic yard for screened topsoil; slightly lighter than unscreened because stone has been removed.

Approximate volume

8.696 yd³

High confidence

About 1.15 short tons per cubic yard for screened topsoil; slightly lighter than unscreened because stone has been removed. Loose material occupies more space than stacked or compacted material.

Conversion factor applied
0.87 yd³ per short ton
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Inverse of approximately 1.15 short tons per cubic yard
  • 1 short ton = 2,000 lb; a metric tonne is about 10% heavier

Inputs used

Screened Topsoil weight (short tons)
10

Intermediate steps

Conversion factor applied
0.87 yd³ per short ton
Final result8.7 yd³

Confidence note: About 1.15 short tons per cubic yard for screened topsoil; slightly lighter than unscreened because stone has been removed. Loose material occupies more space than stacked or compacted material.

What this calculation does not cover

  • Bulk bags are filled by volume and labelled with a nominal weight, and where that label is metric it does not match the short tons this calculator takes: a metric tonne is about 10% heavier, so a tonne figure entered unconverted returns a volume roughly a tenth short. The printed weight also carries whatever moisture was in the soil at filling, so where the supplier states a volume per bag, work from that instead.
  • The volume this returns is loose soil, and part of it goes into the formation before any depth registers on top. A subgrade that has been ripped or scarified — which is the right preparation, since it relieves compaction and prevents an interface that perches water and stops roots getting down — has furrows to fill, and one rutted by plant has more. Allow for that fill as a quantity separate from the finished depth.
  • The volume has to stand somewhere between delivery and spreading, and beyond one lorry-load it arrives as separate drops rather than a single heap you can plan around. Screened soil is fine material, so a heap sheds fines in heavy rain and packs down into something harder to shift, and grass under one left for weeks does not recover. Check the footprint against the standing you can spare, and sheet or board it if the soil will not be moved quickly.

Estimated cost — your price

This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-08-26 · in the site-wide review of 2026-09-06 · v1.0.0

Regulatory standards & verification citations2
  1. Inverse of approximately 1.15 short tons per cubic yard
  2. 1 short ton = 2,000 lb; a metric tonne is about 10% heavier
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Converting a screened topsoil tonnage into volume is the check on whether a delivery will cover the beds to the depth planned. Settlement is the factor most often forgotten: freshly spread topsoil consolidates over the first weeks under its own weight and rain, so a bed filled level on the day sits low by the next season. Spreading slightly proud accounts for that. Screened soil settles somewhat more evenly than unscreened, because there is no stone fraction to bridge and create voids.

How to calculate screened topsoil tons to cubic yards in 2 steps

  1. Screened Topsoil weight (short tons)The tonnage quoted, permitted or delivered.
  2. Approximate volumeThe tool computes the approximate volume from those figures and shows the formula, its sources, and a confidence rating alongside it.

Screened Topsoil Tons to Cubic Yards at common values

Page defaults, not your figures above.

Screened Topsoil weight (short tons)Approximate volume (yd³)
10.87
21.74
54.35
108.7
2017.4
5043.5
10087

Frequently asked questions

How much will this tonnage cover?
Spread over the bed area, its loose volume gives the loose depth: at 1.15 short tons per cubic yard of screened topsoil, 10 short tons, the page's default, is about 8.7 cubic yards. Then allow for settlement, which is appreciable in the first weeks and is why beds filled flush end up sitting low.
Why does screened soil weigh less?
Because the stone fraction has been removed, and stone is denser than soil. The difference is modest but real, which is why screened and as-dug material convert at slightly different densities.
Can I compact topsoil to save volume?
You should not. Compacted topsoil drains poorly and roots struggle in it. Firm it only enough to remove large air pockets and let natural settlement do the rest.
What does the screening mesh size tell me about the product?
Suppliers screen through a stated mesh — commonly 10 mm for premium lawn dressing, 20 mm for general landscaping. A finer screen means no clod larger than that dimension survives, so 10 mm material rakes to seed-bed tilth straight off the truck, while 20 mm still wants a pass with a landscape rake. The mesh size also nudges the conversion slightly: finer screenings pack marginally closer, so a 10 mm product can run a touch heavier per yard than the same soil screened at 20 mm.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.