Secant / Contiguous Pile Wall Overlap Calculator

Check whether a bored pile wall's spacing produces true secant overlap or a contiguous gap between piles.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
The diameter of each drilled pile.

The DESIGN diameter of the bore. Construction tolerance is what this calculation is really about: a secant wall that overlaps on paper by less than the rig's positional tolerance is a contiguous wall in the ground, with a gap between the piles for water to find. If the piles are of two diameters — primary and secondary — this arrangement assumes they are equal, and an unequal-diameter wall needs its own geometry.

The distance between adjacent pile centers.

For a secant wall, this must be less than the pile diameter to create overlap.

Pile overlap (or gap)

0.5 ft overlap

High confidence

True secant configuration — adjacent piles physically overlap, forming a continuous water-resistant wall (assuming the secondary piles are cut into the primary piles as designed).

Spacing-to-diameter ratio
0.75
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Secant pile geometry: adjacent piles overlap when center-to-center spacing is less than the pile diameter; overlap distance = diameter minus spacing (a negative result indicates a gap, i.e. a contiguous rather than secant wall)

Inputs used

Pile Diameter
2 ft
Center-to-Center Spacing
18 in

Intermediate steps

Spacing-to-diameter ratio
0.75
Final result0.5 ft overlap

Confidence note: True secant configuration — adjacent piles physically overlap, forming a continuous water-resistant wall (assuming the secondary piles are cut into the primary piles as designed).

What this calculation does not cover

  • This is a geometry check on the two numbers you type, not a wall design. It says nothing about pile capacity, embedment below formation level, wall stiffness, or the earth and water pressures the wall has to hold, and it does not stand in for a temporary works design.
  • Verticality is not in the arithmetic. A bored pile drifts off plumb with depth, so a nominal overlap that holds at the top can be gone at the toe; the deeper the wall, the more design overlap it needs, and this does not tell you how much to add.
  • It assumes every pile is full diameter and set exactly on its layout point. Setting-out error, casing or auger wander, and over- or under-break in the bore all eat into overlap, and none of them are modelled — the number is nominal, not as-built.
  • Nothing here covers the concrete or the sequence: primary pile mix strength (the soft, firm or hard secant distinction), the window in which the secondary pile must be cut into the primary, reinforcement, or guide-wall setting-out. A geometrically valid overlap can still be undrillable.
  • A positive overlap is not proof the wall will hold water. Sealing depends on joint quality, construction tolerance and any grouting or membrane treatment, and a contiguous wall — spacing at or beyond the pile diameter — needs a separate water-control measure whatever this returns.

Estimated cost — your price

This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.

2 ft0.5 m18 in457.2 mm2 ft0.61 m6 in0.152 m4 piles

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-02 · in the site-wide review of 2026-09-06 · v1.0.1

Regulatory standards & verification citations1
  1. Secant pile geometry: adjacent piles overlap when center-to-center spacing is less than the pile diameter; overlap distance = diameter minus spacing (a negative result indicates a gap, i.e. a contiguous rather than secant wall)
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

Still deciding? Dewatering vs Cut-Off Wall — the factors that actually differ, with no invented prices.

How to calculate secant / contiguous pile wall overlap in 3 steps

  1. Pile DiameterThe diameter of each drilled pile.
  2. Center-to-Center SpacingThe distance between adjacent pile centers.
  3. Pile overlap (or gap)The tool computes the pile overlap (or gap) from those figures and shows the formula, its sources, and a confidence rating alongside it.

Frequently asked questions

What's the difference between secant and contiguous pile walls?
Secant piles physically overlap, forming a continuous barrier suitable for groundwater control, while contiguous piles are spaced with a small gap between them and don't seal against water. In a secant wall the primary and secondary piles interlock; a contiguous wall relies on the gap being small enough (or otherwise treated) to retain soil.
What overlap amount is typically targeted?
A common target is 100-150mm (4-6 in) of overlap for secant walls, though this varies by project specification and equipment tolerance — always check your project's structural design.
Does this account for pile verticality tolerance?
No — this is a nominal geometric check based on design spacing. Real drilled piles have some verticality tolerance over depth, so deeper walls typically need more design overlap margin to guarantee actual overlap is maintained at the base.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.