Cross-market term

Stud and framed partition

The vertical member in a framed wall, spanning between a bottom and a top plate and carrying the wall's covering — and, in a loadbearing wall, the floor or roof above.
  • 4Markets
  • NoSame thing everywhere
  • 5Calculators

What it is called, by market

One concept, four markets. Where a name means something else locally, the card says so rather than leaving you to find out on site.

  • United Kingdom

    Same word, different thing

    stud

    also stud wall, timber frame, partition, CLS, metal stud

    Stud wall is used for the whole partition, so a quantity of studs and a quantity of stud wall are different things. A stud is also a threaded bar and a fixing, both of which appear on the same drawing.

  • Australia

    Close, not identical

    stud

    also wall frame, noggin, top plate, bottom plate

    As the UK, with the framing usually supplied as prefabricated wall frames rather than cut on site, so the stud is a component of a delivered panel.

  • United Statesyours

    Close, not identical

    stud

    also 2x4, 2x6, king stud, jack stud, cripple

    The framing vocabulary is far more differentiated: king, jack, cripple and trimmer name a stud by its role at an opening, and British usage has no standard word for most of them.

  • Canada

    Close, not identical

    stud

    also 2x4, 2x6, wall stud, trimmer

    As the United States, with 2x6 exterior walls far more common because the insulation depth is driven by a colder design temperature.

The governing standard, by market

  • United Kingdom

    BS EN 1995-1-1 / BS 8212

    Design of timber structures, and code of practice for dry lining and partitioning with gypsum board.

  • United States

    IRC R602 / AWC NDS

    Wood wall framing, stud size and spacing tables by storey and loading, and the national design specification for wood construction.

Calculators for this

Each works in either measurement system, and the terminology on the page follows whichever market you have selected.

Frequently asked questions

Why is a 2x4 not two inches by four?
Because it was, before it was planed. Timber is sawn to the nominal size green and then dried and surfaced, and both take material off — so a nominal 2x4 finishes at about 1½ by 3½ inches, a 2x6 at 1½ by 5½, and the nominal figure survives as a name rather than a measurement. British practice has the same phenomenon with an extra wrinkle: timber is sold both SAWN and PLANED, and a 'four by two' regularised for framing is typically around 38 by 89 mm — which is the same finished section as an American 2x4 by a different route, since 38 by 89 is 1½ by 3½ inches converted. So the two markets nominally disagree and physically arrive at the same stick. What does not travel is the assumption: a specification quoting a nominal size has not stated a dimension, and a specification quoting millimetres usually has.
What are king, jack and cripple studs, and what does British practice call them?
They are studs named by their job at an opening, and British practice mostly has no equivalent words. A KING stud runs full height beside an opening; a JACK or trimmer stud is the shorter one nailed to it that carries the header or lintel; a CRIPPLE is a short stud above a header or below a sill, filling the gap at the normal spacing so the covering still has a fixing. British drawings tend to describe the same arrangement geometrically — a full-height stud each side with a trimmer under the lintel and short studs over — without naming the members. The consequence when reading American framing guidance is that the count matters: a specification calling for two jacks each side is calling for four extra studs per opening, and that is not a detail a British take-off derived from a stud spacing will have picked up.
Why is stud spacing 400 or 600 mm rather than anything else?
Because the BOARD decides it, not the stud. Plasterboard and sheathing come in fixed widths — 1200 mm, or 4 feet — and every sheet edge has to land on a member. Divide 1200 by 400 and you get exactly three bays with an edge on a stud at each end; divide by 600 and you get two. That is the whole reason those two numbers dominate: they are the divisors of the sheet, and 16 and 24 inches are the same two numbers in the other system. The structural question — whether a stud of a given size can carry the load at that spacing — is then checked against the spacing the boards imposed, rather than the other way round. It is also why a non-standard spacing costs more in board than it saves in timber: every sheet needs cutting and the offcut is usually waste.