Count the chairs, bolsters and side-form spacers a reinforcing mat needs so its cover survives a crew walking on it.

Rebar is reinforcement bar in the UK.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
The longer plan dimension of the reinforcing mat.

Support lines are set out along this direction at the rated spacing, so it drives how many lines the mat needs. Where a slab is poured in bays, take one bay at a time — a construction joint interrupts the mat and the supports with it.

The plan dimension across the direction the support lines run.

This decides how many bars each support line has to carry. Individual chairs sit at the intersections; a continuous bolster spans the whole width in one piece, which is why the page reports both counts.

Centre-to-centre spacing of the bars being supported.

Closer bars mean more of them to hold up, but they also stiffen the mat, which is part of why a supplier's rated support spacing varies with the grid. Enter the spacing of the layer that actually rests on the supports.

How far apart the supports may sit along a bar, from your supplier's data or your specification.

This is the number that decides whether cover survives the pour. A mat that will be walked on, or that carries a heavy top layer, needs closer supports than one that will not — and a spacing chosen for a static check is the wrong spacing for a crew dragging a hose across it.

Whether each bar sits on a support or the mat spans between supported bars.

A stiff mat with closely spaced bars can span between supported lines, which cuts the chair count substantially. A light mat cannot, and the unsupported bars sag between the ones that are held — visible in the finished soffit as a wavy cover line.

Enter one for a single layer, two where a top and a bottom mat each need supporting.

A two-way slab with top and bottom steel needs both carried. The top mat rides on taller supports standing off the bottom mat or off the deck, and those are a different product from the bottom bolsters even though the count works out the same way.

The length of vertical form face where cover has to be held off the steel.

Walls, beam sides and slab edges all need the cage held back from the form, and gravity does nothing to help there. Enter zero if the job has no vertical faces requiring spacers.

Centre-to-centre spacing of the spacers along that vertical face.

Closer than the mat supports, usually, because a cage pushed by a vibrator moves easily and a spacer only works where it is. Follow the spacing your specification names, or the supplier's recommendation for the cage weight.

Bar supports needed

140 chairs

Medium confidence

A count on the grid you entered. It does not judge whether the support spacing is adequate — that depends on bar size, mat stiffness and the traffic the mat will take, and it belongs to your supplier's data or your specification.

Support lines along the mat
10 lines
Bars across the mat at this spacing
27 bars
Bars actually carried on each line
14 bars
Chairs per mat
140 chairs
Continuous bolster instead of point chairs
260 ft
Side-form spacers
33 spacers
Mat area supported
1,014 ft²
Supports per unit of mat area
0.14 chairs/ft²
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • CRSI Manual of Standard Practice — bar support types and classes, the practice of carrying a mat on a grid of individual chairs or on continuous bolsters, and the use of side-form spacers to hold cover on vertical faces
  • The support spacing is an input rather than a built-in table because the figure that governs depends on bar size, mat stiffness and whether the mat is walked on. Take it from your bar-support supplier's data or from the spacing your specification names
  • Chair count = (support lines along the mat) x (supported bars across it), which is arithmetic on the grid you enter rather than a published quantity

Inputs used

Mat Length
39 ft
Mat Width
26 ft
Bar Spacing in the Mat
11.75 in
Rated Support Spacing Along the Bar
4 ft
Support Frequency Across the Mat
Every second bar supported
Number of Mats to Support
1
Side-Form Run Needing Spacers
130 ft
Side-Form Spacer Spacing
4 ft

Intermediate steps

Support lines along the mat
10 lines
Bars across the mat at this spacing
27 bars
Bars actually carried on each line
14 bars
Chairs per mat
140 chairs
Continuous bolster instead of point chairs
260 ft
Side-form spacers
33 spacers
Mat area supported
1,014 ft²
Supports per unit of mat area
0.14 chairs/ft²
Final result140 chairs

Confidence note: A count on the grid you entered. It does not judge whether the support spacing is adequate — that depends on bar size, mat stiffness and the traffic the mat will take, and it belongs to your supplier's data or your specification.

What this calculation does not cover

  • No support-spacing table is applied; the spacing is yours to supply and yours to defend.
  • Chair HEIGHT is not calculated. It follows from the specified cover, the bar diameters and the layer order.
  • Sand plates or larger bearing feet may be required on soft subgrade or on a vapour barrier; the count is the same, the product is not.
  • Openings, thickenings and bays that break the mat need counting separately.

Estimated cost — your price

This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.

11.75 in39 ft41 at 11.75 in
Schematic, drawn to the proportions you entered — not to scale on screen.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-02 · in the site-wide review of 2026-09-06 · v1.0.1

Regulatory standards & verification citations3
  1. CRSI Manual of Standard Practice — bar support types and classes, the practice of carrying a mat on a grid of individual chairs or on continuous bolsters, and the use of side-form spacers to hold cover on vertical faces
  2. The support spacing is an input rather than a built-in table because the figure that governs depends on bar size, mat stiffness and whether the mat is walked on. Take it from your bar-support supplier's data or from the spacing your specification names
  3. Chair count = (support lines along the mat) x (supported bars across it), which is arithmetic on the grid you enter rather than a published quantity
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Tools and safety for this job

To fix reinforcement. Generic types, no brands, no prices.

Protection this work requires

  • Saws, grinders and breakers run above 85 dB, where hearing damage accumulates and does not recover: defenders or plugs for every cut, not just the long ones.
  • Breakers and grinders cause permanent nerve damage: limit continuous trigger time, keep hands warm, and stop if fingers tingle or blanch.
  • Boards, blocks and bagged material cause most lasting back injuries on small sites: two people or a lifter for full sheets, and never a bag on one shoulder up a ladder.
  • Nailing, chiselling and cutting all throw fragments: glasses to EN 166 or ANSI Z87.1, and goggles rather than glasses overhead.
Show the 4 tools this job needs

Essential

  • Tape measure

Recommended

  • Rebar cutter and bender

  • Rebar tying tool

Optional

  • Angle grinder

Also needed as materials: cutting and diamond discs, tie wire.

what each concrete tool is for, and the spec that decides which to buy where one does.

Supporting every second bar leaves the mat spanning between lines — fine on a stiff grid, and the reason a light mat shows a wavy cover line in the finished soffit. At 1.49 supports per square metre (0.14 per square foot), the same grid bought as continuous bolster comes to 79.2 m (260 ft) of runner, which on a large pour is usually the faster fix and often the cheaper one.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

Worked example: Concrete driveway replaced — step 7 of 10

How to calculate rebar chair and bolster count in 9 steps

  1. Mat LengthThe longer plan dimension of the reinforcing mat.
  2. Mat WidthThe plan dimension across the direction the support lines run.
  3. Bar Spacing in the MatCentre-to-centre spacing of the bars being supported.
  4. Rated Support Spacing Along the BarHow far apart the supports may sit along a bar, from your supplier's data or your specification.
  5. Support Frequency Across the MatWhether each bar sits on a support or the mat spans between supported bars.
  6. Number of Mats to SupportEnter one for a single layer, two where a top and a bottom mat each need supporting.
  7. Side-Form Run Needing SpacersThe length of vertical form face where cover has to be held off the steel.
  8. Side-Form Spacer SpacingCentre-to-centre spacing of the spacers along that vertical face.
  9. Bar supports neededThe tool computes the bar supports needed from those figures and shows the formula, its sources, and a confidence rating alongside it.

Bar supports needed by mat length

Page defaults, not your figures above.

Mat LengthBar supports needed (chairs)
20 ft84
30 ft112
40 ft154
50 ft182
60 ft224
70 ft252

Frequently asked questions

Why does this ask for the support spacing instead of supplying it?
Because there is no single right answer to supply. The spacing that holds cover depends on bar size, on how stiff the mat is, on whether a crew will walk on it and on what the top layer weighs. Publishing one number would look authoritative and be wrong for most slabs, so the figure comes from your supplier's data or your specification.
When is a continuous bolster better than individual chairs?
On any mat large enough that placing point chairs one at a time becomes the slow part of the day. A bolster carries every bar it crosses at once, spreads its load over a longer bearing line, and is much harder for a boot to knock out of position. Individual chairs earn their place in congested cages and around openings.
Do side-form spacers really need to be that close?
Closer than the mat supports, generally. Nothing holds a cage back from a vertical form except the spacers themselves, and a poker vibrator pushed against the cage will move it between any two of them. The consequence is cover lost on a face where it is visible for the life of the structure.
Does this tell me how tall the chairs should be?
No — only how many. Chair height follows from the specified cover, the diameters of the bars in each layer and the order they are laid in, and getting it right is a separate exercise. A correct count of the wrong height is a mat at the wrong level, which is worse than being short of chairs.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.