Highway Guardrail Post Spacing Calculator
Post count for a W-beam highway guardrail run, at the AASHTO tangent spacing or the tighter spacing a transition calls for.
Computed in your browser — nothing you enter is uploaded. Figures are presented in United States units and terminology, and each formula’s basis is cited under regulatory standards below.
Last verified 2026-08-26 · v1.0.0
Guardrail posts needed
52 posts
Running these inputs gives 52 as the guardrail posts needed. Currently reading for United States — pick a different market above and the figures re-cast accordingly.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Regulatory standards & verification citations
- Post count = ceil(guardrail length ÷ post spacing) + 1, the standard layout method for W-beam guardrail posts, commonly spaced at 6.25 ft (1.905 m) per AASHTO Roadside Design Guide standard post spacing