Trench Sloping & Excavation Width Calculator
Top width and spoil volume for a sloped excavation, at the maximum allowable slope for a soil type a competent person has classified.
Computed in your browser — nothing you enter is uploaded. Figures are presented in United States units and terminology, and each formula’s basis is cited under regulatory standards below.
Last verified 2026-08-27 · v1.1.0
Excavation top width
19.5 ft
Geometry at the tabulated maximum allowable slope for the soil type you selected. It is not a classification, and it is not a protective-system design.
- Setback each side
- 8 ft
- Slope angle from horizontal
- 45 °
- Spoil volume per metre of trench
- 8.55 m³/m
- Extra volume caused by sloping
- 5.95 m³/m
- Top width in feet
- 19.5 ft
- Total bank excavation volume
- 112.44 yd³
Running these inputs gives 19.5 ft as the excavation top width. Top width in feet carries the most weight in this calculation, at 19.5 ft. Expect some drift against the real job; the calculation is solid but conditions on site are not. Currently reading for United States — pick a different market above and the figures re-cast accordingly.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Regulatory standards & verification citations
- OSHA 29 CFR 1926 Subpart P, Appendix B — maximum allowable slopes for excavations less than 20 feet deep: Stable Rock vertical; Type A 3/4:1 (53°); Type B 1:1 (45°); Type C 1½:1 (34°)
- 29 CFR 1926.652 — excavations deeper than 20 feet require a protective system designed by a registered professional engineer
- Soil classification under Appendix A must be performed by a competent person using at least one visual and one manual test