# Strip footing planner

> Give a strip footing its length and depth, and its width on the row, and get the concrete, sub-base, forms and bars with the trench dug for it — for a…

Page: https://craftquantities.com/plan/strip-footing/ (planner). This is the page's Markdown copy; the HTML page is the canonical version.

Plan a strip footing

_Example strip footing: 32.81 ft long, 1.31 ft deep (10 m long, 400 mm deep)._

## Start the footing

Give the footing a length and a depth, and it is drawn here with every figure beside it.

- [From a takeoff Strip footing, then back here.](https://craftquantities.com/build/strip-footing/)

The result: everything the footing needs, in the order of the work.

Quantities only; your own rates; not a structural check.

## The footing

Nothing here is required. Each figure appears as soon as it has what it needs.

Length and depth. The width is the third figure and sits on the concrete row, with the reinforcement, because all three come from the same design drawing.

### Add a strip footing

The footing's length and its depth: concrete, bars and the trench for a footing whose size is already decided. It is never sized here.

## Everything the footing needs

In the order the work is done. No row has a figure yet.

Nothing in this footing is everything the footing needs yet. Choose how a surface is finished, or what else is being done, and its rows appear here.

## Assumptions assumed

Everything the figures above rest on that you did not give, and what they are still waiting for.

Nothing is assumed yet: give the footing its measurements to begin.

The canvas draws this plan with its own objects and lists its own quantity rows for them (the build-up you choose there), not this planner's list.

## My Project

Kept on this device

A strip footing is a long beam of concrete in the ground. Give its length along the centre line and its depth, set its width on the concrete row, and the concrete comes back with its sub-base, the forms that hold it and the bars your design calls for, beside the trench that has to be dug for it. What size it must be is the design's, and this page never decides it.

## How the planner runs

1. Take the footing's length along its centre line, and its depth, from the drawing.
2. Give its width and the bars the design calls for on the concrete row.
3. Say whether the trench is dug as part of the job, and give how deep it goes.
4. Add each run of a footing as a run of its own; corners are counted where the runs meet.
5. Save it to your project with the walls that stand on it.

## Where the figures come from

- [Trench Excavation & Backfill Volume Calculator](https://craftquantities.com/calculators/materials-quantities/trench-excavation-backfill-calculator/)
- [Continuous Footing / Grade Beam Volume Calculator](https://craftquantities.com/calculators/materials-quantities/continuous-footing-grade-beam-calculator/)

## Reading for the decisions

- [Pouring footings and piers](https://craftquantities.com/guides/how-to-pour-footings-and-piers/)
- [Pad footings or a strip footing](https://craftquantities.com/compare/pad-footings-vs-strip-footing/)
- [A frost-protected shallow footing or a deep one](https://craftquantities.com/compare/frost-protected-shallow-vs-deep-footing/)
- [Reading a soil report](https://craftquantities.com/guides/how-to-read-a-soil-report/)
- [Digging without hitting services](https://craftquantities.com/guides/how-to-dig-without-hitting-services/)

## Questions

**How wide and deep should my footing be?**

That is set by the soil, the load on it and the frost depth under the local code — a decision for the building department or an engineer. The page counts the materials for a footing someone has already sized.

**Why is the trench deeper than the footing?**

Because the footing sits on firm ground below the frost line, and the trench goes down to that ground. The trench row asks its own depth rather than reusing the footing's.

**Are the bars counted?**

Yes, when the concrete row is set to bars: the longitudinal bars, the links at the spacing given and the laps, all to the bar size your design names. The page never chooses the bars.

**How are the corners of a footing handled?**

Each straight run is a run here. Measure along the centre lines, and where two runs meet the shared corner is in one of them, not both, so the concrete is not counted twice.

**When the work is a job rather than a room.** Plenty of it never starts from a space — a slab, a roof, a deck, a panel upgrade. Each of those is a [job takeoff](https://craftquantities.com/build/): give it the few figures that job is described by, and every trade in it comes back together, the way the room does here.

---
Source: https://craftquantities.com/plan/strip-footing/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.