# Sanding and Finishing a Timber Floor

> The wear layer is finite and the machine is hired by the day, so the grit sequence, the oil-or-lacquer call and the coat count are all settled first.

Page: https://craftquantities.com/guides/how-to-sand-a-timber-floor/ (trade guide, Flooring). This is the page's Markdown copy; the HTML page is the canonical version.

Published 2026-08-31.

## A Drum Cuts Hardest When It Is Standing Still

The hire counter hands over three things: a machine heavier than whoever came to collect it, a box of abrasive in whatever grits were on the shelf that morning, and a docket saying belts are charged as used. Nothing in that transaction mentions the fact that governs the next two days, which is that a drum sander removes most material when it is not moving. Pause with the drum down while you look at your phone and there is a dished hollow across four boards that no later grit will take out, because every later grit follows the surface it is given.

So the machine is walked, never parked. Start the drum clear of the floor, begin moving, lower it onto a surface already passing underneath, and lift it again before your feet stop at the far wall. Each pass is a straight line the length of the room, overlapping the last by a third to a half of the drum width, with the lifts and drops staggered so their marks do not stack into a ridge. Walking speed is steady and slower than feels natural.

There are gentler machines and it is worth knowing what you gave up by not hiring one. A multi-disc or planetary sander cannot gouge, because no point of it sits still relative to the floor: it will not level a cupped Victorian floor in a weekend, but it will not write a signature into one either. A belt-fed drum will flatten almost anything, which is the same sentence read from the other end. If the floor is broadly flat and you only want the old finish off, the forgiving machine is the correct hire.

## The Floor Has a Budget and Nobody Printed It on the Boards

A twenty-two millimetre board does not give you twenty-two millimetres of sanding. What you own is the timber above the fixings, and on a square-edge floor nailed through its face that is the depth from the surface to the top of the nail heads — a few millimetres, sometimes less where a previous owner drove them home rather than punching them. On tongue-and-groove strip flooring the limit is the tongue: sand into it and the board loses its mechanical connection to its neighbour and starts to lift at the edge under load. Either way the honest number is millimetres, and it is spent once.

Which is why the first job is not sanding at all. Punch every nail below the surface, countersink every screw, then walk the floor slowly in socks feeling for the ones you missed, because you will find more that way than by looking. A single proud head shreds a belt at the price the hire shop charges, and on a bad day tears the abrasive off the drum at speed. Gripper rod comes up with a bar and its nails with it; underlay staples are the tedious half hour nobody budgets.

Old softwood floors have usually been here before, and the evidence is in the fixings — heads sitting flush or slightly proud where two earlier passes came down to meet them. Those boards have also worn hollow in their middles and cupped across their width, so a levelling cut that brings every board into one plane can cost more of the budget than the rest of the weekend put together. That is a decision to make on Saturday morning with a straightedge, not on Saturday afternoon with a machine already running.

Engineered boards change the question completely. The wear layer is whatever the manufacturer laminated on top, it is published in their literature, and on thinner products it will not survive one machine sanding — the sander reaches the ply beneath and the floor is finished, in the wrong sense. Where a micro-bevel runs along each board edge, a full sanding also flattens the bevel on the high boards and leaves it on the low ones, which looks worse than the wear you were removing.

Flat is not the goal either, and pursuing it is how thickness gets wasted. The finish only needs a surface even enough to cure to a consistent film without a scratch pattern breaking across it. An old floor that keeps some of its undulation still looks like an old floor; the same floor taken dead flat has spent much of its remaining life and reads, oddly, as new. Decide how much of the character is deliberate before the coarse belt goes on.

Drawing, What a sanded floor is made of, and how much of it is yours to remove: _A board floor drawn in section from the joists upward: the boards themselves, the finite depth of timber above their fixings that a sanding consumes, the base coat that soaks into what is left, and the finish coats that take the wear._

- **Finish coats**: the layer that actually meets shoes, bought as the rate printed on the tin multiplied by the number of coats in the system ([Epoxy Flooring Coating Coverage Calculator](https://craftquantities.com/calculators/materials-quantities/epoxy-flooring-coverage-calculator/))
- **Base coat**: the coat that soaks into bare timber, sets the colour and decides how much the film bridges the gaps between boards ([Deck Stain Calculator](https://craftquantities.com/calculators/renovation-construction/deck-stain-calculator/))
- **Sanding allowance**: the timber above the nail heads or above the tongue, which is the whole budget for this sanding and every future one
- **Board below the fixings**: structural depth that spans between joists and must stay; replacements are bought in the species and thickness already down ([Flooring Calculator](https://craftquantities.com/calculators/renovation-construction/flooring-calculator/))
- **Joists and the void**: what the boards are nailed to, and the reason a floor sands to a wave rather than a plane where a joist has dropped

## Grit Is a Sequence, Not a Setting

Every grit in the box exists for one reason: to remove the scratch left by the grit before it. That is the whole logic, and it is why skipping a step never saves time. Jump from a coarse levelling grit straight to a fine one and the fine abrasive spends the whole room failing to reach the bottom of scratches it was never sized for, so you make three passes instead of one and still see the coarse marks the moment light starts reflecting off a wet film. The rule that holds on site is to climb the grits in order and never skip more than one grade between one cut and the next, which is why 36, then 50, then 80 is the usual shape of a sequence.

Where you start is a judgement about what is on the floor, not a default. Old paint, bitumen, thick varnish, years of wax polish or genuine cupping needs the coarse end, and wax earns its place on that list because it clogs a fine sheet within minutes; bare, flat boards with nothing left on them may need nothing coarser than a medium grit, and starting coarse there spends the budget from the previous section for no gain. Where you stop is a decision about the finish rather than the wood: a film-forming lacquer wants enough key left to grip and a penetrating oil wants open grain to soak into, so closing the timber down with a very fine abrasive works against both. Finer is not better, and the stopping point is stated in the finish manufacturer's instructions more often than anyone reads it.

1. Punch every nail and countersink every screw, then walk the floor in socks to find the ones you missed by feel.
2. Take the levelling cut first, angled across the boards on a floor that is cupped or stepped, straight along them on one that is already close to plane.
3. Cross back with the next grit along the length of the boards, and stay along them for every pass that follows.
4. Vacuum the floor and the machine between every grit change, because one coarse grain dragged under a fine belt writes a line the length of the room.
5. Bring the edger and the corner scraper up to the same grit the drum has reached before changing either, rather than edging once at the end.
6. Blend the edger's curved scratch into the drum's straight scratch with a hand block or a fine disc while you are still on that grit.

**What each pass through the room is actually taking off**

| Pass | Where it usually starts | What it is there to remove | How you know it is finished |
|---|---|---|---|
| Levelling cut | Coarsest abrasive in the box, run at an angle across the boards on a cupped floor | Cupping, board-to-board steps, old coatings, gripper-rod damage | Every board is being touched along its full length with no untouched grey stripes left |
| First straight cut | One step finer, running along the length of the boards | The angled scratch the levelling cut left, plus the last of the old finish | The diagonal marks have gone everywhere, including under the window and behind the door |
| Intermediate cut | The middle of the range | Its own predecessor's scratch pattern and nothing else | A lamp held at floor level shows scratch running in one direction only |
| Finish cut | Fine enough for the chosen finish and no finer | The last visible machining, leaving the key the coating needs | The surface reads as even and dull rather than polished, all the way to the edges |

This page counts the whole order for one floor: the sealer and the finish coat by coat for the system you choose, the containers they come in, the drum sheets and edger discs for every grit in the sequence, and the pads for abrading between coats. The abrasive life figures are yours to set from the machine and the floor, because no maker publishes them. The page runs [Floor Sanding and Finish Calculator](https://craftquantities.com/calculators/renovation-construction/floor-finish-coverage-calculator/) here.

## The Edge Is Where Floors Get Ruined

The drum reaches to within a hand's span of the wall and no further, so the last two hundred millimetres all the way round the room are done with a disc spinning on a different axis, at a different speed, under a machine light enough to dig. Everything that goes wrong with a domestic sanding job goes wrong in that band. Dwelling in one spot cuts a saucer; tipping the machine cuts an arc; running the edger a grit behind the drum leaves a ring of coarse scratch that the first coat of finish makes obvious from the doorway and impossible to fix without starting again.

Work the edger in small overlapping arcs, keep it moving exactly as you kept the drum moving, and finish each grit at the perimeter before the drum moves on. The junction between the two scratch patterns is a real line and it wants breaking down by hand, with a block of the same abrasive worked along the boards across the last of the arc. Corners, thresholds and the strip under a radiator that no machine reaches are a scraper and a sanding block. On a floor laid to a pattern rather than in straight runs the perimeter problem is a harder one, and the herringbone article covers it.

## The Bag Is Not the Control, and the Rag Sets Fire to Itself

Wood dust is a regulated hazardous substance, not an inconvenience. In Great Britain it falls under the Control of Substances Hazardous to Health Regulations 2002 and carries workplace exposure limits published in HSE EH40/2005, hardwood dust taking the lower of the two figures listed there. The machine's bag is a chip collector, not respiratory protection: what matters is the fraction small enough to stay airborne long after the machine stops, which is why a fit-tested mask, a vacuum of an appropriate filter class and sheeting over doorways all earn their place. Take the bag off outside.

Painted floorboards need a decision before the machine touches them. Where the work is done for compensation in United States housing built before 1978, machine-sanding paint is a prohibited work practice under the EPA's Renovation, Repair and Painting Rule at 40 CFR Part 745 unless the machine has HEPA exhaust control, and the rule brings training and cleaning verification with it. The equivalent United Kingdom duty falls on employers and the self-employed under the Control of Lead at Work Regulations 2002. A householder sanding their own floor sits outside both rules and inside the same dust, which is the point: dry-sanding old paint aerosolises lead across a room people then live in, and it settles into exactly the gaps you are about to seal over.

Under the carpet there may also be things that are not paint. Black bitumen adhesive, thermoplastic tiles and old vinyl sheet have all historically contained asbestos, and a drum sander is the worst possible way to find out. If any of that is present, stop and identify it properly rather than sanding through it — there is a separate article on how that identification works.

The last hazard belongs to the finishing half and it burns down more sheds than floors. Cloths soaked in a drying oil generate heat as the oil cures, and a crumpled pile of them insulates that heat well enough to reach ignition with nothing else involved. The mechanism is documented as self-heating in NFPA 921 Guide for Fire and Explosion Investigations, and the control is trivial: lay used rags out flat and singly to dry, or drown them in water in a sealed metal container. Never leave them heaped in a bag in the room you have just finished.

## What the Floor Is Already Wearing

The finish that comes off tells you what can go on. Decades of wax polish soak into the top of the timber and are not fully removed by sanding, and that residue — along with silicone from furniture polish — is the classic reason a water-based lacquer beads, crawls or dries into small craters on a floor that looked perfect when it was vacuumed. Where a floor has a long history of wax, the safe route is a solvent-borne product, a barrier coat the finish manufacturer names for the purpose, or a test area big enough to prove it before committing the room.

Old shellac and old varnish come off cleanly and tell you little. Bitumen is the difficult one: it softens under the heat of the drum, loads the abrasive within a metre, and turns an expensive belt into a smeared strip in a single pass. Where a floor has bitumen bedding compound on its face, remove it mechanically and cold — scraped, chilled, or taken off with a machine intended for it — before any abrasive goes near, or expect to buy belts by the box.

Meter the timber before the finish is opened. A moisture meter costs less than one tin of floor lacquer and it tells you whether the boards are at the moisture content they will live at, which is the difference between a floor that stays as you left it and one that opens up in the first heating season. Aim at the condition the building will be in when it is in use, heating on. The moisture content bands published by the National Wood Flooring Association and the service classes in EN 1995-1-1 describe what that should look like; the dimensional change coefficient method underneath it is set out in the USDA Forest Products Laboratory Wood Handbook.

## The Gaps, and Why Filling Them Usually Fails

A sanded old floor has gaps, and the temptation to fill them with a slurry of sanding dust and resin binder is almost universal. It works on the day and fails on a schedule, because the gap exists precisely because the boards move: they shrink across the grain as the house dries in winter and swell back in summer, and a hard filler in a moving joint either cracks down its middle or debonds from one edge and lifts out as a strip. A hundred small gaps produce a hundred small failures, all visible.

Where gaps genuinely have to be closed — for draughts, for a floor over an unheated void, or because they are wide enough to lose things down — the durable answer is a sliver of matching timber glued to one edge of the gap only, so the joint still has somewhere to move, and then sanded flush with the rest. It is slow and it lasts. The alternative honest answer is to leave the gaps, treat the draught as an insulation and airtightness problem below the boards rather than a filler problem above them, and let the floor go on behaving like the floor it is.

One more consequence hides in this section and belongs to the finish rather than the filler. A film-forming lacquer that runs down into the gaps glues the board edges to each other, so a floor that would have shrunk into many narrow gaps instead shrinks into a few wide ones that open with a crack. Base coats exist partly to control that side bonding, which is a reason to use the one the system names rather than a topcoat pressed into service.

## Oil or Lacquer Is a Maintenance Decision

The fork is usually presented as a question about appearance, and appearance is the least of it. What separates the two systems is what happens in four years when a chair leg drags or a dog arrives, and the answers are opposite. An oiled floor is repaired locally: clean the area, abrade it, re-oil it, and the repair blends because there is no film edge to feather. A lacquered floor cannot be, because any local coat leaves a visible boundary — so its maintenance is a whole-room operation, screening the existing film and recoating everything before wear reaches bare timber.

That difference drives the rest. Lacquer buys a harder, more chemically resistant, easier-to-clean surface and a longer interval between interventions, at the price that the intervention is a day's work and a room emptied. Oil buys a surface that scratches more readily, needs refreshing more often, and can be done a section at a time by someone with a cloth and an afternoon. A rented flat and a family kitchen do not want the same answer, and neither does a floor whose remaining wear layer is a few millimetres — the argument for lacquer collapses if the floor cannot survive being sanded again.

Where finishes are compared on paper rather than on a floor, the test methods are collected in ASTM D2394 Standard Test Methods for Simulated Service Testing of Wood and Wood-Based Finish Flooring, and no marketing figure means anything unless it names the method behind it. Sheen has one practical consequence: gloss shows every scratch and matt hides most of them. Colour is settled before any finish goes down — a pigmented stain or a coloured oil goes onto bare timber, cannot be undone without sanding back, and takes differently on the sapwood and heartwood of one board.

Two constraints arrive from outside the room. Volatile organic compound content is regulated where the product is sold — in the European Union by Directive 2004/42/EC on the limitation of emissions of volatile organic compounds due to the use of organic solvents in certain paints and varnishes, and in the United States by 40 CFR Part 59 Subpart D, with stricter district rules such as SCAQMD Rule 1113 applying locally — which is much of why water-based floor lacquers displaced solvent-borne ones. In a commercial or common-area installation the finished floor is also part of a system whose reaction to fire is tested to EN ISO 9239-1 and classified to EN 13501-1, which makes the finish a specified item rather than a free choice. Acid-cured lacquers cure by releasing formaldehyde, and there the safety data sheet's ventilation and re-occupancy instructions govern.

## The Lacquer Schedule and What It Actually Drinks

A lacquer system is a base coat and topcoats, and the domestic default is three coats in total. Four is for a hallway, a kitchen or anywhere shoes stay on; two is for somewhere nobody walks. Adding coats does not make a bad surface good — every one of them follows the sanding underneath — but it is the only way of adding film thickness, and film thickness is what wear consumes before it reaches timber.

The first coat behaves differently from the rest and always costs more. Bare, freshly sanded timber has open grain and cut vessel ends that take liquid until they are full, and on a water-based product that same coat raises the grain, standing the fibres up so the floor feels rough the moment it dries. That is expected, and it is dealt with by a light intermediate abrade — a fine screen on a buffer, or a hand pad — then a thorough vacuum and a tack cloth, not by more finish. Every coat after it goes onto a sealed surface and follows the tin much more closely.

Recoat timing is a chemical window, not a convenience. Many water-based lacquers bond to the previous coat chemically inside a stated period and only mechanically after it, so missing the window converts the next coat from a wipe-and-go into an abrade-first job. Two-pack products add a crosslinker with a pot life, and once it is mixed the clock runs whether or not you are ready. Read that page on the Friday, because it decides what time you start on the Sunday.

This is the site's multi-coat coverage engine — area divided by the rate per coat, multiplied by the number of coats — and most floor lacquers sell at somewhere around eight to twelve square metres per litre per coat, comfortably inside the rates it accepts. Enter the figure printed for the product in your hand rather than a typical one, and treat its warning about the substrate drinking more than the rate promises as applying exactly to your first coat on bare timber. The page runs [Epoxy Flooring Coating Coverage Calculator](https://craftquantities.com/calculators/materials-quantities/epoxy-flooring-coverage-calculator/) here.

## Oil Is Measured by What You Take Off Again

An oil finish fails in one direction far more often than the other, and the direction is too much. A hardwax oil is spread extremely thin and worked into the timber with a pad until the surface looks almost dry, with anything left standing on the face removed before it cures. Leave a wet film and it does not become a thicker finish; it becomes a sticky one that stays tacky for weeks, prints every footprint, and has to be cleaned off with the maker's solvent and done again. The instruction that matters on an oil tin is the one about removing the excess.

That is also why an oil job costs so little in material. Modern hardwax oils are quoted in the tens of square metres per litre per coat — Osmo's Polyx-Oil technical literature is the widely cited example — so a whole room can go on out of a tin small enough to carry home in one hand. Traditional penetrating oils on bare softwood are a different proposition: applied flood-and-wipe into open pine the first coat genuinely disappears, and consumption on old boards is several times what the same product uses over a sealed surface.

That thirsty first coat on bare, open softwood is the case the calculator below is calibrated for. It carries a fixed rate of two hundred square feet to the US gallon, roughly five square metres per litre — an exterior deck figure derived from weathered, rough, absorbent boards — and it rounds up to whole containers. On old face-nailed pine sanded to a medium grit and flooded with a penetrating oil that is a defensible buy-this-much number, and its generosity is the point, because running out halfway across a room leaves a lap line you cannot sand out without redoing the floor.

It is the wrong shape for a hardwax oil, and that is worth saying plainly. Against a product rated at four or five times that coverage it will tell you to buy four or five times what you need; for those, the coverage calculator in the previous section fed with the tin's own rate is the correct route.

Enter the floor area and the number of soak-in coats to get a whole-container count at a deliberately thirsty exterior rate — the right shape for a penetrating oil going onto bare, open softwood, and a deliberate over-estimate for anything sold by the tens of square metres per litre. The page runs [Deck Stain Calculator](https://craftquantities.com/calculators/renovation-construction/deck-stain-calculator/) here.

## Four Kinds of Dry, and Only One of Them Means Furniture

The question the whole weekend is really asking is when the room can be used again, and the answer is not on the same page as the number of coats. Data sheets publish several different waiting periods and they permit different things; treating the first one as if it were the last is how a two-day-old floor acquires the permanent outline of a sofa foot. Curing continues long after the surface stops feeling wet, and until it has finished the film is softer than it will ever be again.

So the end of the job runs: ventilate the room and hold it at the temperature the product names, walk on it in socks only when the sheet says you may, put furniture back on felt pads at full cure rather than at foot traffic, and leave rugs until last — a rug over a curing finish traps what is still coming out of it and can print its weave into the floor. Then write down the product, the batch, the coat count and the date, and tape it inside a cupboard door. Whoever screens and recoats this floor in five years needs to know what they are recoating over.

**The waiting periods a finish data sheet publishes, and what each one actually permits**

| What the tin calls it | What has happened by then | What it allows |
|---|---|---|
| Touch dry | Water or solvent has left the top of the film only | Looking at it. Dust settling on the floor now stays in the finish permanently |
| Recoat window | The film is hard enough to take another coat and still open enough to bond to it | The next coat, straight on. Past the window the maker requires abrading first |
| Foot traffic | The film carries weight without printing or marking | Socks, and the first raking-light inspection. Not shoes, not rugs, nothing dragged |
| Full cure | Crosslinking has finished and the film has reached its stated hardness | Furniture on felt pads, rugs down, and washing the floor for the first time |

## What the weekend actually consumes

Machine hire is the visible cost and the smallest one. These are the quantities that decide whether the floor is finished on Sunday evening or half-finished for a fortnight.

- **Abrasive, counted in belts and discs rather than in grits**: Charged as used, and the coarse end goes fastest because it is the pass that meets old paint, gripper rod and the nail you missed. Take more of the first grit than of any other.
- **Finish, at the rate printed for the actual product, times the coats**: Coverage is a property of the product, not of the floor. The first coat onto bare timber will beat the printed rate, and every coat after it will not.
- **Base coat as its own line**: Most lacquer systems name a base coat that is not the topcoat thinned; substituting one changes side bonding and colour, and the maker's schedule is what any warranty is written against.
- **Replacement boards in the species and thickness already down**: Order before sanding rather than after, so the new boards take the same passes as the rest of the floor and finish to the same colour.
- **Containment, filters and disposal**: Sheeting, tape, vacuum bags and mask filters are consumables on this job. Oil-soaked cloth is a separate disposal problem and never a bin liner.
- **The perimeter gap and whatever covers it**: Skirting off or scotia on is settled before the first coat, because the finish has to run under whatever ends up covering the edge of the floor.

Calculators for these quantities: [Epoxy Flooring Coating Coverage Calculator](https://craftquantities.com/calculators/materials-quantities/epoxy-flooring-coverage-calculator/), [Floor Sanding and Finish Calculator](https://craftquantities.com/calculators/renovation-construction/floor-finish-coverage-calculator/), [Deck Stain Calculator](https://craftquantities.com/calculators/renovation-construction/deck-stain-calculator/), [Flooring Calculator](https://craftquantities.com/calculators/renovation-construction/flooring-calculator/).

## Calculators this guide uses

- [Floor Sanding and Finish Calculator](https://craftquantities.com/calculators/renovation-construction/floor-finish-coverage-calculator/)
- [Epoxy Flooring Coating Coverage Calculator](https://craftquantities.com/calculators/materials-quantities/epoxy-flooring-coverage-calculator/)
- [Deck Stain Calculator](https://craftquantities.com/calculators/renovation-construction/deck-stain-calculator/)
- [Timber Cross-Grain Shrinkage Calculator](https://craftquantities.com/calculators/materials-quantities/timber-cross-grain-shrinkage-calculator/)
- [Flooring Calculator](https://craftquantities.com/calculators/renovation-construction/flooring-calculator/)
- [Floor Transition Strip Calculator](https://craftquantities.com/calculators/materials-quantities/floor-transition-strip-calculator/)
- [Board Feet Calculator](https://craftquantities.com/calculators/measurements-conversions/board-feet-calculator/)

## See also

- [Laying a Herringbone Floor and Trimming It Out](https://craftquantities.com/guides/how-to-lay-a-herringbone-floor/)
- [Checking a Pre-2000 House Before You Strip It Out](https://craftquantities.com/guides/how-to-check-a-house-for-asbestos/)
- [Insulating a Suspended Timber Ground Floor](https://craftquantities.com/guides/how-to-insulate-a-suspended-timber-floor/)
- [Estimating Coatings for Block Walls and Timber Fences](https://craftquantities.com/guides/how-to-estimate-coating-coverage/)

## Sources

- USDA Forest Products Laboratory, Wood Handbook — Wood as an Engineering Material (General Technical Report FPL-GTR-190)
- National Wood Flooring Association, Wood Flooring Installation Guidelines and Methods
- BS 8201 Code of practice for installing flooring of wood and wood-based panels
- EN 1995-1-1 (Eurocode 5) service classes, for the moisture content a floor will settle to in service
- ASTM D2394 Standard Test Methods for Simulated Service Testing of Wood and Wood-Based Finish Flooring
- EN ISO 9239-1 Reaction to fire tests for floorings — Part 1: Determination of the burning behaviour using a radiant heat source
- EN 13501-1 Fire classification of construction products and building elements — Part 1: Classification using data from reaction to fire tests
- Directive 2004/42/EC on the limitation of emissions of volatile organic compounds due to the use of organic solvents in certain paints and varnishes
- 40 CFR Part 59 Subpart D, National Volatile Organic Compound Emission Standards for Architectural Coatings, and SCAQMD Rule 1113 Architectural Coatings
- 40 CFR Part 745, EPA Renovation, Repair and Painting Rule (lead-safe work practices in pre-1978 housing)
- Control of Lead at Work Regulations 2002
- Control of Substances Hazardous to Health Regulations 2002, with workplace exposure limits published in HSE EH40/2005
- NFPA 921 Guide for Fire and Explosion Investigations, on the self-heating of oil-soaked materials
- Osmo Polyx-Oil technical data sheet, as the commonly cited coverage figure for a hardwax oil
- Finish manufacturers' technical data sheets and safety data sheets, which govern coverage rate, recoat window, cure schedule and re-occupancy for any specific product

---
Source: https://craftquantities.com/guides/how-to-sand-a-timber-floor/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.