# Overboarding or Taking Down a Lath and Plaster Ceiling

> Two answers to a bowing Victorian ceiling — board over it or take it out — and the screw length, dust and container size that decide which.

Page: https://craftquantities.com/guides/how-to-replace-a-lath-and-plaster-ceiling/ (trade guide, Interiors). This is the page's Markdown copy; the HTML page is the canonical version.

Published 2026-08-31.

## Push Up on It With a Flat Hand

The front bedroom of an 1897 terrace had a shallow dish in the ceiling, maybe 15 mm across a 3.4 m span, and the owner had long since stopped seeing it. What changed her mind was a hairline that opened around the rose one January and had closed again by June. Two tradesmen looked at it in the same week. One priced screwing 12.5 mm board over the lot and skimming it; the other priced taking it all out, and mentioned that the pipe run above would be worth doing while it was open. They were describing two different ceilings, and only one of them was in that room.

A lath and plaster ceiling is held up by an interlock, not by adhesion. Softwood laths — riven and tapered in older work, sawn and more even by the 1930s — are nailed across the joists with a six to ten millimetre gap between them. The first coat, haired and pressed up hard, squeezes through those gaps and slumps over the back of the lath as it sets. Each slumped lump is a key, and a ceiling is carried by a few thousand of them together. The float and setting coats below add stiffness and a surface; they hang from nothing.

The failure is always the same one. Keys shear off — timber shrinkage, a century of slammed doors and footfall above, a leak, a plumber kneeling between the joists — and the slab starts hanging on friction and paint. It dishes, then cracks, then one day a panel of it lands on the bed. Push up with a flat palm, not fingertips, and feel whether the plaster moves independently of the lath. Tap across it and listen for the change from solid to hollow. Then get above it: lift a board in the room over, or take a torch into the loft and hold the beam almost flat along the lath. You will see either a forest of intact keys or a bed of broken crumbs lying on the back of the ceiling — the ceiling's own debris, and the most honest evidence there is.

Drawing, What is above the paint: _A Victorian ceiling being overboarded, seen in section: the joists at the top, the laths nailed across them, the lime plaster whose keys hook over those laths, the new board screwed through the whole lot, and the skim that closes it._

- **Ceiling joists**: hand-set at roughly 400 mm and rarely at exactly 400 mm, and on an upper floor usually carrying the floor above as well as the ceiling below ([Ceiling Joist Spanning Lineal Lumber Aggregator](https://craftquantities.com/calculators/materials-quantities/ceiling-joist-linear-footage-calculator/))
- **Timber laths**: nailed across the joists with a deliberate gap between them; if these are still tight the ceiling can be boarded over, and if they are loose it cannot
- **Lime plaster and its keys**: the first coat squeezed through the lath gaps and set over the back of them; when those hooks shear off the slab is hanging on friction alone ([Demolition Bulk Volume Swell Calculator](https://craftquantities.com/calculators/materials-quantities/demolition-bulk-volume-swell-calculator/))
- **New plasterboard**: screwed through the old plaster and lath into the joists, which is why the fastener is far longer here than on any other ceiling in the house ([Ceiling Plasterboard Calculator (Gypsum Board Sheets)](https://craftquantities.com/calculators/materials-quantities/ceiling-plasterboard-sheet-calculator/))
- **Skim finish**: two millimetres of gypsum finish plaster that closes the joints and takes the paint, and that copies the plane beneath it exactly ([Gypsum Plaster Finish Coat Volume Calculator](https://craftquantities.com/calculators/materials-quantities/plaster-finish-coat-calculator/))

## Two Routes, and What Chooses Between Them

The first question people ask is which route is cheaper, and it is the wrong one, because the two are not alternatives for the same ceiling. Overboarding hands the whole weight of the old ceiling to the screws you drive, and through them to the lath nails and the joists. Where the laths are still gripped hard and only the keys have gone, that is a genuine structural repair: the new board becomes what carries the old slab. Where the laths have worked loose or the nails have rusted away, it is fastening a new ceiling to a failing one.

The second limit surprises homeowners, so it is worth saying flatly: overboarding does not straighten anything. The board is drawn tight to whatever plane it finds and takes that plane with it. A 15 mm dish stays a 15 mm dish, now finished immaculately and lit by a pendant hanging out of the middle of it. If the bow is the complaint, either the ceiling comes down or battens go up first, packed to a laser line — and battens make the screw length problem in the next section worse rather than better.

Then the things that have nothing to do with structure. A run cornice or a moulded centre rose is buried by 12.5 mm plus skim: the top member disappears, the rose loses a third of its relief, and the room's proportions change in a way nobody can name and everybody notices. Board up to the cornice, or take the ceiling down. Head height at a door lining matters in a 1930s house as it never does in a Victorian one. And a cold loft with 50 mm of 1970s mineral wool in it turns demolition into cheap access.

Weigh the disruption honestly, because it is the real difference. Overboarding a bedroom is a day and a half for two people, no container, the room usable that evening. Taking the same ceiling out is three to five days, a container in the street, and a dust event that reaches the rest of the house. The extra days buy access; if you have no use for it, they buy nothing.

**What tips the decision one way or the other, and what to check it against**

| What you find | Which route that points to | Where the check comes from |
|---|---|---|
| Laths tight to the joists, keys failed over most of the ceiling | Overboarding is a genuine repair — the new board carries the old slab | Flat-palm push from below, plus a torch along the lath from above |
| Laths springy, split, or nails rusted out of the joist face | Take it down; screws into failing lath fix nothing | Movement of the lath itself, not just of the plaster on it |
| Run cornice or a moulded centre rose you intend to keep | Board up to it, or take the ceiling down — never board over it | Measure the cornice projection and the depth of the rose relief |
| Any textured coating whose date you cannot establish | Nothing at all happens until it has been sampled | Control of Asbestos Regulations 2012; OSHA 29 CFR 1926.1101 |
| Listed building, or plaster of demonstrable historic interest | Consent may be required before the plaster is touched | Planning (Listed Buildings and Conservation Areas) Act 1990 |
| Cold roof space above with thin or no insulation | Removal buys access you will not get again cheaply | The thermal element provisions of Approved Document L |
| Ceiling forms part of a fire-separating floor in a flat or a loft conversion | The tested assembly governs, not the board thickness | Approved Document B and the listed assembly named in the specification |

## Nothing Is Disturbed Until the Coating Has Been Tested

Overboarding is often sold as the option that leaves the old ceiling undisturbed. It does not. It drives several hundred screws through it, and if there is a textured coating up there, every one of them is a small drilling operation into a material of unknown composition. This gate applies to both routes and comes before everything else here.

In the United Kingdom, textured coatings applied before the 1999 prohibition on chrysotile can contain asbestos, and a stippled ceiling in a house of this age is exactly the material that historically did. Work on it falls under the Control of Asbestos Regulations 2012, with the Health and Safety Executive's Asbestos Essentials task sheets setting out the controlled methods. In the United States, OSHA's construction asbestos standard at 29 CFR 1926.1101 treats surfacing material in buildings constructed no later than 1980 as presumed asbestos-containing unless sampling shows otherwise.

Lead is the second gate and easier to forget because it is invisible. A ceiling of this age has been painted a dozen times and the early coats are the ones that matter. In the United States, disturbing painted surfaces in pre-1978 housing falls under the EPA's Renovation, Repair and Painting Rule at 40 CFR Part 745 Subpart E — certified firm, contained work area, specified cleaning; in the United Kingdom the Control of Lead at Work Regulations 2002 apply. Dry sanding is the most efficient way there is to put old paint into the air of a house people sleep in.

The third thing in the void is not a regulated hazard but will still stop the job. A century of chimney soot, coal dust, mortar droppings and rodent debris sits on the back of the laths and comes down as one event the moment the plaster does. On a top-floor ceiling that void is the roof space, where in the United Kingdom bats and their roosts are protected under the Wildlife and Countryside Act 1981 and the Conservation of Habitats and Species Regulations 2017: evidence of a roost halts the work until a licensed ecologist has been.

## Everything the Screw Has to Cross

This is the arithmetic that quietly kills a lot of overboarding quotes, and it belongs on the back of an envelope before anyone agrees a price. A 12.5 mm sheet over 20 mm of old plaster over 8 mm of lath is a little over 40 mm of material before the point has touched timber. On top of that sits the bite into the joist the fastener requires — ASTM C840 and the Gypsum Association's GA-216 state a minimum penetration into wood framing for single-layer work, commonly given as 5/8 in (16 mm), while the British and European systems publish their own figures for their own screws. That modest example already totals 56 mm, and a 15 mm board over 30 mm of plaster passes 70 mm — either of which is where a collated screwgun stops being able to help you.

Measure the old ceiling rather than assuming it. Take the cover off the rose and measure at the cable hole, or pull a downlight and measure at the cut edge, and do it in more than one place: hand-floated work is thicker at the edges of a room than in the middle, and thicker again over a patch.

Head profile is not a detail here. A board screw has a bugle head that sinks into the paper face and stops; a countersunk timber screw keeps going and punches through, at which point the fastener holds nothing but gypsum core. Long board screws exist for multi-layer work and are what this job wants — coarse thread, in the length the stack-up demands.

Then the layer in the middle, which is why overboarded ceilings loosen. The screw is not clamping the board to the joist; it is clamping it to a brittle crust of century-old plaster, and that crust crushes. Drive hard and you excavate a crater around the head, the board never pulls tight, and the fixing goes slack within a season. Set the depth stop light and drive to just-tight.

All of which changes how you count. On a bare joist ceiling you can separate a perimeter spacing from a field spacing, because you know where the sheet edges land. Overboarding, every screw has to find a hand-set joist through the twenty-eight-odd millimetres of opaque old ceiling in front of it, and the edges land where the joists allow, so the practical answer is a uniform grid at the closest centres the board will accept. Count it the way you are going to fix it.

**The four thicknesses a single overboarding screw has to add up**

| What the screw crosses | How the figure is established | Why it moves |
|---|---|---|
| New board | 9.5, 12.5 or 15 mm, chosen against the joist centres you actually measured | The board maker publishes a maximum framing centre for each thickness on ceilings |
| Old plaster below the lath line | Measured at the rose, a downlight or a service hole — never assumed | Hand-floated work varies across one room, and patches vary again |
| The laths themselves | Measured at the same opening | Riven lath is tapered and is not a single thickness |
| Bite into the joist | The minimum stated for the fastener being used | ASTM C840 and GA-216 in North America; the system manual for UK and European board |
| The total | Sum of the four, rounded up to a length your merchant actually stocks | Collated guns run out of capacity long before long board screws run out of length |

Enter the ceiling area and the grid you have settled on: overboarding is counted as one uniform pattern rather than as edges and field, because the sheet edges land wherever the old joists put them. The page runs [Drywall Ceiling Screw Count Calculator (Fastening Schedule)](https://craftquantities.com/calculators/materials-quantities/drywall-ceiling-fastening-calculator/) here.

## Board Over a Surface You Cannot See Behind

Finding the joists is the first hour and it defeats anyone expecting a detector to do it. A magnetic finder lights up on the lath nails, and there are hundreds of those at thirty-odd millimetre intervals across the whole ceiling. Establish one joist properly — a fine pilot hole probed until it goes solid, or a patch of skim scraped back until the nail line reads — then step off from it, confirming every line rather than laying them out with a tape. These joists were set by hand and are genuinely irregular.

Snap chalk lines on those centres, then carry each mark down onto the wall a few centimetres below the ceiling line. The moment the first sheet goes up every line you drew is invisible, and the marks on the wall are what keep you hitting timber for the rest of the day.

Run the sheets across the joists and cut them so the ends land on timber. That is where the waste allowance goes: on a new build you work in whole sheets, and here you cut nearly every one to a measured length to chase joists set out by a man with a folding rule in 1897. Fifteen per cent is realistic rather than generous.

Before ordering, count what has to come down by the thickness of the board plus the skim: every downlight, the rose plate, the smoke alarm base, the loft hatch lining. Each is a hole cut in a new sheet and a return visit by whoever owns that trade.

1. Prove dead every circuit feeding a fitting in that ceiling before a screw is driven.
2. Establish one joist by probe or scrape, then confirm each of the others individually.
3. Snap the joist lines and transfer every one onto the wall below the ceiling line.
4. Set the sheets across the joists, cut ends onto timber and staggered between rows.
5. Fix from the middle of each sheet outward, and stop the gun the moment it is tight.
6. Cut back to the cornice line rather than running board over it.

Take the sheet count off the measured ceiling area with a waste allowance that reflects cutting nearly every sheet to a joist you did not set out — this same count is what the fastening grid above gets multiplied against. The page runs [Ceiling Plasterboard Calculator (Gypsum Board Sheets)](https://craftquantities.com/calculators/materials-quantities/ceiling-plasterboard-sheet-calculator/) here.

## Bringing It Down Without Losing the House to Dust

If the decision goes the other way, the first day is containment rather than demolition. Clear the room, sheet or lift the floor, seal the doorway with a zipped screen rather than a sheet and a nail, tape the loft hatch, and put an extractor in the window. On the top floor the void you are about to open connects to the roof space and therefore to every other ceiling on that floor.

Two methods, and they produce different waste. Working the plaster off first with a wide scraper, from a corner and along the run of the laths, leaves the laths standing to be levered off afterwards joist by joist — two separate streams, mineral arisings and clean timber, which is worth having when it comes to the container. Taking plaster and lath down together in sections is faster and leaves one mixed heap nobody will recycle. On a small room the mixed method is defensible; on a whole floor it is not.

Then the quantity, which almost everybody gets wrong in the same direction. In place the ceiling is a thin slab: sixteen square metres at a combined twenty-eight millimetres is just under half a cubic metre, which sounds like five or six barrow loads. Broken up it is nothing of the sort — fractured plaster carries voids and laths tangle rather than stack.

One honest caveat about the arithmetic. The swell factors published in the demolition estimating literature, and therefore the ones the calculator offers, are for concrete, block, brick and stone, because those are the materials the literature covers. There is no consensus swell factor for lath and plaster and this site will not invent one. Run it at the highest listed factor, treat the answer as a floor rather than a forecast, and correct it against the first container you actually fill.

1. Settle any textured coating question before the first tool touches the ceiling.
2. Empty the room, protect or lift the floor, seal the doorway with a zipped screen.
3. Prove the lighting circuit dead at the rose, not at the consumer unit — the drops are stapled to the joists.
4. Strip the plaster first, corner outward along the lath run, keeping the mineral waste separate.
5. Lever the laths off joist by joist, drawing or punching the old nails as you go.
6. Vacuum the joist tops and the wall plate before anything new is offered up.

Turn the in-place slab into the loose heap you have to move, and read the answer as a lower bound: the listed factors are masonry conventions, and lath in the mix bulks beyond them. The page runs [Demolition Bulk Volume Swell Calculator](https://craftquantities.com/calculators/materials-quantities/demolition-bulk-volume-swell-calculator/) here.

## The Container Fills by Volume and Fails by Weight

There are two ways to get the container wrong and they pull in opposite directions. Order for loose volume alone and a mixed heap of plaster arisings can reach the weight limit at half full — a container you have paid for and cannot legally have collected. Order for weight alone and the laths, which weigh almost nothing and stack almost not at all, fill the box before the tonnage is anywhere near. Check the volume and the weight limit as two separate constraints and take whichever binds first.

Access decides more than size in a terrace. No driveway means the container stands on the highway, which in the United Kingdom needs a permit from the highway authority together with lighting and markings, and in many streets means no container at all. The fallback is bulk bags handed through the house, and that changes the arithmetic completely: a bag rated for a tonne fills with plaster arisings long before it reaches one, and an overfilled bag is one the crane will refuse. Settle this before the ceiling comes down — a heap on a bedroom floor is a concentrated load on a floor designed for furniture.

Put the loose volume from the previous section in and check it against the weight limit as well: on this waste stream the two constraints bind at different fill levels, and the binding one is not always the one you expected. The page runs [Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/) here.

## The New Offcuts Are a Different Stream Entirely

Whatever route the ceiling took, boarding it produces a second waste stream that must not be tipped in with the first. Gypsum in anaerobic landfill can generate hydrogen sulphide, which is why board waste is separated from biodegradable waste — in England and Wales the regime derives from the Landfill (England and Wales) Regulations 2002, and comparable restrictions apply elsewhere. Clean offcuts are also genuinely recyclable back into new board.

Board waste is light and extremely bulky, so the conversion between volume and tonnage is what tells you whether the second container is a container at all or two bags in the front garden. Be clear about what that density describes: broken plasterboard offcuts, not the material that came off the ceiling. Old plaster bonded to timber lath is contaminated as far as any recycler is concerned, and quoting both streams as one number misjudges the disposal twice over.

Convert the offcut volume from the boarding into tonnage for the segregated container, and keep the figure apart from the strip-out arisings, which are a different material with a different destination. The page runs [Gypsum Waste Cubic Yards to Tons Calculator](https://craftquantities.com/calculators/materials-quantities/gypsum-waste-cubic-yards-to-tons-calculator/) here.

## The Joists You Can Finally See

The first hour after a ceiling comes down is the most informative of the job. You find the joist notched half its depth for a 1970s heating flow and return, the one cut clean through for a soil pipe and never trimmed, the split running back from a bearing, and occasionally beetle damage where joist ends sit in damp external masonry. None of it was visible an hour earlier and all of it was there.

The second thing you find is that they are not in a plane. Joists set out by hand and loaded for a century sit at different levels, and boarding straight onto them reproduces the undulation you just paid to demolish. The fix is a grid of battens run across the joists and packed to a laser line: it straightens the ceiling, gives a service void above the board, and lets you fix at whatever spacing the board wants. That grid is arithmetically identical to the joists themselves — members at a chosen spacing along the room, each spanning its width — so new joists, sistering members and levelling battens are all one count and one total length of timber.

Load deserves its own paragraph, because the ceiling is about to get heavier. Board, battens, insulation between, and anything laid over the joists in the loft all add permanent load, which is governed by BS EN 1991-1-1 in Europe and ASCE/SEI 7 in the United States. A ceiling joist of this age is often also the floor joist of the room above, sized by eye rather than by a table. If anything looks doubtful — a notch through the middle third, a visible sag, a crushed bearing — that is a structural engineer's call, not a boarding decision.

Everything else that wants doing above a ceiling wants doing now: insulation, the cable route for the lighting you actually want rather than the one you inherited, the pipework that has been weeping for a decade. In England, taking the ceiling off a cold roof space also brings the thermal element provisions of Approved Document L into view — read the current edition, because both the trigger and the target performance have moved more than once.

Room length, room width and the spacing you have chosen give the total run of timber, whether the members are new joists or the levelling battens that put the ceiling back into one plane. The page runs [Ceiling Joist Spanning Lineal Lumber Aggregator](https://craftquantities.com/calculators/materials-quantities/ceiling-joist-linear-footage-calculator/) here.

## Board Straight Onto Timber

With the old ceiling gone the fixing is ordinary again. The screw crosses the board and a known depth of timber, so its length comes off the board thickness and the required bite rather than off a measured stack of unknowns. Sheet edges can be planned onto framing, which means perimeter and field fastening are two different spacings once more, and the honest way to count them is per sheet and then multiplied by the sheets going up.

Provide timber behind every cut end: sheets across the joists or battens, ends staggered between rows, a noggin at every square end. On a room whose walls are staying, the ceiling perimeter lands on old wall plaster that is neither flat nor square — leave the sheet a little short rather than forcing it. Keep fasteners back from the sheet edges by the distance the board standard states, and drive them to a firm dimple with the paper face intact.

Sheet size, the perimeter spacing, the field spacing and the sheet count give the screw count for the reboarded route, where edges and field genuinely differ because you decided where the edges land. The page runs [Drywall Screw Count Calculator (Field + Perimeter Spacing)](https://craftquantities.com/calculators/materials-quantities/drywall-screw-count-calculator/) here.

## Joints on a Plane That Was Never Flat

Two factory-tapered long edges meeting each other are an easy joint; that is what the recess is for. The cut ends are not, and this job produces more of them than a new build does, because sheets were cut to chase joists rather than run out to their full length. With a repaired plane behind them, the jointing here consumes more per square metre than the same area of new work.

Order against the area at the full multi-coat rate rather than pricing off a count of joints. The published coverage figure covers a whole board area finished to a complete taped system and already assumes a normal density of joints. Where a ceiling like this outruns it is in local filling — the low spot over a batten that needed one more pack, the shallow step where two sheet ends met over a twisted joist.

The junction between the new ceiling and the old wall plaster deserves a decision rather than a default. Scrim and fill it and you have a rigid line between two materials with different movement, which cracks in the first heating season about as often as not. A shadow gap or a flexible sealant line can move without telling anybody, and on a ceiling rebuilt inside walls that have stood since 1897 the flexible answer is the honest one.

Price the jointing against the boarded area at the full three-coat rate rather than against a joint count, because the extra material on this work goes into local filling rather than into the joints themselves. The page runs [Drywall Joint Compound Calculator](https://craftquantities.com/calculators/renovation-construction/drywall-joint-compound-calculator/) here.

## Two Millimetres That Cannot Straighten Anything

There are two ways to finish a boarded ceiling and they are regional habits rather than right and wrong answers. British practice skims the whole surface in gypsum finish plaster, giving a monolithic face with no joint anywhere to photograph through the paint. North American practice tapes and coats the joints and paints the paper, which is faster and leaves joints disguised rather than eliminated. The skim route is what the application standards for gypsum veneer plaster cover — ASTM C843 for the plaster and ASTM C844 for the base it goes on — while in Europe the material and its application sit under BS EN 13279-1 and BS 8481.

A skim is two to three millimetres in two passes and it is not a levelling coat. It follows the board with great fidelity: it will not pull a bowed ceiling flat, it will not bridge a step between sheet ends, and over a step it produces a hard edge that catches the light rather than a soft one that does not. Everything flat about a finished ceiling was decided by the battens, the fixing and the sheet layout. The skim only reports on them.

The base has to be right for the plaster to work at all. A board that has been rained on, one fixed with proud screw heads, a surface dusty from cutting — each produces crazing or a blown patch that has to be cut out later. Get the volume before mixing rather than after: it is a small quantity with a short working life, and the way a first skim goes wrong is almost never the arithmetic and almost always a bucket that stiffened while somebody was still working the far corner.

Ceiling area and the applied thickness give the volume of finish plaster for the skim, which is the last chance to buy the right amount of a material that will not wait while you go back to the merchant. The page runs [Gypsum Plaster Finish Coat Volume Calculator](https://craftquantities.com/calculators/materials-quantities/plaster-finish-coat-calculator/) here.

## The order the decisions actually get made in

The workspace opens on a 16 m² bedroom ceiling at a fifteen per cent waste allowance. Change the area to your own room, then work down the list — the first three items decide which half of this article applies to you.

- **Coating sampled, or established as post-ban**: Applies to both routes. Overboarding drives hundreds of screws through the surface, which is a disturbance whatever the quote calls it.
- **Laths tested, from below and from above**: Plaster moving on sound lath can be boarded over. Lath moving on the joists cannot, and nothing you screw to it will change that.
- **Cornice, rose and door head measured**: Board plus skim buries the top of a run cornice and shortens the head clearance; both are irreversible once the room is finished.
- **Old plaster and lath thickness measured in three places**: Taken at the rose or a downlight. This is the number the screw length is built on, and it varies across one room.
- **Screw length totalled and rounded to a stocked size**: Board, plus plaster, plus lath, plus the bite the standard or the system manual requires — then check a collated gun will actually take it.
- **Container decided against volume and weight both**: Strip-out arisings hit the two limits at different fill levels; highway access may decide the whole question before either does.
- **Board offcuts kept as a separate stream**: Clean gypsum is segregated and recyclable; plaster bonded to lath is neither, and mixing them forfeits both.

Calculators for these quantities: [Ceiling Plasterboard Calculator (Gypsum Board Sheets)](https://craftquantities.com/calculators/materials-quantities/ceiling-plasterboard-sheet-calculator/), [Drywall Ceiling Screw Count Calculator (Fastening Schedule)](https://craftquantities.com/calculators/materials-quantities/drywall-ceiling-fastening-calculator/), [Demolition Bulk Volume Swell Calculator](https://craftquantities.com/calculators/materials-quantities/demolition-bulk-volume-swell-calculator/), [Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/), [Gypsum Plaster Finish Coat Volume Calculator](https://craftquantities.com/calculators/materials-quantities/plaster-finish-coat-calculator/).

## Calculators this guide uses

- [Drywall Ceiling Screw Count Calculator (Fastening Schedule)](https://craftquantities.com/calculators/materials-quantities/drywall-ceiling-fastening-calculator/)
- [Ceiling Plasterboard Calculator (Gypsum Board Sheets)](https://craftquantities.com/calculators/materials-quantities/ceiling-plasterboard-sheet-calculator/)
- [Demolition Bulk Volume Swell Calculator](https://craftquantities.com/calculators/materials-quantities/demolition-bulk-volume-swell-calculator/)
- [Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/)
- [Gypsum Waste Cubic Yards to Tons Calculator](https://craftquantities.com/calculators/materials-quantities/gypsum-waste-cubic-yards-to-tons-calculator/)
- [Ceiling Joist Spanning Lineal Lumber Aggregator](https://craftquantities.com/calculators/materials-quantities/ceiling-joist-linear-footage-calculator/)
- [Drywall Screw Count Calculator (Field + Perimeter Spacing)](https://craftquantities.com/calculators/materials-quantities/drywall-screw-count-calculator/)
- [Drywall Joint Compound Calculator](https://craftquantities.com/calculators/renovation-construction/drywall-joint-compound-calculator/)
- [Gypsum Plaster Finish Coat Volume Calculator](https://craftquantities.com/calculators/materials-quantities/plaster-finish-coat-calculator/)
- [Asbestos Enclosure Negative-Pressure Airflow Calculator](https://craftquantities.com/calculators/materials-quantities/asbestos-negative-pressure-cfm-calculator/)
- [Demolition Debris Weight-to-Volume Conversion Calculator](https://craftquantities.com/calculators/materials-quantities/debris-weight-volume-conversion-calculator/)
- [C&D Debris Recycling Diversion Rate Calculator](https://craftquantities.com/calculators/sustainability-compliance/cd-debris-diversion-rate-calculator/)
- [Dumpster/Container Rental Duration Cost Calculator](https://craftquantities.com/calculators/materials-quantities/dumpster-rental-cost-calculator/)
- [Insulation Batt Calculator](https://craftquantities.com/calculators/insulation-efficiency/insulation-batt-calculator/)
- [Attic Insulation Upgrade Calculator](https://craftquantities.com/calculators/insulation-efficiency/attic-insulation-upgrade-calculator/)

## Sources

- ASTM C840 — Standard Specification for Application and Finishing of Gypsum Board
- Gypsum Association GA-216 — Application and Finishing of Gypsum Panel Products
- ASTM C1002 — Standard Specification for Steel Self-Piercing Tapping Screws for Application of Gypsum Panel Products or Metal Plaster Bases
- ASTM C1396 — Standard Specification for Gypsum Board
- ASTM C843 — Standard Specification for Application of Gypsum Veneer Plaster
- ASTM C844 — Standard Specification for Application of Gypsum Base to Receive Gypsum Veneer Plaster
- BS EN 13279-1 — Gypsum binders and gypsum plasters: definitions and requirements
- BS 8481 — Design, preparation and application of internal gypsum, cement, cement and lime plastering systems
- BS EN 1991-1-1 — Eurocode 1: Actions on structures. General actions: densities, self-weight, imposed loads for buildings
- ASCE/SEI 7 — Minimum Design Loads and Associated Criteria for Buildings and Other Structures
- Control of Asbestos Regulations 2012 (United Kingdom), with HSE Asbestos Essentials task guidance sheets
- OSHA 29 CFR 1926.1101 — Asbestos (construction)
- US EPA Renovation, Repair and Painting Rule — 40 CFR Part 745 Subpart E
- Control of Lead at Work Regulations 2002 (United Kingdom)
- The Building Regulations 2010 (England), Approved Document B (Fire safety) and Approved Document L (Conservation of fuel and power)
- Planning (Listed Buildings and Conservation Areas) Act 1990
- Historic England, Practical Building Conservation: Mortars, Renders and Plasters
- SPAB (Society for the Protection of Ancient Buildings) Technical Advice Notes
- Wildlife and Countryside Act 1981 and the Conservation of Habitats and Species Regulations 2017
- The Landfill (England and Wales) Regulations 2002, as amended — segregation of gypsum from biodegradable waste
- British Gypsum, The White Book — system selection and installation literature

---
Source: https://craftquantities.com/guides/how-to-replace-a-lath-and-plaster-ceiling/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.