# Deciding Whether a Cavity Wall Should Be Filled

> The suitability survey takes twenty minutes and cannot be undone: what disqualifies a cavity wall from being filled, and what to do if it already was.

Page: https://craftquantities.com/guides/how-to-decide-if-a-cavity-can-be-filled/ (trade guide, Insulation). This is the page's Markdown copy; the HTML page is the canonical version.

Published 2026-08-31.

## Twenty Minutes on a Ladder, and the Wall Is Committed

A cavity fill is sold as a morning's work, and very nearly is. Two operatives, a drill, a hopper, a hose, a pattern of holes through the perpends, an hour of blowing, and a bag of matching mortar to make the holes good. Everything that decides whether the job was a good idea happens before that, usually inside twenty minutes, sometimes without a ladder coming off the van, and it produces one word on a form: suitable. The borescope images are rarely kept. The survey sheet rarely leaves the installer's system. And unlike nearly every other measure sold into an occupied house, this one does not reverse by undoing the steps — a fill that turns out to be wrong comes out by taking bricks out of the elevation, vacuuming through the hole, and rebuilding.

Two people arrive at this decision from opposite directions. One has a quote and a scheme paying most of it, and wants to know whether the wall is a candidate at all. The other has already had the work done, has a tide of damp on an internal wall that stood dry for forty winters, and wants to know whether a survey worth the name was ever carried out. Both are asking about the same wall in different tenses, and both need the same evidence: what is in the gap, what condition the outer leaf is in, what the ties are doing, and how hard the rain hits that particular elevation.

In the United Kingdom the assessment is not left to an installer's impression from the pavement. BS 8208-1, Guide to assessment of suitability of external cavity walls for filling with thermal insulants — Part 1: Existing traditional cavity construction, sets out what a pre-installation assessment is supposed to establish. Approved Document C to the Building Regulations for England treats insulation placed in an external cavity as work that must not carry moisture to the inside face, which is why the suitability check exists at all. Where the work is publicly funded, PAS 2035 puts a whole-dwelling retrofit assessment ahead of the measure, and PAS 2030 governs how it is installed. On top of all of that sits the one document written specifically for the product being blown into your wall: its British Board of Agrément certificate, which states the constructions the system may be used in and the exposure conditions it may be used under. A refusal from an installer who reads that certificate carefully is not lost business. It is the job being done.

## What the Borescope Is Being Pointed At

The gap is not spare space. In traditional cavity construction the two leaves are deliberately discontinuous so that water crossing the outer leaf — and it does cross, in every driving-rain event, on every elevation — arrives at a void it cannot bridge, runs down the cavity face, and leaves at the base. The ties are the exception the design tolerates: a small number of stiff metal links that carry wind load across the gap and are shaped, or should be shaped, to shed water before it reaches the inner leaf. Everything a survey looks for is a way that discontinuity has already been broken.

That is also the distinction the sales conversation usually skips. A wall built from the late 1970s onward with a partial-fill board in place, a clear residual cavity, and trays over every opening was designed around insulation. A 1930s or 1950s wall with a clear gap, no trays, and mortar squeezed off the back of the outer leaf onto every tie was not. Both are cavity walls. Only one of them was drawn with a fill in mind, and the survey's job is to work out which is standing in front of it.

So the borescope goes in more than once and on more than one elevation, and someone writes down what it shows. Holes go into a perpend rather than a brick face, they go in high and low, and at least one goes into the elevation that takes the weather. What comes back matters more than the fact that the drill went in.

1. Open a hole in a perpend on the exposed elevation first, high on the wall, where wind-driven rain and mortar droppings both concentrate.
2. Measure the residual clear width between the leaves — not the nominal width the era of the house suggests, and not the width at one hole taken as the width everywhere.
3. Look down the cavity for mortar extrusions off the back of the outer leaf, droppings resting on ties, and debris heaped at the base against the damp-proof course.
4. Find a tie, and look at it: type, condition, whether it slopes toward the outer leaf as it should, and whether it is carrying a bridge of hardened mortar.
5. Check whether the cavity is already filled, or partly filled, or holds a partial-fill board with a residual gap that a second product would now be blown into.
6. Record whether the inner leaf face is wet, stained, or dark, and photograph every hole with the depth gauge in shot before it is pointed up.

Drawing, What a filled cavity wall holds, outer leaf inwards: _A masonry cavity wall taken through its thickness from the weather face inwards: the outer leaf that takes the rain, the metal ties that cross the gap and carry wind load, the cavity itself with the insulant blown into it, the inner leaf carrying the floors, and the plaster and its air seal on the room side._

- **Outer leaf**: takes the driving rain and is expected to let some of it through; its brick, its pointing and its exposure decide whether the wall is a candidate ([Brick Initial Rate of Absorption (IRA) Calculator](https://craftquantities.com/calculators/materials-quantities/brick-ira-calculator/))
- **Wall ties**: the only structural link between the leaves, laid out on a grid the governing document sets, and hidden permanently the day a fill goes in ([Brick Veneer Wall Tie Density Calculator](https://craftquantities.com/calculators/materials-quantities/wall-tie-density-calculator/))
- **Cavity fill**: bead, blown fibre or foam occupying the void that used to be the capillary break, ordered against clear width times net elevation area ([Cavity Wall & Stud Bay Insulation Fill Calculator](https://craftquantities.com/calculators/materials-quantities/cavity-fill-volume-calculator/))
- **Inner leaf**: block or brick carrying the floors and the roof, and the surface every internal damp complaint is eventually read off ([R-Value Calculator](https://craftquantities.com/calculators/insulation-efficiency/r-value-calculator/))
- **Plaster and air seal**: the room-side finish whose continuity decides how much warm wet air reaches the masonry behind it

Enter the clear width measured at the survey holes, zero for the stud thickness on a masonry wall, the elevation with its windows and doors taken off, and the hole grid, installed density and bale mass from the system's certificate: the bags it returns are the figure the installer's delivery ticket should agree with, and a wall that took far fewer than that tells you the cavity was not empty. The page runs [Cavity Wall & Stud Bay Insulation Fill Calculator](https://craftquantities.com/calculators/materials-quantities/cavity-fill-volume-calculator/) here.

## Whether the Outer Leaf Can Be Trusted to Stay on the Outside

Rain load is not the same on two houses in the same street, let alone two counties. BS 8104, Code of practice for assessing exposure of walls to wind-driven rain, is the document that turns local wind and rainfall into an exposure category for a given wall, and BS EN ISO 15927-3 covers the calculation of a driving rain index for a vertical surface from hourly climate data. This matters more than any other single input, because the exposure category is what most Agrément certificates use to limit where their system may be used: the same bead, in the same cavity width, is acceptable on a sheltered mid-terrace and refused on an exposed gable with no roof overhang. A surveyor who has not established which category the elevation sits in has not started the assessment.

Then the leaf itself. Cracked or eroded perpends, spalled and frost-damaged faces, a hard cement render crazed over soft brick, brickwork that has been painted with something impermeable, a chimney breast with open flaunching, a single-skin outrigger returning into the cavity wall — every one of these lets more water into the gap than the gap was designed to shed, and none of them is repaired by putting insulation behind it. Fill is not a waterproofing measure and no certificate claims it is. The order of work runs the other way: make the leaf good, let it dry through a season, then reassess.

There is also a consequence of filling that is easy to leave out of the sales conversation, and it works against the outer leaf. Once the cavity is insulated, the outer leaf loses most of the heat that used to leak out through it. It therefore runs colder and stays wet for longer after each event, which raises the number of freeze-thaw cycles it experiences while saturated. On a leaf built from bricks with a freeze-thaw designation appropriate to a sheltered wall — the durability designations sit in BS EN 771-1, Specification for masonry units — Clay masonry units — that change of regime is exactly how a wall that had been stable for decades starts shedding faces after a fill.

Absorption is where the leaf's character shows up as a number. The initial rate of absorption test in ASTM C67 and its European counterpart in BS EN 772-11 measure how fast a dry unit pulls water in through the bed face in the first minute. Be honest about what that tells you: IRA is a bricklaying number, used to decide whether a unit needs docking before it is laid so it does not rob the mortar of its water. It is not a rain-resistance rating and no one should present it as one. It is useful here for a narrower reason — a very thirsty leaf on an exposed elevation, laid dry into a strong mortar decades ago, is a leaf whose bed joints were probably poorly bonded from day one, and open bed joints are how bulk water reaches ties.

If a brick has come out of the wall for a repair or a sample extraction, the one-minute absorption test is cheap to run and puts a figure on the suction the original mortar was fighting — read it as evidence about the bond in those bed joints, not as a measure of how much rain the leaf keeps out. The page runs [Brick Initial Rate of Absorption (IRA) Calculator](https://craftquantities.com/calculators/materials-quantities/brick-ira-calculator/) here.

## The Ties Are the Thing You Never See Again

Wall ties carry every unit of wind load across the cavity, and a fill buries them for the remaining life of the building. Any question about their condition has to be settled before the hose goes in, because afterwards the only way to inspect one is to take bricks out. In pre-1980s housing the tie is usually a galvanised steel strip or a twisted wire, and the galvanising has a finite life in a damp cavity, especially where black ash mortar was used. Corroding steel expands as it goes, and expanding steel in a bed joint jacks the outer leaf upward.

That produces the diagnostic every surveyor should know before they ever look at insulation: horizontal cracking in the bed joints at a regular vertical interval, matching the tie rows rather than any pattern of settlement, along with joints that look thicker than the ones above and below, a bulged panel, and a lifted gable or verge. Where those appear, the wall is a tie replacement job, and it is a structural one. Nothing about filling the cavity is the next step. Fill placed against corroding ties simply guarantees that the eventual repair is done blind, through a cavity full of wet material.

What the ties are supposed to be is written down. BS EN 845-1, Specification for ancillary components for masonry — wall ties, tension straps, hangers and brackets, covers the component; PD 6697, Recommendations for the design of masonry structures to BS EN 1996-1-1 and BS EN 1996-2, is where UK practice for their spacing and density lives, and it is the document a remedial tie scheme will be designed against. Do not take the count from the era of the house: on any wall built before the current recommendations, a metal detector survey and a few opened joints tell you what is actually there, which in a surprising number of houses is fewer ties than anybody assumed and none at all around the openings.

This one applies the IRC and IBC area-per-tie coverage rule, which is a denser grid than the roughly 900 by 450 millimetre arrangement UK practice works to — so use it for the order of magnitude on an elevation, then check the number against the document that governs your wall before quoting it at anybody. The page runs [Brick Veneer Wall Tie Density Calculator](https://craftquantities.com/calculators/materials-quantities/wall-tie-density-calculator/) here.

## The Base of the Cavity Is a Drain, and the Fill Lands on It

Water in a cavity has to leave somewhere, and it leaves at the bottom: down the inner face of the outer leaf, onto a damp-proof course or a cavity tray, out through weep holes in the course above. That drainage path is the reason an unfilled cavity tolerates a leaky outer leaf for years without anything showing indoors. It is also the first thing a survey should look at, because if the path is already compromised, the fill converts an intermittent nuisance into a permanent one — bulk water that used to run down a clear face and out now has a wet material to soak into and hold against the inner leaf.

Two failures dominate. The first is debris: mortar droppings heaped on the damp-proof course until they form a ramp from the outer leaf to the inner one, and snots squeezed off the back of the outer leaf that hang on ties like shelves. The second is missing trays. Cavity trays over openings, at abutments, above air bricks and wherever the cavity is interrupted were not standard in older construction, and where they are absent the head of every window is an unprotected bridge that the fill will now be pressed against. Neither failure is visible from outside, and neither is fixed by the person holding the hose.

Weeps are the checkable half of it. Count what the elevation ought to have above each tray and at the base course, then count what it actually has, and count again after any fill: an open perpend that has been rendered over, painted shut, or blown full of bead is a drainage point that no longer exists. Guidance on spacing differs by jurisdiction, so use the one that governs the wall — NHBC Standards for external masonry walls in UK housing, or the adopted building code elsewhere — and treat any run with no weeps at all as a finding that goes in writing.

Set the spacing your governing document requires rather than the default, and the count it returns is the number to walk the elevation with — both before the decision and again on the day the scaffold comes down. The page runs [Cavity Wall Weep Hole Spacing Calculator](https://craftquantities.com/calculators/materials-quantities/cavity-wall-weep-hole-calculator/) here.

## Everything That Still Has to Breathe on Monday Morning

A surprising amount of an ordinary house depends on the cavity staying open in specific places. Sleeved vents cross it to serve the void under a suspended timber floor; air bricks feed appliance ventilation; balanced flue terminals and extract ducts pass through it; a cavity barrier closes it at a party wall or at the eaves. Every one of these is a place the fill has to be kept out of, locally and deliberately, and keeping it out is not the same as stopping the drill pattern short — beads flow, and a broken or corroded sleeve fills from the inside. Blocking an underfloor void is how a fill turns into a joist-end problem three years later, and blocking combustion air is a great deal more serious than that.

So the survey marks them up on an elevation drawing, the installer works to that drawing, and someone checks the sleeves and terminals afterwards from both ends. Where the wall carries a cavity barrier, the fill also has to respect the compartmentation the barrier exists for, which is a question for whoever is responsible for fire separation in that building rather than for the insulation crew.

Counting the openings a run of wall should carry, at the spacing that applies to it, gives the schedule to mark on the elevation before the work and the list to walk with a torch afterwards — a vent that no longer draws is easier to find when you know how many there were. The page runs [Brick Veneer Cavity Drainage Vent Spacing Calculator](https://craftquantities.com/calculators/materials-quantities/cavity-drainage-vent-calculator/) here.

## The Survey Has Four Answers, and Only One of Them Is Yes

A properly conducted assessment can land in one of four places: the wall is suitable as it stands; it is suitable once specified remedial work is done and it has been re-surveyed; it is suitable only with a different system from the one being offered; or it is not suitable at all. Commercial pressure collapses that into two, and the middle two are where most of the damage is done — a wall that needed repointing and two trays first gets filled anyway, and the failure is then blamed on the material.

Ask for the verdict in writing, with the exposure category named, the measured clear widths listed hole by hole, the tie observations recorded, and the certificate reference of the system being installed. If it is a scheme job, the retrofit assessment sits behind all of that and is worth reading. The value of a written refusal is easy to underrate: it is the document that stops the same wall being sold the same measure by three more companies over the following winter.

**What the survey finds, and what each finding does to the decision**

| Finding at the hole | What it changes | Who has to settle it |
|---|---|---|
| Clear width below the certificate's stated minimum | That system cannot be used here; a different product, or none | Installer, against the Agrément certificate for the system offered |
| Mortar extrusions or droppings bridging the leaves | Fill would be laid onto a path water is already using | Surveyor, with enough holes opened to know how widespread it is |
| Ties corroded, sparse or absent around openings | Structural repair first; the fill is not the next job | Structural engineer, before anything is injected |
| Outer leaf spalled, cracked, painted or hard-rendered | Repair, then a drying season, then reassess the same wall | Surveyor, after the elevation has been made good |
| No trays over openings, or trays that stop short of the reveal | Every head becomes a bridge the day the cavity is filled | Whoever will own the consequence, named in writing |
| Sleeved vents, flue terminals or a suspended timber floor | Fill excluded locally and verified from both ends afterwards | Installer, working to a marked-up elevation drawing |

## What the Fill Is Worth Once the Rest of the Wall Is Counted

The fill does not add its resistance to a wall that had none. It replaces a layer that was already doing a little: the tabulated resistance of an unventilated air cavity in BS EN ISO 6946 is modest, of the order of a fifth of a square-metre-kelvin per watt for a still gap with ordinary surfaces, and a cavity that is ventilated to outside is worth even less. The honest sum is therefore the whole assembly built up layer by layer, twice — as it stands, and as it would stand filled — using design values from BS EN ISO 10456, Building materials and products — Hygrothermal properties — Tabulated design values, rather than a headline figure from a leaflet.

Two things routinely get left out of that sum and both flatter the fill. The first is the rest of the wall: the two masonry leaves, the plaster, the render, and the internal and external surface films together carry a real share of the resistance, so the proportional improvement is always smaller than the ratio of the insulation's own R-value to zero. The second is moisture. Tabulated design values assume a material at a design moisture content; a fill that gets wet in service, or a leaf that is saturated for weeks at a time, does not perform at its dry value, which is another reason the exposure question comes before the thermal one.

Watch the units when you compare anything to anything. A metric resistance in square-metre-kelvin per watt and an imperial R-value in hour-square-foot-Fahrenheit per BTU differ by a factor of about 5.678, so an unconverted metric figure dropped into an imperial calculation reads as a wall five times worse than it is, and an unconverted imperial figure reads as a miracle. Get the whole build-up into one system of units before adding anything.

Add the layers twice, once with the cavity as found and once with it filled, and the difference between the two totals is the honest claim for the measure. Two things about the form itself: it works in imperial R, so multiply any metric layer value by 5.678 before entering it, and it carries three layer slots with the internal and external surface films already allowed for — so group the build-up into outer leaf, cavity, and inner leaf with its plaster, and do not enter the films a second time. The page runs [R-Value Calculator](https://craftquantities.com/calculators/insulation-efficiency/r-value-calculator/) here.

## Reading the Number Printed on the Quote

Most quotes state a before-and-after U-value in watts per square metre kelvin. Ask where the pair came from. In scheme work they are usually the standard assumptions a reduced-data energy assessment applies to a wall of that age and description, not a measurement of this wall with its actual leaf thicknesses, its actual clear width and its actual condition. The target the work is being judged against, meanwhile, sits in the energy conservation guidance for the jurisdiction — Approved Document L in England and Wales, Section 6 of the Technical Handbooks in Scotland, Technical Booklet F in Northern Ireland — and is expressed the same way.

Converting that number into the resistance the product is labelled with is the only way to compare the quote with the material. The reciprocal is exact and the conversion is arithmetic; the trap is the unit. For the same wall, the metric transmittance in watts per square metre kelvin is about 5.678 times its imperial counterpart, so a metric U-value has to be divided by 5.678 before it goes anywhere near an imperial calculation. Skip that division and the reciprocal comes back about five times too small: a wall quoted at 0.30 watts per square metre kelvin is R-19 in imperial terms and reads as R-3.3 if the unit is never converted. That error runs against the wall rather than for it, which is exactly why it survives unchallenged — a figure that makes your own house look worse is not one anybody rushes to query, and it has sold a great deal of insulation that was never needed.

Turn the transmittance on the quotation into the resistance on the bag: this one takes an imperial U-value, so a quote written in watts per square metre kelvin has to be divided by 5.678 before it is entered — put the metric number in raw and the reciprocal returns about a fifth of the real resistance, which reads as a far worse wall than the quote is claiming. The page runs [U-Value to R-Value Calculator](https://craftquantities.com/calculators/insulation-efficiency/u-value-to-r-value-calculator/) here.

## The Cold Lines That Survive the Fill

A filled cavity does not warm the whole inside face evenly, and the pattern of what stays cold is the most common complaint after an otherwise sound job. Window and door reveals, where the two leaves close together and the cavity narrows to nothing; lintels, particularly steel ones spanning both leaves; joist ends and the floor line; the junction with a party wall; and the ties themselves, which are point bridges rather than areas. When mould appears in a rectangle around a window that never had it before, the fill did not cause moisture — it lowered the surface temperature everywhere except the bridges, which raised the relative humidity at the coldest lines and let growth start there first.

Sizing that effect properly is a two-tool problem, and the tools are not interchangeable. Linear and point bridges — the reveal, the lintel, the tie — are handled as psi and chi values calculated to BS EN ISO 10211, Thermal bridges in building construction — Heat flows and surface temperatures — Detailed calculations. Whether a given junction will actually grow mould is a surface temperature question, answered against a temperature factor using the method in BS EN ISO 13788, with BRE Information Paper IP 1/06 the usual reference for the criterion applied to dwellings.

What an area-weighted parallel-path calculation gives you is the other half: a strip of the wall that stays uninsulated across a known fraction of its area. Use it where the geometry really is a fraction of area, and a large enough fraction to be worth the arithmetic — a band at the floor line, a section of cavity the fill never reached, an elevation so full of openings that the reveals add up to a tenth of it — and use the standards above where the bridge is a line or a point. Reaching for the area method on a wall tie produces a number, and the number means nothing.

For the parts of the elevation where the bridge is genuinely a share of area — an unfilled band at the floor line, a section of cavity the fill never reached — the parallel-path arithmetic gives the effective figure the whole wall deserves rather than the one the fill claims. Read the fields past their labels: they are written for timber studs, so the cavity figure is the filled build-up, the framing figure is the same wall left unfilled, and the fraction stops at a tenth — which fits a floor band and does not fit a run of reveals. The page runs [Thermal Bridging Effective R-Value Calculator](https://craftquantities.com/calculators/insulation-efficiency/thermal-bridging-calculator/) here.

## When the Fill Is Already In and the Wall Is Wet

Start by establishing that the fill is the problem rather than the coincidence. Damp appearing on an internal wall within a year or two of an installation, patchy rather than a level tide mark, worse on the elevation that takes the weather, worse after storms and better in a dry spell, is the shape of a cavity that has stopped draining. A tide mark at a constant height above the floor across several walls, including internal ones, is a different mechanism entirely and the fill is not responsible for it. That distinction is worth settling before anybody is accused of anything.

Then get physical evidence, because a moisture meter waved at plaster will not carry an argument. Remove a brick from the affected elevation, low and high, and look at the fill in place: whether it is wet, whether it is slumped, whether there are voids above it, whether it is bridging onto the inner leaf. Take a sample out, weigh it wet, dry it, weigh it again. Photograph the cavity face of the outer leaf while the hole is open, because mortar snots and hanging droppings are visible then and never again.

The guarantee is the next call, not the last. Most UK residential fills carry a twenty-five year guarantee through the Cavity Insulation Guarantee Agency, and the process runs through the installer first; the certificate reference, the installation date and the survey record are what the claim is built from. This is precisely why the paperwork from the original survey matters, and why a homeowner who was never given it should ask for it now rather than after a dispute has started.

Extraction is a real remedy and a substantial one. The material comes out through openings cut in the outer leaf, usually by removing bricks at intervals and vacuuming, and the elevation is rebuilt and repointed afterwards. It is more disruptive than the installation was and it is scaffolded work. Budget for the leaf to look different where it has been rebuilt, and for the pointing to be an obvious repair unless someone takes trouble with the mix and the joint profile.

The last point is the one most easily missed in the relief of getting the fill out. Extraction restores the capillary break; it does not repair the outer leaf, the missing trays, the corroded ties or the blocked weeps that let water into the cavity in the first place. A wall that was leaking before the fill goes back to leaking after the extraction, quietly, into a gap that drains — which is tolerable, and is exactly the condition it was in before. If the wall is to be insulated at all after that, the repairs are the first job, the reassessment is the second, and the product decision is the third.

## The Evidence to Gather Before Anybody Drills a Hole

Six facts settle this decision, and every one of them is cheap to establish before the work and expensive to establish after it.

- **Exposure category for each elevation**: Assessed to BS 8104 rather than guessed from the postcode, because it is what the system's certificate limits itself against.
- **Measured clear width, hole by hole**: Recorded per hole with the location noted, not a single reading taken as the width of the whole wall.
- **Tie type, condition and count**: A metal detector survey plus opened joints; corroding or missing ties make this a structural job before it is an insulation one.
- **Outer leaf condition on the weather elevation**: Perpends, spalling, render, paint and flaunching, with repairs and a drying season ahead of any reassessment.
- **Drainage path at the base and over every opening**: Trays present or absent, weeps counted and clear, debris on the damp-proof course photographed while a hole is open.
- **Every service that crosses the cavity**: Sleeved vents, air bricks, flue terminals and extract ducts marked on an elevation drawing that the installer works to.

Calculators for these quantities: [Cavity Wall & Stud Bay Insulation Fill Calculator](https://craftquantities.com/calculators/materials-quantities/cavity-fill-volume-calculator/), [Brick Veneer Wall Tie Density Calculator](https://craftquantities.com/calculators/materials-quantities/wall-tie-density-calculator/), [Cavity Wall Weep Hole Spacing Calculator](https://craftquantities.com/calculators/materials-quantities/cavity-wall-weep-hole-calculator/), [Brick Initial Rate of Absorption (IRA) Calculator](https://craftquantities.com/calculators/materials-quantities/brick-ira-calculator/), [R-Value Calculator](https://craftquantities.com/calculators/insulation-efficiency/r-value-calculator/), [Thermal Bridging Effective R-Value Calculator](https://craftquantities.com/calculators/insulation-efficiency/thermal-bridging-calculator/).

## Calculators this guide uses

- [Cavity Wall & Stud Bay Insulation Fill Calculator](https://craftquantities.com/calculators/materials-quantities/cavity-fill-volume-calculator/)
- [Brick Initial Rate of Absorption (IRA) Calculator](https://craftquantities.com/calculators/materials-quantities/brick-ira-calculator/)
- [Brick Veneer Wall Tie Density Calculator](https://craftquantities.com/calculators/materials-quantities/wall-tie-density-calculator/)
- [Cavity Wall Weep Hole Spacing Calculator](https://craftquantities.com/calculators/materials-quantities/cavity-wall-weep-hole-calculator/)
- [Brick Veneer Cavity Drainage Vent Spacing Calculator](https://craftquantities.com/calculators/materials-quantities/cavity-drainage-vent-calculator/)
- [R-Value Calculator](https://craftquantities.com/calculators/insulation-efficiency/r-value-calculator/)
- [U-Value to R-Value Calculator](https://craftquantities.com/calculators/insulation-efficiency/u-value-to-r-value-calculator/)
- [Thermal Bridging Effective R-Value Calculator](https://craftquantities.com/calculators/insulation-efficiency/thermal-bridging-calculator/)
- [Blown-In Insulation Bag Count Calculator](https://craftquantities.com/calculators/materials-quantities/blown-insulation-bag-calculator/)
- [Vapor Barrier Dew-Point Condensation Risk Calculator](https://craftquantities.com/calculators/materials-quantities/vapor-barrier-dewpoint-calculator/)
- [R-Value to U-Value Calculator](https://craftquantities.com/calculators/insulation-efficiency/r-value-to-u-value-calculator/)
- [Cavity Wall Drainage Mat Area Calculator](https://craftquantities.com/calculators/materials-quantities/cavity-drainage-mat-calculator/)
- [Brick Calculator](https://craftquantities.com/calculators/materials-quantities/brick-calculator/)
- [Air Changes Per Hour (ACH50) Calculator](https://craftquantities.com/calculators/insulation-efficiency/air-changes-per-hour-calculator/)
- [U-Value Metric to Imperial Converter (W/m²K to BTU/hr·ft²·°F)](https://craftquantities.com/calculators/insulation-efficiency/u-value-si-to-imperial-calculator/)

## See also

- [Telling Rising Damp, Penetrating Damp and Condensation Apart](https://craftquantities.com/guides/how-to-diagnose-damp-in-a-house/)
- [Cavity Trays Where an Extension Roof Meets the House](https://craftquantities.com/guides/how-to-fit-a-cavity-tray-at-a-roof-abutment/)
- [Insulating a Wall Without Thermal Bridges](https://craftquantities.com/guides/how-to-insulate-a-wall/)
- [Dry-Lining a Solid Wall](https://craftquantities.com/guides/how-to-dry-line-a-solid-wall/)
- [Building a Brick Veneer Wall That Drains](https://craftquantities.com/guides/how-to-build-a-drained-brick-veneer/)

## Sources

- BS 8208-1, Guide to assessment of suitability of external cavity walls for filling with thermal insulants — Part 1: Existing traditional cavity construction
- BS 8104, Code of practice for assessing exposure of walls to wind-driven rain
- BS EN ISO 15927-3, Hygrothermal performance of buildings — Calculation and presentation of climatic data — Part 3: Calculation of a driving rain index for vertical surfaces from hourly wind and rain data
- BS 5617, Specification for urea-formaldehyde (UF) foam systems suitable for thermal insulation of cavity walls with masonry or concrete inner and outer leaves
- BS 5618, Code of practice for thermal insulation of cavity walls (with masonry or concrete inner and outer leaves) by filling with urea-formaldehyde (UF) foam systems
- PD 6697, Recommendations for the design of masonry structures to BS EN 1996-1-1 and BS EN 1996-2
- BS EN 845-1, Specification for ancillary components for masonry — Wall ties, tension straps, hangers and brackets
- BS EN 771-1, Specification for masonry units — Clay masonry units
- BS EN 772-11, Methods of test for masonry units — Determination of water absorption due to capillary action and the initial rate of water absorption of clay masonry units
- ASTM C67, Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile
- BS EN ISO 6946, Building components and building elements — Thermal resistance and thermal transmittance — Calculation methods
- BS EN ISO 10456, Building materials and products — Hygrothermal properties — Tabulated design values and procedures for determining declared and design thermal values
- BS EN ISO 10211, Thermal bridges in building construction — Heat flows and surface temperatures — Detailed calculations
- BS EN ISO 13788, Hygrothermal performance of building components and building elements — Internal surface temperature to avoid critical surface humidity and interstitial condensation — Calculation methods
- BRE Information Paper IP 1/06, Assessing the effects of thermal bridging at junctions and around openings
- PAS 2035, Retrofitting dwellings for improved energy efficiency — Specification and guidance
- PAS 2030, Specification for the installation of energy efficiency measures in existing dwellings
- Approved Document C, Site preparation and resistance to contaminants and moisture (England and Wales)
- Approved Document L, Conservation of fuel and power (England and Wales); Section 6 of the Technical Handbooks (Scotland); Technical Booklet F (Northern Ireland)
- British Board of Agrément certificate for the specific cavity fill system, and the Cavity Insulation Guarantee Agency guarantee terms
- NHBC Standards, external masonry walls

---
Source: https://craftquantities.com/guides/how-to-decide-if-a-cavity-can-be-filled/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.