# Reinforcing bar for a 7.2 by 6 m detached garage slab in Canada

> A 7.2 x 6 m garage slab in Canada, gridded in metric bar with the rebar calculator: bars each way, sticks to order, a bar schedule and the weight.

Page: https://craftquantities.com/examples/calculators/rebar-7-2-x-6-m-garage-slab-10m-bars/ (worked example). This is the page's Markdown copy; the HTML page is the canonical version.

A detached garage slab 7.2 m by 6 m, gridded both ways in the smallest Canadian metric bar, comes to 18 x 12 m sticks with the calculator's lap allowance. The bar-by-bar schedule beside it tells a slightly different story, and this page shows why both are worth reading.

- 18 x 12 m sticks The answer
- 5 Steps shown
- Canada, metric first Written for

On this page

Run it yourself

[Open these inputs in the Rebar Calculator](https://craftquantities.com/calculators/materials-quantities/rebar-calculator/#slabLength=7.2&slabWidth=6&gridSpacingIn=18&lapSplicePercent=15&barSize=0.0113&edgeCover=0.075&lapLength=0.6)

## The job

Modelled, not recorded. Every figure here is the answer the Rebar Calculator gives for these inputs, written down in both unit systems and re-run whenever the site is built. No job was carried out, so there is no measured overrun on this page.

The garage stands apart from the house at the end of the driveway, on a slab 7.2 m long and 6 m wide. Its drawing shows a grid of bar both ways at the middle of the slab's depth, held off the base on chairs, stopping short of the formwork on every side. That drawing is the starting point: the steel on this page is counted from it, not chosen by it.

The bar is entered as 10M (11.3 mm), Canada, the size a Canadian reader's page opens on and the smallest in the metric series that Canadian mills roll under CSA G30.18. Its designation is a nominal size in millimetres, which is why a Canadian order never mentions the American number sizes; a supplier there stocks the metric bar in metric stock lengths. The spacing is the calculator's middle option in metric, 450 mm (~18 in, typical residential), and the cover at the edges is 75 mm, both as a typical residential drawing might show them.

Whether a detached garage slab needs bar at all, what size and at what spacing is the designer's call, and the documents a Canadian drawing points to are the National Building Code, Part 9, as the province adopts it, and CSA A23.1 for the concrete and its reinforcement. This page counts what is drawn and certifies nothing; the municipality's building department and the designer of record decide.

[Open this job in the calculator](https://craftquantities.com/calculators/materials-quantities/rebar-calculator/#slabLength=7.2&slabWidth=6&gridSpacingIn=18&lapSplicePercent=15&barSize=0.0113&edgeCover=0.075&lapLength=0.6)

[Embed this calculator on your own page](https://craftquantities.com/embeds/#calculator=rebar-calculator)

Every figure is worked again by the real calculators, in both unit systems; nothing is priced and nothing is saved until you press Use as my project.

## The inputs, exactly as entered

**Every input the calculator takes for this job, and why it is what it is**

| Input | Value | Why |
|---|---|---|
| Slab Length | 7.2 m (23.62 ft) | The slab's outside length between the forms; the calculator takes the cover off each end before it spaces the bars. |
| Slab Width | 6 m (19.69 ft) | The other side, also between the forms, square to the length. |
| Grid Spacing (on-center) | 450 mm (~18 in, typical residential) (18 in (typical residential)) | Left at the calculator's own default. |
| Lap-Splice Allowance (%) | 15 | Left at the calculator's own default. |
| Bar size | 10M (11.3 mm), Canada | The bar a Canadian reader's page opens on, the one a Canadian drawing calls for on a light slab. It changes the schedule's weight, not how many bars are counted. |
| Edge cover to the bars (0 for none) | 75 mm (2.95 in) | The clear distance from the formwork to the nearest bar, as the drawing gives it; it shortens every bar and narrows the area the grid spans. |
| Lap length at each splice, for the schedule | 600 mm (23.62 in) | Left at the calculator's own default. |

## The working, step by step

1. ### 1. Bars running lengthwise

   13 bars

   The grid's width, less the cover on both sides, is divided by the spacing, and one more bar is added because a row of bars has a bar at each end: 13 bars run the length of the slab. It is the fence-post rule, and forgetting the extra bar is the commonest slip in counting a grid by hand.
2. ### 2. Bars running widthwise

   16 bars

   The same rule across the other way, over the longer dimension, gives 16 bars running the width. Each set is laid over the other and tied at the crossings, so between them they make the mat the drawing shows.
3. ### 3. Total bar length (incl. 15% lap splice)

   213 m (698.9 ft)

   Every bar's length times its count, both ways, plus the calculator's lap allowance of 15 per cent, comes to 213 m (698.9 ft). The percentage is a rule of thumb for the steel lost to overlaps where one bar continues another, and it is what the headline divides into stock lengths to reach 18 x 12 m sticks.
4. ### 4. Schedule: each lengthwise bar, as laid with its laps

   7.05 m (23.13 ft)

   The schedule measures the same mat bar by bar instead. A lengthwise bar, cover taken off both ends, is 7.05 m (23.13 ft), and a widthwise one is 5.85 m (19.19 ft). Both are shorter than a stock length, so the schedule finds 0 laps on this slab: no bar has to be spliced at all.
5. ### 5. Schedule: steel weight

   145.8 kg (321.5 lb)

   With no laps, the schedule's total is the bare grid, 185.3 m (607.8 ft), and multiplying by the mass of the chosen bar per metre gives 145.8 kg (321.5 lb). Weight is how steel is often priced and delivered, so this is the figure to read to a supplier along with the cut lengths.

Estimated rebar needed

18 x 12 m sticks

The headline, 18 x 12 m sticks, is the cautious order: it carries a lap allowance that this slab, whose bars all fit inside one stock length, does not actually need. The schedule shows the bare grid at 185.3 m and 145.8 kg. Either can be handed to a supplier, and many will cut and bend to the schedule; what neither does is choose the bar, which is why the calculator's confidence is medium and the drawing comes first. A US reader's page counts the same grid in American stock as 35 x 20 ft sticks.

## What to buy

**The quantities this job comes to, and what each is for**

| Quantity | Figure | What it is for |
|---|---|---|
| Estimated rebar needed | 18 x 12 m sticks | Stock lengths of the metric bar, to cut on site; or hand the supplier the schedule's cut lengths and counts instead. |

## The allowance, and what it does here

The calculator's allowance here is the lap percentage, 15 per cent, and it is the right default for a slab large enough that bars must be joined. On this slab none are, which the schedule proves, so the allowance becomes a margin for offcuts and for bars that get bent or lost on site. Keep it, or order from the schedule and add a few bars by hand; what is wasted on a grid like this is not the laps but the short ends left from each stock length, which the stick count does not see.

## The common mistake

### Ordering sticks by total length when the bars do not nest

A stick count made by dividing the total length by a stock length assumes every offcut is used somewhere. On this slab the lengthwise bars are each a little over half a stock length, so each stick yields one lengthwise bar and an offcut too short to make a widthwise one, while the widthwise bars fit two to a stick. Counted bar by bar, the cuts need more sticks than the total length suggests. Before ordering, lay the schedule's two cut lengths into the stock length on paper, or ask the supplier to cut to the schedule; the headline is a quantity of steel, not a cutting plan.

## Change the job, and see what moves

- ### The same slab, on a closer grid

  Grid Spacing (on-center): 300 mm (~12 in, heavier-duty slabs) (12 in (heavier-duty slabs)) → 27 x 12 m sticks

  Tighten the grid to 300 mm (~12 in, heavier-duty slabs), as a drawing might for a heavier vehicle, and the count rises to 20 bars one way and 24 bars the other, 27 x 12 m sticks in all and 221.5 kg of steel. Spacing moves this order more than anything else on the page, which is why it is the designer's to set.
- ### The same slab, with no lap allowance

  Lap-Splice Allowance (%): 0 → 16 x 12 m sticks

  Take the lap allowance to 0, which this slab can justify because the schedule shows no splices, and the order drops to 16 x 12 m sticks. It matches the schedule's bare total exactly; whether it is enough sticks for the cuts is the question the mistake above answers.

## What to run next

- [Concrete Calculator](https://craftquantities.com/calculators/materials-quantities/concrete-calculator/)

  The slab's concrete is counted from the same length and width, with the thickness the drawing gives, and the bar grid sits in the middle of it.
- [Rebar Weight Calculator](https://craftquantities.com/calculators/materials-quantities/rebar-weight-calculator/)

  For a delivery quoted by weight, or a bar size other than this one, the weight calculator turns any total length into mass.
- [Gravel Base Layer Tonnage Calculator](https://craftquantities.com/calculators/materials-quantities/gravel-base-tonnage-calculator/)

  Under the slab a compacted granular base is ordered by the tonne, and the chairs that hold the bar stand on it.

## Sources

The method and every constant behind these figures belong to the [Rebar Calculator](https://craftquantities.com/calculators/materials-quantities/rebar-calculator/), version 1.3.0, last verified 2026-10-31. It rests on:

- Rebar is most commonly sold in 20 ft lengths in North America and in 12 m mill lengths in metric markets (6 m being the common short length); grid spacing for residential slabs is commonly 12-18 in (300-450 mm) on-center in both directions
- A lap-splice allowance, 15% by default, is added to account for the overlap required where rebar sticks join end-to-end across a run longer than one stock length, per common ACI 318 lap-length practice
- Reinforcing bar mass from its nominal diameter, 7850 kg/m³ x π d² / 4: 10 mm 0.617 kg/m, 12 mm 0.888 kg/m (BS 4449 tables); #3 0.376, #4 0.668, #5 1.043 lb/ft (ASTM A615 Table 1); Canadian 10M 11.3 mm nominal (CSA G30.18)

## Frequently asked questions

**How much rebar does a 7.2 by 6 m garage slab need?**

At 450 mm (~18 in, typical residential) both ways with 75 mm of cover, 13 bars run the length and 16 bars the width. With the 15 per cent allowance that is 18 x 12 m sticks; the bare grid is 185.3 m.

**Why does the schedule show no laps?**

Because every bar on this slab is shorter than a stock length: 7.05 m one way and 5.85 m the other. Bars only need lapping where one has to continue another.

**How heavy is the steel for this slab?**

In the metric bar entered here, 145.8 kg for the bare grid. A closer spacing of 300 mm (~12 in, heavier-duty slabs) would take it to 221.5 kg.

## More worked calculator examples

- [An Australian garage slab, with mesh sheets Concrete and Mesh for a 6 x 6 m Garage Slab](https://craftquantities.com/examples/calculators/concrete-garage-slab-6-x-6-m-mesh-australia/)
- [A garden shed base, in cubic metres Concrete for a 3.6 x 2.4 m Shed Base](https://craftquantities.com/examples/calculators/concrete-shed-base-3-6-x-2-4-m/)
- [A rectangular slab, in cubic yards Concrete for a 20 x 30 ft Slab: How Many Yards](https://craftquantities.com/examples/calculators/concrete-slab-20-x-30-ft/)
- [A cast concrete flight on a waist slab Concrete Stair, 2.8 m Cast Flight: Concrete, Forms, Bars](https://craftquantities.com/examples/calculators/concrete-stair-2-8-m-cast-flight/)

### Takeoffs that run these calculators

- [Takeoff: Basement or foundation wall (poured concrete)](https://craftquantities.com/build/basement-wall/)
- [Takeoff: Concrete driveway](https://craftquantities.com/build/concrete-driveway/)
- [Takeoff: Strip footing](https://craftquantities.com/build/strip-footing/)

### Comparisons that weigh them

- [Compare: Rebar vs Fiber Mesh in a Concrete Slab](https://craftquantities.com/compare/rebar-vs-fiber-mesh/)
- [Compare: Post-Tensioned Slab vs Rebar Slab](https://craftquantities.com/compare/post-tension-slab-vs-rebar/)

- [Material hub: Concrete](https://craftquantities.com/materials/concrete/)
- [The whole job as a takeoff: Concrete slab](https://craftquantities.com/build/concrete-slab/)
- [Guide: Detailing Rebar: Laps, Hooks and Cover](https://craftquantities.com/guides/how-to-detail-rebar/)
- [Guide: Rebar Hooks: The Length That Is Not on the Drawing](https://craftquantities.com/guides/how-to-detail-rebar-hooks-and-laps/)

---
Source: https://craftquantities.com/examples/calculators/rebar-7-2-x-6-m-garage-slab-10m-bars/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.